Full Voltage Conversion From 120V To 220V at House Type 3Tr3S (Internal Works)

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views105 pages

Full Voltage Conversion From 120V To 220V at House Type 3Tr3S (Internal Works)

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO.

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AG-0012
ENGG CERT
DESCRIPTION
JO/EWO

SCOPE OF WORK
NO. DATE
REV

DISCIPLINE
ENGINEER
BOS
FULL VOLTAGE CONVERSION FROM
120V TO 220V AT HOUSE TYPE 3TR3S
DATE: 8-23-17
PROJECT
ENGINEER

(INTERNAL WORKS)
AFB
DATE:
8-24-17
CERTIFIED
00-00-16
HAK
DATE:
8-24-17
CONSTRUCTION
AGENCY
SIM
9-20-17
DATE:
OPERATIONS

ASB
DATE:
9-25-17
RAS TANURA
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:

UTILITIES AND TECHNICAL SUPPORT DEPARTMENT


REVISIONCERTIFICATION

TECHNICAL SUPPORT DIVISION


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

MAINTENANCE ENGINEERING SUPPORT UNIT


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

ENGINEERING SUPPORT GROUP


TELEPHONE NO. 876-3271/876-7519
(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 1
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
ENGG CERT
DESCRIPTION
JO/EWO

This Project shall be carried out in accordance with the Contract Terms
and Conditions, Scope of Work, Drawings, Standards, Specifications
DATE

and any other documents referred to therein:


NO.
REV

DISCIPLINE
ENGINEER
BOS PART I - SOLICITATION PROVISIONS
DATE: 8-23-17
PROJECT
ENGINEER PART II - GENERAL REQUIREMENTS
AFB
DATE:
8-24-17 PART III - DETAILED WORK DESCRIPTIONS
CERTIFIED
00-00-16
HAK
PART IV - CONSTRUCTION SPECIFICATION
DATE:
8-24-17
CONSTRUCTION
AGENCY PART V - DRAWING COMPLETION CERTIFICATE
SIM
9-20-17
DATE:
OPERATIONS

ASB
DATE:
9-25-17
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 2
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
00

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER

SIM

ASB
APPROVAL/CERTIFICATION REQUIREMENTS,

AFB

HAK
BOS

AGENCY
BY:

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

8-24-17
CERTIFIED

9-20-17
8-24-17
8-23-17

9-25-17
OPERATIONS
00-00-16

CONSTRUCTION
(DCC) NO. _____________________ 17U092-092 DATE:

RAS TANURA
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017
100%
RESIDENTIAL AREA
SCOPE OF WORK
3.0
2.0
1.0

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S


DOC

SAUDI ARABIA
MATERIALS

S65
TABLE OF CONTENTS

BID SUBMISSSION

A
DWG.TYPE PLANT NO. INDEX

JO/EWO: 17U092
SAUDI ARABIAN OIL COMPANY

SPECIFIC INSTRUCTIONS
PART- I: SOLICITATION PROVISIONS

RE-778890
DRAWING NO.

3
of
105
SHT.NO.

00
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

1.0 BID SUBMISSION


ENGG CERT

1.1 CONTRACTOR shall submit a Lump Sum Bid to supply all labor, permanent,
temporary and expendable materials and equipment including spare parts
required for the completion of the WORK as shown on the Bid Drawings and/or
described in the Scope of Work.

1.2 Prior to submission of Bid, CONTRACTOR should obtain clarification of all


questions which may have arisen as to intent of the Scope of Work, or any
conflict between the Drawings and the Scope of Work or with the actual site
DESCRIPTION

conditions, including possible obstructions during construction or anything that


would prevent or hinders progress of the WORK as described in Section 1.0
above.

1.3 CONTRACTOR acknowledge that (1) it has fully understood all requirements to
satisfactorily complete the WORK, (2) it had the opportunity to request
clarification prior to submitting the Bid as described in Paragraph 1.2 above, and
(3) that the Bid include all the cost of completing the project and all incidental
JO/EWO

costs or cost of unforeseen works.


DATE

1.4 Any failure of the CONTRACTOR to take the actions required and acknowledged
in this Solicitation Provision will not relieve the CONTRACTOR from
NO.
REV

responsibility for estimating properly the difficulty and cost of successfully


DISCIPLINE
ENGINEER performing the WORK or for proceeding to successfully perform the WORK
BOS
without additional cost to SAUDI ARAMCO.
DATE: 8-23-17
PROJECT
ENGINEER
2.0 MATERIALS
AFB
DATE:
8-24-17
CERTIFIED 2.1 CONTRACTOR shall supply all permanent, temporary and expendable
00-00-16
HAK materials, equipment and articles including spare parts necessary to complete
DATE:
8-24-17 the WORK unless specifically described in this Scope of Work, and shall be
CONSTRUCTION
AGENCY supplied from a source approved by SAUDI ARAMCO and meet all relevant
SIM
SAUDI ARAMCO Standards and Specifications.
9-20-17
DATE:
OPERATIONS
2.2 All materials, equipment, and articles incorporated into the WORK shall be new
ASB
9-25-17 and of the most suitable grade for the purpose intended, unless specifically
DATE:
provided in this Scope of Work. Reference specifications described in ”PART IV
CONTROL NUMBER
VERIFICATION

– CONSTRUCTION SPECIFICATIONS” of the Scope of Work shall not be


EDSD

construed as limiting competition. CONTRACTOR may, apply for the approval of


DATE:

the SAUDI ARAMCO Project Engineer to use alternative


BY:

material/equipment/article, to the ones specified and approved for the project. An


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

approval from the SAUDI ARAMCO Project Engineer to any deviation from
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

and/or alterations to the project specifications is required in all instances.


(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 4
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

2.3 CONTRACTOR shall obtain SAUDI ARAMCO Project Engineer approval of


ENGG CERT

materials, equipment and articles to be incorporated in the WORK. When


requesting approval, CONTRACTOR shall furnish samples of proposed
materials, equipment and article to be used at the CONTRACTOR’s expense;
complete with full information concerning the material, equipment and articles.
Any material, equipment and articles that do not have the required approval
when installed or used will be at risk of subsequent rejection.

2.4 Materials will be taken to site only as required and will not be stockpiled at the
DESCRIPTION

site.

2.5 CONTRACTOR shall plan availability of all materials in advance. CONTRACTOR


shall be responsible for any delays caused due to lack of availability of
CONTRACTOR supplied materials.

3.0 SPECIFIC INSTRUCTIONS

3.1 Drawings and Scope of Work for Construction


JO/EWO

3.1.1 This Specific Instructions must be read in conjunction with the drawings as
listed in Drawing Control Sheet No. RD-778891, Sheet No. 1 of 1, Rev.
DATE

No. 00” of Part III: Detailed Work Descriptions.

3.1.2 It is the intent of the Scope of Work to generally describe the major
NO.
REV

DISCIPLINE components of the WORK. It shall not be construed to be an itemized


ENGINEER
BOS listing of each element of the WORK or procedure for the construction of
DATE: 8-23-17 the entire project. CONTRACTOR shall include all works necessary for
PROJECT
ENGINEER the proper completion of the project ready for efficient operation.
AFB
8-24-17
DATE: 3.1.3 The documents forming the Contract are to be taken as mutually
CERTIFIED
00-00-16
HAK explanatory of one another and shall be read as a whole. Anything
DATE:
8-24-17 mentioned in the Scope of Work and not shown in the Drawings, or shown
CONSTRUCTION
AGENCY
in the Drawings and not mentioned in the Scope of Work, shall be of like
SIM effect as if shown or mentioned in both. CONTRACTOR shall promptly
9-20-17
DATE: refer any conflict, discrepancy or inconsistency of information between the
OPERATIONS
documents to the SAUDI ARAMCO Project Engineer, who shall promptly
ASB
9-25-17
make a determination in writing within the bid clarification period. Following
DATE:
award, any adjustment by CONTRACTOR without such determination
CONTROL NUMBER
VERIFICATION

shall be at its own risk and expense.


