1 Green Marble/Orange Marble 80-90Rs/Sqft
2 Black Marble starts from 150Rs/sqft
3 Rounding of Marbles 20Rs/Runft
4 Kadappa 1.5" thk 40Rs/sqft
5
Approx wt of 30 pieces of Kadappa of 1.5" thk 6" width and 36" in length = 700Kg
Cost of Flooring of Vitrified Tiles upto 32" 155Rs/Sqft
Cost of Tile Rs 65
Cutting & Labour Rs 40
Cement Rs 30
Cleaning Rs 20
Cost of Wall Tiling upto size 24" x 18"(fitted upto 8' ht) 155Rs/runft
Cost of Tile Rs 65
Cutting & Labour Rs 40
Cement Rs 30
Cleaning Rs 20
Cost of Skirting for bathroom 145Rs/runft
Cost of Tile Rs 75
Cutting & Labour Rs 40
Cement Rs 20
Cleaning Rs 10
Payment stages for fixing of mosaic tiles as per Mantri
On completion of
1
fixing tiles.
On completion of
2
first coat + grouting.
On completion of
3
second coat.
On completion of
3
second coat.
On completion of
4
third coat.
On completion of
fourth coat + acid
washing + cleaning
and rectification
and submission of
final bill with O.K.
clearance from site
Engineer counter
signed by P.M.
5
TOTAL
Somar Peth data
Green
1 Marble/Orange
Marble
2 Black Marble starts
from
3
Rounding of Marbles
4
Kadappa 1.5" thk
Rate per sq.
Type Origin
ft.
Rs 250 to Rs
Telephone black South India
290
Rs 180 to Rs
Normal black South India
220
Rs 120 to Rs
Lower black South India
160
Rs 250 to Rs
Red base Rajasthan
290
Rs 150 to Rs
other colours Rajasthan
230
Labour cost for Fixing Granite is 10to15Rs/sqft
Payment stages for fixing of GLAZED/SPARTEK/CERAMIC/MRUDUL/SHON
ri TILING as per Mantri
50% 1 On completion of fixing.
On completion of first
25% 2
coat of acid cleaning
On completion of
second coat of acid +
10% 3
10% 3 Cleaning /Jali fixing etc.
On flooring test for
water leakage.
TOTAL
5%
Brands –
Somany, Kajaria
Tiles, NITCO,
Johnson
10%
Average Rate of 30 Rs per sqft
Ceramic Tiles
Average Rate of 75 Rs per sqft
Polished Vitrified
Tiles
Average Rate of 150 Rs per sqft
Granite Flooring
Average Rate of 275 Rs per sqft
100% Italian Marble
Siddhivinayak Stones and Marbles
80-90Rs/ 1 marble starts from 65
Sqft
Granite starts from
150Rs/ 2 90/100/130/150/160/180
sqft /200
2' x 2' Tiles
20Rs/ 3 16qft/Box,4nos/box,600/1
Runft 200
12" x 18" Tiles-
4 350/450/650,9Sqft/Box,5
40Rs/sqft Nos/Box
12" x 12" Mat Finish Tiles-
5 350Rs/Box-10Sqft/Box-
10Nos/Box
6 Kadappa-1.5"
7 Kadappa-2"
Marble /Granite-Full
8
round
Marble /Granite-Half
9
round
10 Road Gattu-10" x 15"
11 Kota Farshi- 1.5' x 2'
12 Kota at step End
Notes
Totally black
Black base with grey
crystals
black with green/white
crystals
more then 15-16 colours
available
ZED/SPARTEK/CERAMIC/MRUDUL/SHON
G as per Mantri
85%
7.50%
7.50%
7.50%
100%
k Stones and Marbles
65Rs/sqft
90Rs-200RS/sqft
600Rs-1200Rs/Box
350RS-650Rs/Box
350Rs/Box
35Rs/Sqft
40Rs/sqft
40Rs/runft
30Rs/runft
4500Rs/Brass(100sqft)
3500Rs/Brass(100Sqft)
60Rs/sqft
Area Calculation of a Single Room
Area in Total
Unit Area Length Breadth Height Sqft Area in
Sqft
Floor Size 7'8" 4'9" - 36.4167 36
Bedroom Side Wall 4'9" - 7' 33.25
Entrance Side wall 1 2'3" - 7' 15.75
Bathroo Entrance Side wall 2 2'11" - 7' 20.4167
m Exhaust side Wall 4'7.5" - 7' 32.375 156
Common wall 6'8" - 7' 46.6667
Column Offset 1 1" - 7' 0.58333
Column Offset 2 12" - 7' 7
Bedroom Floor Size 14'3" 10'6" - 149.625
Room 194
Kitchen Floor Size 8' 5'6" - 44
Verandah Verandah Floor Size 10'6" 6'4.5" - 66.9375 67
Window
Sill Window 20' - 3" 5 5
Ventilato
r Ventilator 7' - 3" 1.75 2
Door D1-3'wide-Entrance 17' - 10" 14.1667
Door Door D2-2'6" wide-Bathroom 19' - 7" 11.0833 39
