Surface BOP Kill Sheet (S.I.
Units) Date 2 (E) KICK DATA
Deviated Well Name SHUT IN DRILL PIPE PRESSURE SHUT IN CAS
SIDPP (E1) = kPa SICP (E2) =
(A) FORMATION STRENGTH DATA (B) CURRENT WELL DATA
SURFACE LEAK-OFF PRESSURE FROM
(A1) kPa
(F) KILL FLUID DENSITY
FORMATION STRENGTH TEST CURRENT DRILLING FLUID SIDPP SICPP
3 SIDPP
DENSITY (B1) kg/m KFD = Curent Drilling Fluid Density + =
DRILLING FLUID DENSITY AT TEST (A2) kg/m 3 Hole T.V. Depth x g
INITIAL MAX. ALLOWLABE DRILLING DENSITY = = (B1) 0
Surface Leak-Off Pressure
= Fluid Density at Test + =
Shoe T.V. Depth x g
DEVIATION DATA
(G) INITIAL CIRCULATING PRESSURE
(A1) 0
= (A2) 0+ = (A3) = #DIV/0! kg/m 3 KOP M.D. (B2) m ICP = DPL+ SIDPP = (C3)
(B8) 0 x 0.00981 KOP
KOP T.V. (B3) m
(H) FINAL CIRCULATING PRESSURE
INITIAL MAX. ALLOWLABE ANNULAR SURFACE PRESSURE =
EOB M.D. (B4) m EOB (F1)
KFD
= (Initial Max. Allowlable Drilling Density - Curent Density) x Shoe T.V. x g = FCP = x DPL =
EOB T.V. (B5) m Curent Drilling Fluid Density (B1)
=( (A3) #DIV/0! - (B1) 0 )x (B8) 0 x 0.00981 =
CASING SHOE DATA
= (A4) = #DIV/0! kPa (I) DYNAMIC PRESSURE LOSS at KOP
DIAMETER (B6) mm
KOPMD
DPL at KOP = DPL + (FCP-DPL) x =
(C) PUMPS DATA M. DEPTH (B7) m Hole MD
PUMP NO.1 DISPLACEMENT PUMP NO.2 DISPLACEMENT
T.V. DEPTH (B8) m = (C3) 0+ ( (H1) #DIV/0! - (C3)
3
m /stroke m3 /stroke
DYNAMIC PRESSURE LOSS (DPL)
SLOW PUMP RATE DATA
PUMP NO. 1 PUMP NO. 2 (J) REMAINING SIDPP at KOP
HOLE DATA
SPM kPa kPa
DIAMETER (B9) mm SIDPP at KOP = SIDPP - (KMD-Curent Drilling Fluid Density ) x KOPTVD
SPM kPa kPa
M. DEPTH (B10) m = (E1) 0 -( (F1) #DIV/0! - (B1) 0
PUMP DYNAMIC PRESSURE
DISPLACEMENT SLOW PUMP RATE
SELECT LOSS
T.V. DEPTH (B11) m (K) CIRCULATING PRESSURE at KOP
- 3 SPM kPa
m /stroke
1 (C1) (C2) (C3) CP at KOP = DPL at KOP + SIDPP at KOP = (I1)
(D) PRE-RECORDER VOLUME DATA (L) DYNAMIC PRESSURE LOSS at EOB
EOBMD
PUMP STROKES = TIME = DPL at EOB = DPL + (FCP-DPL) x =
Hole MD
LENGTH CAPACITY VOLUME Volume Pump Strokes
= =
Pump Displ. (C1) Pump Rate (C2) = (C3) 0+ ( (H1) #DIV/0! - (C3)
m 3 3 strokes minutes
m /m m
DP from SURFACE to KOP (B2)= x = (D3) 0.00 (D17) #DIV/0! #DIV/0!
(M) REMAINING SIDPP at EOB
DRILL PIPE from KOP to EOB (B4) - (B2)= x = (D4) 0.00 (D18) #DIV/0! #DIV/0!
SIDPP at EOB = SIDPP - (KMD-Curent Drilling Fluid Density ) x EOBTVD
DRILL PIPE from EOB to BHA (B10) - (B4) - (D1) - (D2)= x = (D5) 0.00 (D19) #DIV/0! #DIV/0!
= (E1) 0 -( (F1) #DIV/0! - (B1) 0
HEVI WALL DRILL PIPE (D1) x = (D6) 0.00 (D20) #DIV/0! #DIV/0!
DRILL COLLAR (D2) x = (D7) 0.00 (D21) #DIV/0! #DIV/0! (N) CIRCULATING PRESSURE at EOB
DRILL STRING VOLUME (D3)+(D4)+(D5)+(D6)+(D7) = (D8) 0.00 (D22) #DIV/0! #DIV/0! CP at EOB = DPL at EOB + SIDPP at EOB = (L1)
DP from surface to KOP Doh= x = (D9) 0.00 (D23) #DIV/0! #DIV/0!
(O) GRAPHIC DATA
DRILL PIPE/HWDP in OPEN HOLE (B10) - (B7) - (D2)= x = (D10) 0.00 (D24) #DIV/0! #DIV/0!
OPEN HOLE VOLUME (D9)+(D10) = (D11) 0.00 (D25) #DIV/0! #DIV/0! ICP - CP at KOP ( (G1) 0
Slant 1 = =
Volume DP from Surface to KOP (D17)
BHA in open Hole (B7)= x 0.0097 = (D12) 0.00 (D26) #DIV/0! #DIV/0!
TOTAL ANNULUS VOLUME (D11)+(D12) = (D13) 0.00 (D27) #DIV/0! #DIV/0! CP at KOP - CP at EOB ( (K1) #DIV/0!
Slant 2 = =
TOTAL WELL SYSTEM VOLUME (D8)+(D13) = (D14) 0.00 (D28) #DIV/0! #DIV/0! Volume DP from KOP to EOB (D18)
ACTIVE SURFACE VOLUME (D15) (D29) #DIV/0! #DIV/0!
CP at EOB - FCP ( (N1) #DIV/0!
TOTAL ACTIVE FLUID SYSTEM (D14)+(D15) = (D16) (D30) #DIV/0! #DIV/0! Slant 3 = =
Volume DP from EOB to BH (D19) #DIV/0! + (D20)
HUT IN CASING PRESSURE PIT GAIN
(E2) = kPa (E3) = m3
(E1) 0
0+ = (F1) #DIV/0! kg/m 3
(B11) 0 x 0.00981
(C3) 0+ (E1) 0 = (G1) 0 kPa
#DIV/0!
x (C3) 0 = (H1) #DIV/0! kPa
0
(B2) 0
0 )x = (I1) #DIV/0! kPa
(B10) 0
KOPTVD x g =
0 )x (B3) 0 x 0.00981 = (J1) #DIV/0! kPa
(I1) #DIV/0! + (J1) #DIV/0! = (K1) #DIV/0! kPa
(B4) 0
0 )x = (L1) #DIV/0! kPa
(B10) 0
EOBTVD x g =
0 )x (B5) 0 x 0.00981 = (M1) #DIV/0! kPa
(L1) #DIV/0! + (M1) #DIV/0! = (N1) #DIV/0! kPa
0 - (K1) #DIV/0! ) x 100
= (O1) #DIV/0! kPa
(D17) #DIV/0! 100 stk
DIV/0! - (N1) #DIV/0! ) x 100
= (O2) #DIV/0! kPa
(D18) #DIV/0! 100 stk
- (H1) #DIV/0! ) x 100
= (O3) #DIV/0! kPa
(D20) #DIV/0! + (D21) #DIV/0! 100 stk