EDSD

3.2 Site Investigation, Field Dimensions and Conditions Affecting the WORK
DATE:
BY:
REVISIONCERTIFICATION

3.2.1 CONTRACTOR acknowledges that it has taken the necessary steps to


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

ascertain the nature and location of the WORK and it has thoroughly
(DCC) NO. _____________________

inspected and investigated the work site and satisfied itself regarding all
17U092-092

general and local conditions and its surrounding areas, which can affect
SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 5
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
the Bid and subsequent WORK.
ENGG CERT

3.2.2 CONTRACTOR acknowledges that it has satisfied itself as to the


character, quality and quantity of surface and subsurface materials or
obstacle to be encountered insofar as this information is reasonably
ascertainable from an inspection of the site, including all information
provided by the SAUDI ARAMCO Project Engineer, as well as from the
drawings and Scope of Work. CONTRACTOR shall include in the bid the
cost of removal of all existing miscellaneous items or articles which
obviously interfere with the WORK, though not specifically shown in the
DESCRIPTION

Drawings and/or mentioned in this Scope of Work.

3.2.3 Field dimensions shall prevail over those in the drawings. CONTRACTOR
shall check and verify all measurements and dimensions at the
construction area for their accuracy prior to submission of bid and shall
immediately report any discrepancies to Saudi ARAMCO Project Engineer
for resolution within the bid clarification period. Following award, no extra
charge or compensation will be allowed on account of differences in actual
JO/EWO

dimensions and measurements as against those shown on the project


drawings.
DATE

3.3 Protection of Existing Facility and Vegetation


NO.
REV

3.3.1 CONTRACTOR shall preserve and protect all structures, equipment and
DISCIPLINE
ENGINEER vegetation (plants, trees, shrubs and grass) on and adjacent to the work
BOS
sites, which are not to be removed and which do not unreasonably
DATE: 8-23-17
PROJECT interfere with the WORK. Any item that is damaged or marred as a direct
ENGINEER
AFB or indirect result of the WORK shall be restored to its original state by the
DATE:
8-24-17 CONTRACTOR at no expense to SAUDI ARAMCO.
CERTIFIED
00-00-16
HAK
8-24-17 3.4 Workmanship
DATE:
CONSTRUCTION
AGENCY
SIM 3.4.1 All WORK shall be performed in skillful, workmanlike and safely manner in
DATE:
9-20-17 accordance with SAUDI ARAMCO Construction Safety Manual, the
OPERATIONS relevant General Instructions and SAUDI ARAMCO Codes and Standards.
ASB
9-25-17
DATE: 3.4.2 CONTRACTOR is held responsible to complete the project in accordance
CONTROL NUMBER
VERIFICATION

with the details and requirements of the Scope of Work as shown in the
EDSD

Drawings and all applicable SAUDI ARAMCO Codes and Standards.


DATE:
BY:

3.4.3 No WORK shall be considered complete unless inspected, approved and


REVISIONCERTIFICATION

certified by the SAUDI ARAMCO Project Engineer to be in conformance


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

with the drawing(s), Scope of Work and all SAUDI ARAMCO Codes,
(DCC) NO. _____________________

Standards and Specifications.


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 6
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
3.5 Housekeeping
ENGG CERT

3.5.1 Keep the area of WORK and surrounding premises free from accumulation
of waste materials or rubbish caused by the WORK at all times. Each day,
CONTRACTOR shall remove from the Work Site all waste materials, and
leave the Work Site in a neat and broom-clean condition. Upon completion
of WORK, CONTRACTOR shall remove from the Work Site waste
materials, rubbish, tools, construction equipment, machinery and surplus
material, and thoroughly clean the Work Site, leaving it in a neat and
broom-clean condition.
DESCRIPTION

- END OF PART I: SOLICITATION PROVISIONS -


NO. JO/EWO
DATE
REV

DISCIPLINE
ENGINEER
BOS
DATE: 8-23-17
PROJECT
ENGINEER
AFB
DATE:
8-24-17
CERTIFIED
00-00-16
HAK
DATE:
8-24-17
CONSTRUCTION
AGENCY
SIM
9-20-17
DATE:
OPERATIONS

ASB
DATE:
9-25-17
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 7
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
00

DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER

SIM

ASB
APPROVAL/CERTIFICATION REQUIREMENTS,

AFB

HAK
BOS

AGENCY
BY:

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

8-24-17
CERTIFIED

9-20-17
8-24-17
DATE: 8-23-17

9-25-17
OPERATIONS
00-00-16

CONSTRUCTION
(DCC) NO. _____________________ 17U092-092 DATE:

RAS TANURA
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017
100%
RESIDENTIAL AREA
SCOPE OF WORK
2.0
1.0

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S


DOC

SAUDI ARABIA
WORK SCHEDULE
TABLE OF CONTENTS

S65
SAFETY REQUIREMENTS

A
DWG.TYPE PLANT NO. INDEX

JO/EWO: 17U092
PART – II: GENERAL REQUIREMENTS
SAUDI ARABIAN OIL COMPANY

RE-778890
DRAWING NO.

8
of
105
SHT.NO.

00
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

1.0 WORK SCHEDULE


ENGG CERT

1.1 The area of WORK is within the residential areas; thus, WORK will be done with
minimal disturbance to residents, which will be agreed by the Saudi ARAMCO
Project Engineer and CONTRACTOR during the project kick-off meeting.

1.1.1 Saudi ARAMCO Project Engineer shall coordinate with the Proponent to
establish sequence of the WORK, schedule of work and/or working
time.

1.1.2 CONTRACTOR shall meet with the Saudi ARAMCO Project Engineer to
DESCRIPTION

establish an overall schedule for construction and to facilitate the


required arrangements with least amount of disturbance to the
residents.

2.0 SAFETY REQUIREMENTS

2.1 Introduction

2.1.1 This Safety Requirements is provided as guidance to the


JO/EWO

CONTRACTOR to maintain safe working conditions for its personnel


and SAUDI ARAMCO.
DATE

2.1.2 CONTRACTOR is solely responsible for the development and


implementation of its own safety program. The applicability of this
NO.
REV

Safety Requirements is on a needed or as required basis pursuant to


DISCIPLINE specific project requirement.
ENGINEER
BOS
DATE: 8-23-17 2.1.3 This Safety Requirements is not provided to address all possible safety
PROJECT
ENGINEER
issue. No specific requirements specified herein are intended to limit,
AFB replace or supersede applicable provisions of the SAUDI ARAMCO
DATE:
8-24-17 Construction Safety Manual (CSM) and other SAUDI ARAMCO Safety
CERTIFIED Standards.
00-00-16
HAK
DATE:
8-24-17 2.1.4 The CONTRACTOR and all CONTRACTOR employees, agents and
CONSTRUCTION subcontractors shall comply at all times with all applicable safety, health
AGENCY
SIM and environmental regulations and all SAUDI ARAMCO General
DATE:
9-20-17 Instruction (G.I.s), and other related rules and regulations. Specifically,
OPERATIONS CONTRACTOR shall comply with the provision of the SAUDI ARAMCO
ASB Construction Safety Manual (CSM), Saudi ARAMCO Safety Handbook,
9-25-17 all other such related requirements and any other successor manual
DATE:
that replace these.
CONTROL NUMBER
VERIFICATION
EDSD