Door D3-2'6" wide-Courtyard 16'6" - 10" 13.75
Material and Labour Cost of a single room
Cost of Material
Area Cement Araldite Cost of Actual Qty
Tile Type Area in Number of Number of Price of Price of Price/Sqft Total Cost of consumpti Cost of cement required Araldite- of Sand
sqft Tiles Boxes per Box per Tile Tiles/Marble on per bag 300Rs/bag in Kg 950 Rs/kg required
in brass
Floor Tiles Mat Finish of Size-Ceramic-(300 x 300mm)-(1' x
1')
36 36 4 - - 30 1092.5 0.819375 245.8125 - - 0.072833
Bathroom
Bathroom
Wall Tiles of size (330mmx 457mm)-(13" x 18")-Ceramic
156 96 19 - - 30 4681.25 4.68125 1404.375 - - -
Ceramic-(600mm x 600mm)-(2' x 2')
Room 194 48 12 - - 30 5808.75 4.356563 1306.96875 - - 0.38725
Verandah Ceramic-(600mm x 600mm)-(2' x 2')
67 17 4 - - 30 2008.125 1.506094 451.828125 - - 0.133875
Green Marble 3"-Chamfer and edge polish 10mm width
Window Sill 5 - - - - 75 375 0.136364 40.9090909091 - - -
Green Marble 3"-Chamfer and edge polish 10mm width
Ventilator 2 - - - - 75 131.25 0.047727 14.3181818182 - - -
Door D1-3'wide-Green Marble 10"-Chamfer and edge polish 14 - - - - 75 1062.5 0.607143 182.142857143 0.048571 46.14286 0.004048
Door D2-2'6" wide-Green Marble 7"-Chamfer and edge
Door polish 11 - - - - 75 831.25 0.475 142.5 0.038 36.1 0.003167
Door D3-2'6" wide-Green Marble 10"-Chamfer and edge
polish 14 - - - - 75 1031.25 0.589286 176.785714286 0.047143 44.78571 0.003929
15,159.38 13.2188 3,965.64 0.133714 127.03
Subtotal cost
Total Cost i.e (Material and Labour Cost of a single room)
Material and Labour Cost of a single room
Cost of labour for work
Crush sand to be River sand to be Labour rates Labour rates for Labour rates
used is 80% of Cost of used is 20% of Cost of river Cement Cost of for fixing fixing Green for fixing Green Cost of
actual qty of sand crushsand actual qty of sand sand=8000Rs/bra grout grout i.e vitrified or Cost of labour for Marble Door Cost of labour for Marble labour for
required in brass =4500RS/b required in brass for ss required 45Rs/kg Ceramic work frame for work Window Sill for work
for ceramic and rass ceramic and vitrified in kg tiles /sqft 17.50sqft 27.50sqft
vitrified tiles tiles
0.0145666666667 65.55 0.0582666666667 466.133333333 0.619083 27.85875 14 509.833333333 - - - -
- - - - 2.496667 112.35 15 2340.625 - - - -
0.07745 348.525 0.3098 2478.4 2.3235 104.5575 14 2710.75 - - - -
0.026775 120.4875 0.1071 856.8 0.80325 36.14625 14 937.125 - - - -
- - - - 0.028571 1.285714 - - - - 45 8.181818
- - - - 0.01 0.45 - - - - 45 2.863636
- - 0.0040476190476 32.380952381 0.080952 3.642857 - - 1850 1497.619047619 - -
- - 0.0031666666667 25.3333333333 0.063333 2.85 - - 1850 1171.666666667 - -
- - 0.0039285714286 31.4285714286 0.078571 3.535714 - - 1850 1453.571428571 - -
0.1187916666667 534.56 0.4863095238095 3,890.48 6.503929 292.68 6,498.33 1,497.62 11.05
23,969.76 9,208.05
35,177.81
Level Unit Length
Rise 4'11.5"
Tread 4'11.5"
Landing 1 4'11.5"
GF to FF Landing 2 4'11.5"
Landing 3 3'10"
Landing 4a 4'8.5"
Landing 4b 6'7.5"
Rise 4'11.5"
Tread 4'11.5"
Landing 1 4'11.5"
FF to SF
Landing 2 3'10"
Landing 3a 4'8.5"
Landing 3b 6'7.5"
Area
Tile Type Area in sqft
Rise-Orange Marble 48
Tread-Green Marble-Polished 78
Landing 1-Ceramic tiles-(300 x
11
300mm)(1' x 1')
Landing 2-Ceramic tiles-(300 x
20
300mm)(1' x 1')
GF to FF
Landing 3-Ceramic tiles-(300 x
19
300mm)(1' x 1')
Landing 4a-Ceramic tiles-(300 x
34
300mm)(1' x 1')
Landing 4b-Ceramic tiles-(300 x
25
300mm)(1' x 1')
