0% found this document useful (0 votes)
65 views1 page

Beam and Column Reinforcement Schedule

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views1 page

Beam and Column Reinforcement Schedule

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

8-16 MM VERTICAL BARS 6-16 MM VERTICAL BARS

GROUND FFL GROUND FFL GROUND FFL


NGL

TIES 10MM DIA. BAR TIES 10MM DIA. BAR


3@50MM,3@75MM,4@100MM,
REST @20MM O.C.
3@50MM,3@75MM,4@100MM,
REST @20MM O.C.
SCHEDULE OF BEAMS
SCALE 1:20 M.
FTB FTB FTB

1000
1200

AT SUPPORT AT MID SPAN


250 250
6-16 MM MAIN BARS 6-16 MM MAIN BARS
6-16 MM HOR. BARS
SPACED 170MM

300
O.C. BOTHWAYS
FTB1

350

350
8-16 MM HOR. BARS 10MM DIA. STIRRUPS 10MM DIA. STIRRUPS
SPACED 150MM 3@50MM,3@75MM,4@100MM REST 3@50MM,3@75MM,4@100MM REST
300

O.C. BOTHWAYS @200MM O.C. @200MM O.C.

AT SUPPORT AT MID SPAN

DET. SEC. OF C1-F1 DET. SEC. OF C2-F2 250


3-16 MM TOP BARS
250
3-16 MM TOP BARS
SCALE 1:20 M. SCALE 1:20 M. 10MM DIA. STIRRUPS
2-16 MM EXTRA BARS 2@50MM,3@75MM,4@100MM REST
B-1

350

350
@200MM O.C.
10MM DIA. STIRRUPS
WIDTH LENGTH DEPTH REINFORCING DEPTH OF 2@50MM,3@75MM,4@100MM REST 2-16 MM EXTRA BARS
MARK @200MM O.C.
(mm) (mm) (mm) BARS EXCAVATION
3-16 MM BOTTOM BARS 3-16 MM BOTTOM BARS
8 - 16mm Ø TOP OF FOOTING IS
F1 1200 1200 300 REBARS PLACED 1.20m BELOW THE
AT SUPPORT
O.C. BOTHWAYS NATURAL GROUND LINE AT MID SPAN
250 250
6 - 16mm Ø TOP OF FOOTING IS 3-16 MM TOP BARS 3-16 MM TOP BARS
F2 1000 1000 300 REBARS PLACED 1.00m BELOW THE
10MM DIA. STIRRUPS
O.C. BOTHWAYS NATURAL GROUND LINE 2-16 MM EXTRA BARS 2@50MM,3@75MM,4@100MM REST
B-2

300

300
@200MM O.C.
10MM DIA. STIRRUPS

SCHEDULE OF FOOTINGS RB2 3@50MM,3@75MM,4@100MM REST


@200MM O.C. 2-16 MM EXTRA BARS

N T S 2-16 MM BOTTOM BARS 2-16 MM BOTTOM BARS

AT SUPPORT AT MID SPAN


SCHEDULE OF COLUMNS 250 250
SCALE 1:20 M. 3-16 MM TOP BARS 3-16 MM TOP BARS
10MM DIA. STIRRUPS
2-16 MM EXTRA BARS 3@50MM,3@75MM,4@100MM REST
B3
C1 C2 C3
@200MM O.C.

400

400
10MM DIA. STIRRUPS
3@50MM,3@75MM,4@100MM REST 2-16 MM EXTRA BARS
@200MM O.C.

3-16 MM BOTTOM BARS 3-16 MM BOTTOM BARS


GROUND FLOOR
FOUNDATION TO

AT SUPPORT AT MID SPAN


200 200

VERTICAL BARS: 8-16 MM DIA. VERTICAL BARS: 6-16 MM DIA. VERTICAL BARS: 6-16 MM DIA.
COLUMN TIES: 10 MM DIA. 3@ 50MM, 3@75MM, 4@100MM,REST @ 200 MM O.C. COLUMN TIES: 10 MM DIA. 3@ 50MM, 3@75MM, 4@100MM,REST @ 200 MM O.C. COLUMN TIES: 10 MM DIA. 3@ 50MM, 3@75MM, 4@100MM,REST @ 200 MM O.C.

300

300
COLUMN SIZE: 250MM X 350MM COLUMN SIZE: 250MM X 300MM COLUMN SIZE: 250MM X 300MM
RB-1
GROUND FLOOR TO
SECOND FLOOR

AT SUPPORT AT MID SPAN


200 200
VERTICAL BARS: 6-16 MM DIA. VERTICAL BARS: 6-16 MM DIA. VERTICAL BARS: 6-16 MM DIA.
COLUMN TIES: 10 MM DIA. 3@ 50MM, 3@75MM, 4@100MM,REST @ 200 MM O.C. COLUMN TIES: 10 MM DIA. 3@ 50MM, 3@75MM, 4@100MM,REST @ 200 MM O.C. COLUMN TIES: 10 MM DIA. 3@ 50MM, 3@75MM, 4@100MM,REST @ 200 MM O.C.
COLUMN SIZE: 250MMX 350MM COLUMN SIZE: 250 X 300 COLUMN SIZE: 250 X 300

300

300
RB-1
SECOND FLOOR TO
ROOF BEAM

VERTICAL BARS: 6-16 MM DIA. VERTICAL BARS: 6-16 MM DIA.


COLUMN TIES: 10 MM DIA. 3@ 50MM, 3@75MM, 4@100MM,REST @ 200 MM O.C. COLUMN TIES: 10 MM DIA. 3@ 50MM, 3@75MM, 4@100MM,REST @ 200 MM O.C.
COLUMN SIZE: 250MMX 350MM COLUMN SIZE: 250 X 300

You might also like