In case of conflicting requirements, the most stringent requirement shall


apply.
DATE:
BY:

CONTRACTOR shall also take or cause to be taken any additional


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

measures under the direction of the Company Representative to


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

prevent the injury or death of any person, or damage to the environment


(DCC) NO. _____________________

during CONTRACTOR’s performance of the WORK. Supervisory


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 9
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
personnel or other qualified staff shall be present at the WORK Site
while any WORK is in progress.
ENGG CERT

SAUDI ARAMCO reserves the right to monitor and inspect any WORK
site, laydown yard, fabrication yard, clinic, camp and dining facility (On
or Off SAUDI ARAMCO property) for compliance with the above
references Safety, Health and Environmental Requirements. SAUDI
ARAMCO reserves the right to reject, remove from site, or have
CONTRACTOR destroy any tools or equipment found to be defective or
of substandard quality. “Homemade”, including “shop-made”, tools are
strictly prohibited.
DESCRIPTION

CONTRACTOR shall be responsible to identify and address all potential


safety, health and environmental issues in accordance with SAUDI
ARAMCO Safety Management Guide for Contractor Pre-job Safety
Explanation Meetings Checklist (Loss Prevention Guide 07-003-2012).

2.2 SAUDI ARAMCO Responsibility

2.2.1 SAUDI ARAMCO Project Engineer in coordination with the Proponent


Organization shall communicate general and site- safety standards and
JO/EWO

information to the CONTRACTOR, either during Job Explanation (Job


X) meetings with potential bidders or at Kick-off meeting with the
CONTRACTOR before beginning on-site work activities.
DATE

2.2.2 Immediately following the above meeting, SAUDI ARAMCO Project


NO.
REV

Engineer shall conduct joint hazard identification tour with the


DISCIPLINE
ENGINEER
CONTRACTOR with the participation of SAUDI ARAMCO Proponent
BOS Organization (SAPO), Loss Prevention Department (LPD),
DATE: 8-23-17 Environmental Protection Department and other SAUDI ARAMCO
PROJECT
ENGINEER
agencies as required.
AFB
DATE:
8-24-17 2.2.3 SAUDI ARAMCO Project Engineer and the SAPO shall ensure that all
CERTIFIED safety requirements are strictly enforced.
00-00-16
HAK
DATE:
8-24-17 2.2.4 A full audit shall be undertaken by DHALPD and Environmental Health
CONSTRUCTION
AGENCY
to establish hazardous materials present in the facility prior to
SIM commencement of any work.
9-20-17
DATE:
OPERATIONS 2.2.5 SAUDI ARAMCO Project Engineer and SAUDI ARAMCO Safety
ASB Coordinator(s) are responsible for informing CONTRACTOR of Safety
DATE:
9-25-17 Infractions and requirements for remedial actions and disciplinary
actions.
CONTROL NUMBER
VERIFICATION
EDSD

2.3 CONTRACTOR Responsibility


DATE:

2.3.1 CONTRACTOR has overall responsibility for a full time safety in and out
BY:

of the Work Site in accordance to the applicable requirements of the


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

SAUDI ARAMCO CSM, Volume 1 - Contractor Safety Administrative


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

Requirements (CSAR) and Volume 2 - Work Site Safety Manual


(DCC) NO. _____________________

(WSSM).
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 10
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

2.3.2 Site Safety Staff


ENGG CERT

CONTRACTOR shall provide full time and qualified site safety staff in
accordance to the requirements of Volume I Paragraph 4.5 of the
SAUDI ARAMCO CSM or as otherwise required by the SAUDI
ARAMCO Project Engineer during Job Explanation Meeting.

2.3.3 Safety Meeting

A. CONTRACTOR shall conduct daily pre job (toolbox) craft safety


meetings with their personnel to address job-specific safety
DESCRIPTION

issues prior to beginning a different work activity, which shall also


include a review of the applicable section of the approved HIP.

B. CONTRACTOR shall conduct weekly safety meetings in the


native language(s) of the personnel. The safety meeting shall be
no shorter than 15 minutes and shall cover, but not limited to,
work hazards and related job procedures as well as a
review/update of the HIP.
JO/EWO

C. Safety meeting shall be documented with records maintained and


shall be made available for review by the SAUDI ARAMCO
project Engineer upon request.
DATE

2.3.4 Personal Protective Equipment (PPE)


NO.
REV

DISCIPLINE
ENGINEER
A. CONTRACTOR shall provide all required Safety Harness and
BOS proper PPE that meets SAUDI ARAMCO specification to its
DATE: 8-23-17 employees in accordance with Volume I Paragraph 4.8 and
PROJECT
ENGINEER Volume II Paragraph 3.0 of the SAUDI ARAMCO CSM.
AFB
DATE:
8-24-17 2.3.5 Work Permit
CERTIFIED
00-00-16
HAK
A. CONTRACTOR shall obtain and complete all required Work
8-24-17
DATE: Permits in accordance with Volume I Paragraph 4.12 and Volume
CONSTRUCTION
AGENCY II, Part I Paragraph 4. of the SAUDI ARAMCO CSM as per the
SIM minimum guidelines and responsibilities set forth in SAUDI
DATE:
9-20-17
ARAMCO General Instruction manual, GI 2.100 “Work Permit
OPERATIONS System”.
ASB
DATE:
9-25-17 B. CONTRACTOR Work Permit Receiver shall have a valid SAUDI
CONTROL NUMBER

ARAMCO Receiver Certificate issued by Loss Prevention


VERIFICATION

indicating and duly signed by the SAPO division


EDSD

head/superintendent. Receiver(s) with signed certificate from


other organization/facility shall not be used at different
DATE:
BY:

organization unless the responsible SAPO superintendent signs


REVISIONCERTIFICATION

a reissued certificate that reflects the new organization.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

2.3.6 Jobsite Safety Logbook (JSL)


(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 11
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
A. CONTRACTOR shall provide hardbound JSL at site for safety
comments from SAUDI ARAMCO Project Engineer, Saudi
ARAMCO Safety Coordinators, LPD Safety Representatives and
ENGG CERT

Proponent Organization Representatives.

B. CONTRACTOR shall immediately take necessary corrective actions


to mitigate observed safety hazards, including those documented in
the JSL.

C. CONTRACTOR responses shall be entered within 48 hours on the


right-hand page opposite the SAUDI ARAMCO entry.
CONTRACTOR responses shall clearly state action items,
DESCRIPTION

responsible parties, and estimated time for completion (ETC) in


order to close the entry.

D. The SAPO reserves the right to notify CONTRACTOR of failure to


properly close JSL entries and to take necessary actions to
eliminate the subsequent deficiency.