Rise-Orange Marble 48
Tread-Green Marble-Polished 78
Landing 1-Ceramic tiles-(300 x
20
300mm)(1' x 1')
FF to SF Landing 2-Ceramic tiles-(300 x
19
300mm)(1' x 1')
Landing 3a-Ceramic tiles-(300 x
26
300mm)(1' x 1')
FF to SF
Landing 3b-Ceramic tiles-(300 x
25
300mm)(1' x 1')
Subtotal cos
Total Cost i.e (Material an
Breadth Height Area in Sqft of single Unit Nos
- 6.5" 2.68576388888889 18
10.5" - 4.33854166666667 18
2'2" - 10.7430555555556 1
4'1.5" - 20.453125 1
5' - 19.1666666666667 1
7'1.5" - 33.546875 1
3'10" - 25.3958333333333 1
- 6.5" 2.68576388888889 18
10.5" - 4.33854166666667 18
4'1.5" - 20.453125 1
5' - 19.1666666666667 1
5'5.5" - 25.6996527777778 1
3'10" - 25.3958333333333 1
Number of Tiles Number of Boxes Price of per Box Price of per Tile
- - - -
- - - -
11 1 - -
20 2 - -
19 2 - -
34 3 - -
25 3 - -
- - - -
- - - -
20 2 - -
19 2 - -
26 3 - -
25 3 - -
Subtotal cost
Total Cost i.e (Material and Labour Cost)
Total Area in Sqft of
single Unit
48
78
11
20
19
34
25
48
78
20
19
26
25
Material and Labour Cost for Sta
Cost of Material
Cement consumption per Cost of cement
Price/Sqft Total Cost of Tiles/Marble
bag 300Rs/bag
75 3625.78125 1.353625 406.0875
75 5857.03125 2.186625 655.9875
30 322.291666666667 0.24171875 72.515625
30 613.59375 0.4601953125 138.05859375
30 575 0.43125 129.375
30 1006.40625 0.7548046875 226.44140625
30 761.875 0.57140625 171.421875
75 3625.78125 1.353625 406.0875
75 5857.03125 2.186625 655.9875
30 613.59375 0.4601953125 138.05859375
30 575 0.43125 129.375
30 770.989583333333 0.5782421875 173.47265625
30 761.875 0.57140625 171.421875
24,966.25 11.58096875 3,474.29
terial and Labour Cost for Staircase
Crush sand to be used is
Actual Qty of Sand 80% of actual qty of sand Cost of
required in brass required in brass for crushsand=4500RS/brass
ceramic and vitrified tiles
- - -
0.14056875 0.14056875 632.559375
0.0214861111111111 0.00429722222222222 19.3375
0.04090625 0.00818125 36.815625
0.0383333333333333 0.00766666666666667 34.5
0.06709375 0.01341875 60.384375
0.0507916666666667 0.0101583333333333 45.7125
- - -
0.14056875 0.14056875 632.559375
0.04090625 0.00818125 36.815625
0.0383333333333333 0.00766666666666667 34.5
0.0513993055555556 0.0102798611111111 46.259375
0.0507916666666667 0.0101583333333333 45.7125
0.361145833333333 1,625.16
River sand to be used is 20%
Labour rates for
of actual qty of sand Cost of river Cost of labour for
fixing vitrified or
required in brass for sand=8000Rs/brass work
Ceramic tiles /sqft
ceramic and vitrified tiles
- - - -
- - - -
0.0171888888888889 137.511111111111 14 150.40277777778
0.032725 261.8 14 286.34375
0.0306666666666667 245.333333333333 14 268.33333333333
0.053675 429.4 14 469.65625
0.0406333333333333 325.066666666667 14 355.54166666667
- - - -
- - - -
0.032725 261.8 14 286.34375
0.0306666666666667 245.333333333333 14 268.33333333333
0.0411194444444444 328.955555555556 14 359.79513888889
0.0406333333333333 325.066666666667 14 355.54166666667
0.320033333333333 2,560.27 2,800.29
32,625.96
Cost of labour for work
Labour rates for
Labour rates for fixing Cost of labour for Labour rates for fixing Cost of labour for
providing chamfer,edge
riser/runft work Tread /runft work
polish,2grooves/runft
30 2677.5 - - -
- - 30 2677.5 30
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
30 2677.5 - - -
- - 30 2677.5 30
- - - - -
- - - - -
- - - - -
- - - - -
5,355.00 5,355.00
15,536.84
50,162.80
Cost of
labour for
work
-
2677.5
-
2677.5
-
-
15,536.84
50,162.80