KING MONGKUT 'S INSTITUE OF TECHNOLOGY TH
RC-I EXCEL Reinforced Concrete Design
Stair Stair Code
Project RC-DESIGN File Name
Engineer THARIT Date
STAIR DATA
Concrete fc' = 175 ksc fc
Steel fy = 3,000 ksc fs
Span length L = 5.00 m Es
Height H = 2.74 m Ec
Tread l = 0.26 m n
Riser h = 0.19 m k
2
Live Load LL = 300 kg/m j
2
Finish Load FL = 0 kg/m R
Thickness t = 0.15 m MR
Covering d' = 0.040 m Total Load on Stair
Effective Depth d =
Require Thickness t : req =
<< Try New Thickness >>
Checking Moment and Shear Force
Moment of Main Steel M = 3,043 kg-m Maximum Shear Force Vm
Resisting Moment MR = 1,258 kg-m Allowable Shear Force Vc
<< Try New Thickness >> << Shear
As. Required of Main Steel =
REINFORCEMENT DESIGN
Main Steel Reinforcement
Diameter (mm) Spacing (m)
M-max. DB16 0.075 Use
Checking Bond Stress Devlop
Bond Stress = 8.26 ksc Development Length for RB
Allowable Bond Stress for RB = 11.00 ksc Development Length for DB
Allowable Bond Stress for DB = 26.71 ksc
<< Bond RB & DB OK >> Load on Beam
S INSTITUE OF TECHNOLOGY THONBURI
Reinforced Concrete Design by Working Stress Method
Stair Code S1
File Name EX1
Date 28-Jun-24
STAIR DATA
= 0.45fc' = 78.75 ksc
= 0.50fy = 1,500 ksc
= 2,040,000 ksc
1/2
= 15210fc' = 201,209 ksc
= Es/Ec = 10.14
= 1/(1+fs/nfc) = 0.347
= 1-k/3 = 0.884
= 0.5fckj = 12.09 ksc
2
= Rbd = 1,258 kg-m
2
Total Load on Stair W = 974 kg/m
0.102 m
0.199 m
<< Try New Thickness >>
ecking Moment and Shear Force
Maximum Shear Force Vmax = 4,869 kg
Allowable Shear Force Vc = 7,151 kg
<< Shear Force is OK >>
2
22.50 cm /m
REINFORCEMENT DESIGN
Temperature Steel Reinforcement
Diameter (mm) Spacing (m)
RB9 0.200
Devlopment Length
Development Length for RB = 0.55 m
Development Length for DB = 0.30 m
Load on Beam = 4,869 kg/m