E. Failure to correct deficiencies noted in the JSL may result in that


part of the job site work activities being suspended at the
JO/EWO

CONTRACTOR’s expense until the noted safety deficiencies have


been corrected.
DATE

F. Copy of minutes of safety meeting and toolbox meetings should be


attached to the JSL for inspection.
NO.
REV

DISCIPLINE 2.3.7 Work During Hot Weather (Heat Stress)


ENGINEER
BOS
DATE: 8-23-17
A. CONTRACTOR management is responsible for managing their
PROJECT employees work so as to avoid and prevent heat-related
ENGINEER
AFB
illnesses.
DATE:
8-24-17
CERTIFIED B. Heat Stress management shall be the responsibility of the
00-00-16
HAK CONTRACTOR thus CONTRACTOR shall conduct a thorough
DATE:
8-24-17 heat stress evaluation to identify task and conditions that present
CONSTRUCTION
AGENCY
a potential heat stress hazard, and subsequently develop and
SIM implement a heat stress management program in accordance
DATE:
9-20-17 with Volume I Paragraph 4.17 of the SAUDI ARAMCO CSM.
OPERATIONS

ASB 2.3.8 Hazard Identification Plan (HIP)


DATE:
9-25-17
A. Before start of any Work Site activities, CONTRACTOR shall
CONTROL NUMBER
VERIFICATION

submit Job Specific Hazard Identification Plan (HIP) to SAUDI


EDSD

ARAMCO Project Engineer for review and subsequent approval


by appropriate SAUDI ARAMCO Agencies. The HIP shall be
DATE:
BY:

developed and approved in accordance with Volume I Paragraph


6.0 of the SAUDI ARAMCO CSM and shall address all
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

requirements as per joint hazard identification tour described in


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

Paragraph 2.2.2 above.


(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 12
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
B. CONTRACTOR shall implement and adhere to the specific HIP.

C. CONTRACTOR shall change or amend the HIP accordingly


ENGG CERT

when conditions change, new hazards are introduced and/or the


scope of work changes.

2.3.9 Medical

A. CONTRACTOR shall provide medical care for its personnel in


accordance to the requirements of Volume I Paragraph 9.0 of the
SAUDI ARAMCO CSM and the SAUDI ARAMCO Minimum
Medical Standards Requirements (MMSR) Manual.
DESCRIPTION

B. CONTRACTOR shall provide First Aid at the Work Site which is


the immediate help provided to injured or seriously ill personnel
prior to arrival of professional medical assistance.

 CONTRACTOR shall provide and maintain adequate First


Aid supplies for its personnel per SAUDI ARAMCO General
Instructions Manual, GI 150.002 “Heart Saver First Aid with
CPR and AED Training”.
JO/EWO

o CONTRACTOR shall provide at least one 10–unit First


Aid kit/cabinet and one 36-unit First Aid kit/cabinet if
DATE

fewer than 50 people are at Work Site and 50 people or


more are at the Work Site respectively of required
NO.
REV

content per MMRS Manual, Attachments 23 and 24.


DISCIPLINE
ENGINEER
BOS o CONTRACTOR shall assign First Aid attendant(s) to be
DATE: 8-23-17 responsible for each First Aid kit/cabinet and to ensure
PROJECT
ENGINEER there is sufficient stock of all supplies at all times.
AFB
DATE:
8-24-17 o CONTRACTOR shall post signs/notices near each First
CERTIFIED
00-00-16 Aid kit/cabinet stating the following:-
HAK
8-24-17
DATE: a. Name of person in charge of the First Aid
CONSTRUCTION
AGENCY kit/cabinet.
SIM
9-20-17
DATE: b. Hospital where injured/ill personnel are to be
OPERATIONS
transported.
ASB
DATE:
9-25-17 c. Telephone number(s) of doctor(s) or first aid
CONTROL NUMBER

attendant(s).
VERIFICATION
EDSD

d. Emergency telephone numbers.


DATE:
BY:

 CONTRACTOR shall provide adequate number of personnel


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

at the Work Site who are trained and certified in First Aid and
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

BLS, including those in charge of First Aid supplies.


(DCC) NO. _____________________

2.3.10 Safety Barriers and Project Signs


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 13
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

A. Before proceeding with the WORK, CONTRACTOR shall erect


temporary barricades and warning tapes for protection and the
ENGG CERT

safety of the general public throughout construction period, as


required. Remove same upon completion of the project or as
directed by the Saudi ARAMCO Project Engineer.

 As and when required by the Work Site conditions,


CONTRACTOR shall erect temporary fence (obscured)
with lockable pedestrian and vehicle gates around the
construction site.
DESCRIPTION

 Barricades shall be clearly marked with flagging.


Barricades shall have protective lighting, when necessary.

B. CONTRACTOR shall prepare and post a sign, in Arabic and


English at the Work Site, minimum of 1.2m (4’) X 2.4m (8’) (or as
agreed with the SAUDI ARAMCO Project Engineer), and at a
minimum the following information shall be shown:-

 SAPO name
JO/EWO

 Project title
DATE

 Budget Item (BI), work order


NO.
REV

CONTRACTOR name, address and telephone number


DISCIPLINE
ENGINEER
BOS  SAPO and CONTRACTOR Representative name and
DATE: 8-23-17 telephone numbers
PROJECT
ENGINEER
AFB 2.3.11 Fire Protection and Preventions
DATE:
8-24-17
CERTIFIED A. CONTRACTOR shall provide appropriate and adequate
00-00-16
HAK firefighting equipment (portable fire extinguisher(s), hoses or
DATE:
8-24-17 appropriate water storage).
CONSTRUCTION
AGENCY
SIM B. CONTRACTOR designated site personnel shall be trained in the
9-20-17 use of firefighting equipment to be used in the Work Site.
DATE:
OPERATIONS

ASB 2.3.12 Housekeeping


DATE:
9-25-17
A. CONTRACTOR shall dispose all construction debris or solid
CONTROL NUMBER
VERIFICATION

waste generated during this project in approved landfill in


EDSD

accordance to the requirements of SAUDI ARAMCO Engineering


DATE:

Standard, SAES-S-007. Collection, storage and disposal of all


BY:

nonhazardous and hazardous waste shall be in accordance with


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

SAUDI ARAMCO General Instructions, GI 430.001. All Class II


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

and Class III waste as per SAES-S- 007 are to be disposed of to


(DCC) NO. _____________________

the nearest approved SAUDI ARAMCO Landfill Area.


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 14
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
Required SAP EH&S Waste Manifest shall be prepared,
completed and approved prior to any hazardous waste disposal
ENGG CERT

at either an authorized Company or approved CONTRACTOR


disposal site (land disposal, land treatment or incinerators).

B. CONTRACTOR shall ensure that trash and debris are properly


collected and disposed of daily. Provide adequate amount of
trash receptacles in the Work Site.

C. Refuse trash and garbage shall only be disposed of at approved


site designated by SAUDI
DESCRIPTION

D. ARAMCO or Local Municipality

2.3.13 Asbestos

A. CONTRACTOR shall comply with all requirements of SAUDI


ARAMCO G.I. 150.001 - Asbestos Regulation, where work is
executed involving asbestos. The CONTRACTOR shall notify
SAUDI ARAMCO Industrial Hygiene (Workplace Environment
JO/EWO

Division) for review and comment on demolition and packing,


asbestos hazard plans and recommendations for personal
protective equipment and SAUDI ARAMCO Land and
DATE

Groundwater Protection Unit (Environmental Engineering


Division) for disposal recommendations, two weeks prior to any
NO.
REV

demolition involving asbestos containing structures.


DISCIPLINE
ENGINEER
BOS 2.3.14 Hazardous Materials
DATE: 8-23-17
PROJECT A. CONTRACTOR shall comply with all requirements of SAUDI
ENGINEER
ARAMCO G.I. 150.100 - Hazardous Materials Communication
AFB
8-24-17
Program, where work is executed involving Hazardous Materials.
DATE:
CERTIFIED
Additionally, safe use, handling, storage and disposal of such
00-00-16
HAK materials shall be in accordance with Volume 2, Part I, Chapter 10
DATE:
8-24-17 of the CSM.
CONSTRUCTION
AGENCY
SIM 2.3.15 Noise Control
9-20-17
DATE:
OPERATIONS
A. CONTRACTOR shall comply with all requirements of SAUDI
ARAMCO ENGINEERING STANDARD-A-105 (SAES-A-105) –
ASB
9-25-17
Noise Control.
DATE:
CONTROL NUMBER

2.3.16 Dust Control


VERIFICATION
EDSD

A. CONTRACTOR in coordination with SAUDI ARAMCO Project


DATE:

Engineer shall identify dust control requirements in the HIP.


BY:

Develop program for dust suppression or control for approval and


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

implementation on site to protect personnel and the general


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

public.
(DCC) NO. _____________________

-END OF PART II: GENERAL REQUIREMENTS-


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 15
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
ENGG CERT

PART – III: DETAILED WORK DESCRIPTIONS


DESCRIPTION

TABLE OF CONTENTS

1.0 PROJECT SUMMARY

2.0 ARCHITECTURAL

3.0 MECHANICAL – HVAC


JO/EWO

4.0 MECHANICAL – PLUMBING


DATE

5.0 FIRE ALARM


NO.
REV

6.0 ELECTRICAL
DISCIPLINE
ENGINEER
BOS 7.0 PROVISIONAL QUANTITIES
DATE: 8-23-17
PROJECT
ENGINEER 8.0 DRAWINGS
AFB
DATE:
8-24-17
CERTIFIED
00-00-16
HAK
DATE:
8-24-17
CONSTRUCTION
AGENCY
SIM
9-20-17
DATE:
OPERATIONS

ASB
DATE:
9-25-17
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 16
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

1.0 PROJECT SUMMARY


ENGG CERT

1.1 This Scope of Work describes the voltage conversion from existing 208/120 Volts
to 400/230 Volts and upgrading all electrical installations including kitchen
equipment and HVAC equipment suit new voltage at House Type 3TR3S, Ras
Tanura:

1.2 The WORK includes but not necessarily limited to the following:-

1.2.1 Replacement of existing panelboard from 150AT/225AF main breaker


and 208/120 Volts to 100AT/100AF main breaker and 400/230 Volts.
DESCRIPTION

1.2.2 Replacement of existing NEMA type power outlets with new BS-1363
Type, 13A, 250 Volts (RCD for wet areas).

1.2.3 Replacement of existing disconnect switches of Air Cooled Condensing


Unit (ACCU), Air Handling Unit (AHU) and duct heaters with new 3PH
and 400 Volts in new NEMA-2 and NEMA -4X enclosures for indoor and
outdoor installations respectively.
JO/EWO

1.2.4 Provision of new 250 Volts switches of new garbage disposer, water
heaters, washing machine and clothes drier, and range.
DATE

1.2.5 Servicing and cleaning of existing lighting luminaires inclusive of


replacement of incandescent bulbs with new 230 volts LED bulbs.
NO.
REV

DISCIPLINE
ENGINEER
1.2.6 Replacement of fluorescent tubes and starter of the two lighting fixtures
BOS at the kitchen with new T-8 LED tubes and new electronic energy
DATE: 8-23-17 miser/universal voltage ballast respectively.
PROJECT
ENGINEER
AFB 1.2.7 Megger testing of all existing power and lighting wires prior to re-use,
DATE:
8-24-17 inclusive of replacement of wires with damaged insulations.
CERTIFIED
00-00-16
HAK
1.2.8 Provision of neutral lines directly from the outlets and lighting luminaires
8-24-17
DATE: to the panel board and rectifying circuits with common neutral.
CONSTRUCTION
AGENCY
SIM 1.2.9 Replacement of branch circuits, including conduits and wires to suit new
9-20-17
DATE: service.
OPERATIONS

ASB 1.2.10 Replacement of existing garbage disposer, sweet water heater, range
DATE:
9-25-17 hood and exhaust fans.
CONTROL NUMBER
VERIFICATION

1.2.11 Replacement of ACCU and AHU inclusive of refrigerant lines and


EDSD

condensate drain lines.


DATE:
BY:

1.2.12 Complete replacement of existing smoke alarm including new 220 Volts
REVISIONCERTIFICATION

multi station photoelectric smoke alarm at hallways (1st and 2nd floor) and
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

bedrooms and new 120 Volts electrochemical carbon monoxide sensor


(Applicable to house with attached garage) with new step down
(DCC) NO. _____________________

transformer.
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 17
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

1.3 SAUDI ARAMCO will replace all single phase appliances rated 208/120 volts
with new appliances rated not less than 220 volts.
ENGG CERT

1.4 CONTRACTOR shall coordinate turnover or disposal of removed equipment


including ACCUs, AHUs, exhaust fans and sweet water heaters.

1.5 Project Engineer shall coordinate with proponent for the provision of tags and
asset numbers for all new equipment installed.

2.0 ARCHITECTURAL (Refer to drawings of other disciplines for affected areas).


DESCRIPTION

CONTRACTOR shall:

2.1 Cut portion of existing floors, interior wall and ceiling linings affected by the
WORK.

2.2 All conduit and pipe penetrations in fire walls shall be sealed with UL listed
ARAMCO approved fire stop materials and shall be equal or greater than the fire
rated wall.
JO/EWO

2.3 Make good floors exterior and interior walls, and ceiling directly or indirectly
affected by the WORK to match adjacent existing surfaces.
DATE

3.0 MECHANICAL – HVAC


NO.
REV

3.1 General
DISCIPLINE
ENGINEER
BOS CONTRACTOR shall
DATE: 8-23-17
PROJECT
ENGINEER 3.1.1 Verify existing site condition, dimension and coordinate with the
AFB “Authority Having Jurisdiction” prior to start of any works.
DATE:
8-24-17
CERTIFIED
00-00-16
3.2 Removal/Demolition Works (Refer to Drawing No. RA-778889, Sheet No. 001-
HAK
Revision No. 00)
DATE:
8-24-17
CONSTRUCTION
AGENCY CONTRACTOR shall
SIM
9-20-17
DATE: 3.2.1 Remove existing ACCU and AHU.
OPERATIONS

ASB 3.2.2 Remove filter dryer and sight glass.


DATE:
9-25-17
CONTROL NUMBER

3.2.3 Remove existing ceiling mounted exhaust fans.


VERIFICATION
EDSD

3.2.4 Remove existing range hood. .


DATE:
BY:

3.2.5 Remove existing condensate drain pipes.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

3.2.6 Remove existing refrigerant lines insulation.


(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 18
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
3.2.7 Cut and remove existing duct take-off connected to the existing AHU
and duct connected to the exhaust fans where required.
ENGG CERT

3.3 New Works - Equipment Installation (Refer to Drawing No. RA-778889, Sheet
No. 001 & 002-Revision 00).

CONTRACTOR shall:

3.3.1 Install new ACCU complete with new vibration pads.

3.3.2 Install new AHU complete with new vibration pads.


DESCRIPTION

3.3.3 Fabricate and install new duct take-off with flexible machine connection
between new AHU and existing main ducts.

3.3.4 Install new condensate drain pipe complete with P-Trap from the new
AHU to the existing drain pipe.

3.3.5 Install new exhaust fans inclusive of required duct and connect to
existing exhaust duct.
JO/EWO

3.3.6 Install new range hood.

3.3.7 Install new digital thermostat controls.


DATE

3.4 Refrigerant Lines New Works (Refer to Drawing No. RA-778889, Sheet No.
NO.
REV

001 & 002-Revision No. 00)


DISCIPLINE
ENGINEER
BOS CONTRACTOR shall:
DATE: 8-23-17
PROJECT
ENGINEER 3.4.1 Install new refrigerant piping with filter drier and sight glass.
AFB
DATE:
8-24-17 3.4.2 Install new insulation and aluminum cladding with to refrigerant piping
CERTIFIED
00-00-16
expose to outdoor when leak test is completed.
HAK
8-24-17
DATE: 3.4.3 Re-seal pipe sleeves of underground refrigerant lines with sealant.
CONSTRUCTION
AGENCY
SIM 3.4.4 Purge refrigerant lines with dry nitrogen, vacuum and charge with
9-20-17
DATE: refrigerant.
OPERATIONS

ASB 3.5 Testing commissioning


DATE:
9-25-17
CONTROL NUMBER

3.5.1 Perform pressure test on the refrigerant pipe lines in accordance with
VERIFICATION

the requirements of the Uniform Mechanical Code (UMC) and ASHRAE


EDSD

STD 15. The required test pressure shall be maintained for a minimum
of 10 minutes.
DATE:
BY:
REVISIONCERTIFICATION

3.5.2 Leak test and vacuum test refrigerant pipe lines in accordance with
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SAES-K-001, Section 5.3.2.4 & 5.3.2.5.


(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 19
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
3.5.3 Perform pre-startup and commissioning of A/C units as per SAES-K-
001, Section 5.5.1 & 5.5
ENGG CERT

3.5.4 Perform pre-startup and commissioning of new exhaust fans as per


manufacturer instruction.

4.0 MECHANICAL PLUMBING

4.1 General

CONTRACTOR shall:
DESCRIPTION

4.1.1 Shut-off isolation valves serving the area prior to start of any plumbing
work.

4.1.2 New plumbing installation shall be protected from contamination during


installation in accordance with SAES-S-060, Chapter 6 Section 613.0
and shall be disinfected in accordance with the requirements of SASC-
S-070, Section 9.7 & SASC-S-17 Section 6 of SAUDI ARAMCO
Sanitary Code GI-0151.006.
JO/EWO

4.1.3 Provide identification tags to all isolation valves as per SAES-B-067,


Item 4.3.
DATE

4.2 Removal Works


NO.
REV

CONTRACTOR shall
DISCIPLINE
ENGINEER
BOS 4.2.1 Remove existing electric sweet water heater.
DATE: 8-23-17
PROJECT
ENGINEER 4.2.2 Remove existing garbage disposer.
AFB
DATE:
8-24-17 4.3 New Works
CERTIFIED
00-00-16
HAK
4.3.1 Install new 20 gallons electric sweet water heater complete with ball
8-24-17
DATE: valves, fittings and fiberglass grating.
CONSTRUCTION
AGENCY
SIM 4.3.2 Install new garbage disposer.
9-20-17
DATE:
OPERATIONS 5.0 FIRE ALARM
ASB
DATE:
9-25-17 5.1 General
CONTROL NUMBER
VERIFICATION

5.1.1 Conduct site survey and verify existing detection alarm installation in
EDSD

preparation for the proposed installation of new detection alarm devices


and other related work. Notify Saudi ARAMCO Project Engineer of any
DATE:
BY:

discrepancy noted in the field prior to start of work.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

5.1.2 All works, installation, construction/testing and commissioning of the fire


alarm system shall be done in accordance with Saudi ARAMCO
(DCC) NO. _____________________

Engineering Standard, SAES-M-100 & NFPA 72, 2016 Edition.


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 20
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

5.2 Option 1 (As per Item No. 4 of Section 7.0 “Provisional Quantities”)
ENGG CERT

5.2.1 Removal (Refer to Drawing No. HA-003315, Sheet No. 001-Revision


No. 00)

CONTRACTOR shall:

5.2.1.1 Disconnect and remove existing self-contained smoke detector


and isolate wiring circuit from outlet switch & door chime.

5.2.2 New Work (Refer to Drawing No. HA-003315, Sheet No. 001 & 002-
DESCRIPTION

Revision No. 00)

CONTRACTOR shall:

5.2.2.1 Install new photoelectric smoke alarms at bedrooms and


hallways including conduits, flexible conduits, wires, boxes,
supports and fittings.

5.2.2.2 Install new electrochemical carbon monoxide sensors


JO/EWO

including conduits, flexible conduits, wires, boxes, supports


and fittings.
DATE

5.2.2.3 Install new enclosed step down transformer complete with


required fixing supports.
NO.
REV

DISCIPLINE
ENGINEER
5.2.2.4 Connect/tap the new circuit wires to the new panelboard.
BOS
DATE: 8-23-17 5.3 Option 2 (As per Item No. 5 of Section 7.0 “Provisional Quantities”)
PROJECT
ENGINEER
AFB 5.3.1 New Work (Refer to Drawing No. HA-003315, Sheet No. 002-Revision
DATE:
8-24-17 No. 00)
CERTIFIED
00-00-16
HAK
CONTRACTOR shall:
DATE:
8-24-17
CONSTRUCTION
AGENCY 5.3.1.1 Install new enclosed step down transformer complete with
SIM required fixing supports.
9-20-17
DATE:
OPERATIONS 5.3.1.2 Connect/tap the new circuit wires to the new panelboard.
ASB
DATE:
9-25-17 5.4 Testing & Commissioning
CONTROL NUMBER
VERIFICATION

CONTRACTOR shall:
EDSD

5.4.1 Conduct insulation resistance test and continuity test for new wirings
DATE:
BY:

prior to placing in service. Testing shall be done before installation of


devices. Submit a copy of testing report for any smoke alarm wirings.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

5.4.2 Conduct test and commission the newly installed fire detection devices
(DCC) NO. _____________________

upon completion of work for proper operation in accordance with


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 21
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
recommended procedure of National Fire Protection Association (NFPA
72, 2016 Edition), in the presence of SAUDI ARAMCO Project Engineer
to ensure that requirements are satisfactorily met.
ENGG CERT

6.0 ELECTRICAL

6.1 General

6.1.1 Conduct site visit to thoroughly familiarize with all details of the work
and working conditions, check location of electrical distribution system
and advice the SAUDI ARAMCO Project Engineer of any discrepancy.
DESCRIPTION

6.1.2 CONTRACTOR shall provide new panelboard directory and shall be


placed securely on the panelboard before completion of the project.
Device and switches shall be provided with tag for proper identification
of circuit.

6.1.3 All works, installation, construction/testing and commissioning of the


electrical system shall be done in accordance with SAUDI ARAMCO
Engineering Standard & NFPA 70, 2016 Edition.
JO/EWO

6.1.4 All conduit and pipe penetrations in fire walls shall be sealed with UL
listed SAUDI ARAMCO approved fire stop materials and shall be equal
or greater than the fire rated wall.
DATE

6.1.4.1 Installer or applicator of the above fire stop system shall be


NO.
REV

trained and certified by the manufacturer. CONTRACTOR


DISCIPLINE shall submit training certificate of the installer issued by the
ENGINEER
BOS manufacturer.
DATE: 8-23-17
PROJECT 6.1.5 Disconnect/lock-out power supply before any related electrical activities
ENGINEER
AFB
are carried-out. Power supply isolation shall comply with the
8-24-17 requirements of G.I.6.012 “Isolation, Lockout and Use of Hold Tags”.
DATE:
CERTIFIED
00-00-16
HAK 6.1.6 Household appliances to be supplied by the CONTRACTOR.
DATE:
8-24-17
CONSTRUCTION
AGENCY
6.1.6.1 Garbage disposer, 220V, 0.7HP, 60Hz. 380W.
SIM
DATE:
9-20-17 6.1.6.2 Sweet water heater, 220V, 60Hz. 20 Gal. capacity, 2500W.
OPERATIONS

ASB 6.1.6.3 Range Hood: 220V, 60Hz. variable speed fan, under cabinet
DATE:
9-25-17 type with integral lights, aluminum mesh filter, 280 CFM min.
CONTROL NUMBER
VERIFICATION

6.1.6.4 Ceiling mounted exhaust fan; 230V, 0.7W, 60Hz, Single


EDSD

Phase.
DATE:
BY:

6.1.6.5 Appliances shall be UL or recognized approved listing &


energy efficient.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 22
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
6.2 Removal (Refer to Drawing No. RA-778884, Sheet No. 001-Revision No. 00;
RA-778886, Sheet No. 001-Revision No. 00; RA-778887, Sheet No. 001-
Revision No. 00)
ENGG CERT

CONTRACTOR shall:

6.2.1 Disconnect and remove existing panelboard.

6.2.2 Disconnect and remove existing duplex receptacle outlets (120V) and
boxes.

6.2.3 Disconnect and remove existing duplex receptacle outlets (220V)


DESCRIPTION

including wires, box and conduits.

6.2.4 Disconnect and remove existing GFCI receptacle outlets.

6.2.5 Disconnect and remove existing washing machine, clothes dryer and
range outlets including boxes.

6.2.6 Disconnect and remove existing outlet for garbage disposal with switch,
dishwasher, refrigerator and freezer including wires and conduits.
JO/EWO

6.2.7 Disconnect and remove existing junction box of existing sweet and raw
water heater.
DATE

6.2.8 Disconnect and remove existing disconnect switches of ACCU, AHU.


NO.
REV

DISCIPLINE
ENGINEER
6.2.9 Disconnect and remove existing disconnect switches of duct heater
BOS including wires and conduits.
DATE: 8-23-17
PROJECT
ENGINEER 6.2.10 Disconnect and remove existing dimmer switch.
AFB
DATE:
8-24-17 6.3 New Work (Refer to Drawing No. RA-778884, Sheet No. 001-Revision No. 00;
CERTIFIED
00-00-16
RA-778885, Sheet No. 001-Revision No. 00; RA-778886, Sheet No. 001-
HAK
Revision No. 00; RA-778887, Sheet No. 001-Revision No. 00)
DATE:
8-24-17
CONSTRUCTION
AGENCY CONTRACTOR shall:
SIM
9-20-17
DATE: 6.3.1 Install new panelboard complete with fixing supports and fittings.
OPERATIONS

ASB 6.3.2 Install new disconnect switches for new ACCU & AHU.
DATE:
9-25-17
CONTROL NUMBER

6.3.3 Install new disconnect switches for existing duct heaters including
VERIFICATION

conduit and wires.


EDSD

6.3.4 Install new dimmer switch complete with faceplate.


DATE:
BY:
REVISIONCERTIFICATION

6.3.5 Install new duplex receptacle outlets with faceplate and boxes.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

6.3.6 Install new RCD receptacle outlet with switch for garbage disposer
(DCC) NO. _____________________

including conduit, wires, boxes, supports and fittings.


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 23
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

6.3.7 Install new RCD receptacle outlet for dishwasher including conduit,
wires, boxes, supports and fittings.
ENGG CERT

6.3.8 Install new receptacle outlet for freezer and refrigerator including
conduit, wires, boxes, supports and fittings.

6.3.9 Install new duplex receptacle outlets with residual current devices
(RCD) with faceplate.

6.3.10 Install new duplex receptacle outlets with residual current devices
(RCD) weatherproof cover.
DESCRIPTION

6.3.11 Install new receptacle outlet with residual current devices (RCD) for
washing machine with faceplate.

6.3.12 Install new switches for washing machine and clothes dryer.

6.3.13 Install new switch for range.

6.3.14 Install new switches for sweet and raw water heaters including supports
JO/EWO

and fittings.

6.3.15 Service and clean all lighting luminaires.


DATE

6.3.16 Replace incandescent bulbs with new 230 Volts LED bulbs as per item
1 of Section 7.0 “Provisional Quantities”.
NO.
REV

DISCIPLINE
ENGINEER
BOS 6.3.17 Replace existing fluorescent tubes and ballasts of existing fluorescent
DATE: 8-23-17 fixtures at Kitchen Area with new T-8 LED tubes and electronic energy
PROJECT miser/universal voltage (120-240V) ballast, respectively (applicable to
ENGINEER
AFB
units where kitchen has fluorescent fixtures) as per item 2 of Section 7.0
8-24-17 “Provisional Quantities”.
DATE:
CERTIFIED
00-00-16
HAK 6.3.18 Conduct insulation resistance test and continuity test of all existing
DATE:
8-24-17 power and lighting cables; replace wires with damaged insulations as
CONSTRUCTION
AGENCY
per Item 3 of Section 7.0 “Provisional Quantities”.
SIM
DATE:
9-20-17 6.3.19 Provide neutral lines to all power and lighting luminaire circuits. Rectify
OPERATIONS circuits with common neutral.
ASB
9-25-17 6.3.20 All outlets boxes shall be provided with cable entrance protection and
DATE:
cable restraint appropriate for the existing cables.
CONTROL NUMBER
VERIFICATION
EDSD

6.3.21 Install Arc Flash and Shock Hazard Warning Labels on all new electrical
distribution equipment in accordance with current version of SAUDI
DATE:

ARAMCO G.I. 2.721.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

6.4 Termination & Testing


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

6.4.1 Connect/tap all new power outlets and new circuit wires to the new
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 24
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
distribution panelboard.

6.4.2 Upon completion of electrical work, coordinate to Inspection Department


ENGG CERT

to conduct inspection of new works prior to concealment to ensure


quality of workmanship and safe installation.

6.4.3 Conduct Panel board circuit breaker test (Trip test, contact resistance
and insulation resistance).

6.4.4 Conduct operational tests and Energize the system to ensure that
requirements are satisfactorily met in the presence of SAUDI ARAMCO
Project Engineer.
DESCRIPTION

7.0 PROVISIONAL QUANTITIES

7.1 Provisional Quantities

7.1.1 The following are quantities which cannot be determined at bidding


stage and are not specifically shown on the drawings or described in
this Scope of Work.
JO/EWO

7.1.2 CONTRACTOR shall allow for the following quantities in his Lump Sum
price.
DATE

7.1.3 CONTRACTOR shall furnish all labor and materials required to


complete the work. All materials to be used shall be as specified on the
NO.
REV

drawings or in this scope of work.


DISCIPLINE
ENGINEER
BOS 7.1.4 CONTRACTOR shall use the following for the described works:-
DATE: 8-23-17
PROJECT
ENGINEER Item
Description Of Work Unit Qty.
AFB No.
DATE:
8-24-17 Percent
CERTIFIED
00-00-16 of the
HAK
Replace incandescent bulbs with new total
8-24-17 10
DATE:
1 230 Volts LED bulbs as per number
CONSTRUCTION
AGENCY Paragraph 6.3.16. of bulbs
SIM
per
9-20-17
DATE: House
OPERATIONS
Replace existing fluorescent tubes
ASB Percent
and ballasts of existing fluorescent
9-25-17 of the
DATE: fixtures at Kitchen Area with new T-8
total
CONTROL NUMBER

LED tubes and electronic energy


VERIFICATION

2 number 10
miser/universal voltage (120-240V)
EDSD

of bulbs
ballast, respectively (applicable to
per
DATE:

units where kitchen has fluorescent


BY:

House
fixtures) as per Paragraph 6.3.17.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 25
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
Percent
of Total
Replace building wires with damaged
Building
ENGG CERT

3 insulations as per Paragraph 6.3.18 15


Wires
above.
per
House
Percent
of the
Fire Alarm Option No. 1 as per total
4 50
Section 5.2 above. number
of
Houses
DESCRIPTION

Percent
of the
Fire Alarm Option No. 2 as per total
5 50
Section 5.3 above. number
of
Houses

7.1.5 Final Quantities


JO/EWO

7.1.5.1 Actual measurements of the above quantities shall be taken


daily and the quantities agreed by the SAUDI ARAMCO
DATE

Project Engineer and the CONTRACTOR. The agreed


amounts shall be recorded in “Quantities” sheets.
NO.
REV

“Quantities” sheets shall be signed by both the SAUDI


DISCIPLINE
ENGINEER ARAMCO Project Engineer and the CONTRACTOR’s
BOS Representative.
DATE: 8-23-17
PROJECT
ENGINEER 7.1.5.2 On completion of the Works, the above quantities will be
AFB reconciled in accordance with the agreed actual quantities.
DATE:
8-24-17 An adjustment will be made to the Contract by issuance of a
CERTIFIED
00-00-16 Variation Order in accordance with the General Service
HAK
Contract.
DATE:
8-24-17
CONSTRUCTION
AGENCY 8.0 DRAWINGS
SIM
9-20-17
DATE: 8.1 Project Drawings
OPERATIONS

ASB 8.1.1 Refer to Drawing Control Sheet No. RD-778891, Sheet No. 1 of 1, Rev.
9-25-17
DATE: No. 00.
CONTROL NUMBER
VERIFICATION

8.2 As Built Drawings


EDSD

DATE:

8.2.1 Upon completion of all works, the CONTRACTOR shall submit one set
BY:

of “As-Built” Drawing to the SAUDI ARAMCO. These Drawings shall


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

indicate all deviations from the contract Drawings and Scope of Work,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

and shall include dimensions, quantities, materials and products used in


(DCC) NO. _____________________

the construction with vendors name, address and prepared from


records kept up on a daily basis throughout the duration of the project.
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 26
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
The “As-Built” records shall be subject to examination by the SAUDI
ARAMCO Project Engineer.
ENGG CERT

8.2.2 “As Built Drawings” shall be electronic copy (Micro Station).

--END OF PART III DETAILED WORK DESCRIPTIONS--


NO. DESCRIPTION
JO/EWO
DATE
REV

DISCIPLINE
ENGINEER
BOS
DATE: 8-23-17
PROJECT
ENGINEER
AFB
DATE:
8-24-17
CERTIFIED
00-00-16
HAK
DATE:
8-24-17
CONSTRUCTION
AGENCY
SIM
9-20-17
DATE:
OPERATIONS

ASB
DATE:
9-25-17
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 27
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
ENGG CERT

PART IV – CONSTRUCTION SPECIFICATION


DESCRIPTION

TABLE OF CONTENT

DIVISION 01 – GENERAL REQUIREMENTS

SECTION 01600 – MATERIALS AND PRODUCTS

DIVISION 13 – SPECIAL CONSTRUCTIONS


JO/EWO

SECTION 13850 – FIRE ALARM SYSTEM

DIVISION 15 – MECHANICAL
DATE

SECTION 15440 – PLUMBING EQUIPMENT


NO.
REV

DISCIPLINE
ENGINEER SECTION 15781 – AIR CONDITIONING UNIT
BOS
DATE: 8-23-17 SECTION 15870 – EXHAUST FANS
PROJECT
ENGINEER
AFB DIVISION 16 – ELECTRICAL
DATE:
8-24-17
CERTIFIED
00-00-16 SECTION 16010 - BASIC ELECTRICAL REQUIREMENTS
HAK
8-24-17
DATE:
SECTION 16111 – RACEWAY
CONSTRUCTION
AGENCY
SIM
SECTION 16123 – WIRES AND CABLES
9-20-17
DATE:
OPERATIONS
SECTION 16135 – CABINETS & BOXES
ASB
9-25-17
DATE: SECTION 16140 – WIRING DEVICES
CONTROL NUMBER
VERIFICATION

SECTION 16195 – ELECTRICAL IDENTIFICATION


EDSD

SECTION 16440 – DISCONNECT SWITCH


DATE:
BY:
REVISIONCERTIFICATION

SECTION 16470 – DISTRIBUTION PANEL


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 28
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

DIVISION 01 - GENERAL REQUIREMENTS


ENGG CERT

SECTION 01600 - MATERIALS AND PRODUCTS

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. Products.
DESCRIPTION

B. Transportation and Handling.

C. Inspection and Examination.

D. Storage and Protection.

E. Manufacturers

F. Conflicts.
JO/EWO

1.02 REFERENCES
DATE

A. SAMSS for applicable products.


NO.
REV

B. SAES-S-070 Installation of Utility Piping Systems.


DISCIPLINE
ENGINEER
BOS 1.03 SUBMITTALS
DATE: 8-23-17
PROJECT
ENGINEER
A. At the request of the SAUDI ARAMCO Representative, or when
AFB required by other Sections, submit manufacturer’s recommended
DATE:
8-24-17 instructions for handling and storage of products, or provide a written
CERTIFIED procedure for same. Such instructions or procedures must take into
00-00-16
HAK account that storage periods of up to 18 months may be required.
DATE:
8-24-17
CONSTRUCTION 1.04 PRODUCTS
AGENCY
SIM
9-20-17 A. Specified materials or products in this construction specifications
DATE:
OPERATIONS
establish the minimum technical standards and required quality.
ASB
B. In every case, materials and products shall be new, without defects,
9-25-17
DATE: and products shall be received in factory-sealed containers. Do not
CONTROL NUMBER

use materials and equipment removed from existing premises, except


VERIFICATION

as specifically permitted by SAUDI ARAMCO Representative.


EDSD

C. Defects shall cause rejection of the product or material, even if earlier


DATE:
BY:

approved By the Company Representative. Any approval by SAUDI


REVISIONCERTIFICATION

ARAMCO shall not relieve the CONTRACTOR from complying with


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

the requirements of the drawings and Construction specifications and


the CONTRACTOR shall be responsible at his own expense for any
(DCC) NO. _____________________

changes resulting from his proposed substitutions which affect other


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 29
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
parts of his own work
D. Provide products throughout the Project which are compatible with
ENGG CERT

each other.
E. Where available and complying with requirements, provide standard
products which have been used previously and successfully in similar
applications, and which are recommended by manufacturers for
applications indicated.
F. Product Selection Limitations. Comply with the following for the
selection of Products:
DESCRIPTION

1. Any material or equipment shown on drawings or construction


specifications to be by a specific manufacturer shall be
construed to be provided as specified or approved equal.
2. “Or Approved Equal” (or an equivalent statement): Submit for
approval an equivalent product which complies with the
technical requirements, performance standards, and
appearance. Comply with requirements for substitutions per
para. 1.06, below.
JO/EWO

3. “Per SAUDI ARAMCO’s Approved Vendors List” (or equivalent


statement): Provide an equivalent Product which complies
DATE

with the technical requirements, performance standards, and


appearance from SAUDI ARAMCO’s Approved Vendors List.
NO.
REV

DISCIPLINE
4. Prescriptive Requirements: Selection of product which has
ENGINEER been certified and tested by the manufacturer to comply with
BOS
requirements, including prescriptive requirements, is
DATE: 8-23-17
PROJECT
CONTRACTOR’s option where no names are indicated.
ENGINEER
AFB 5. Visual Requirements: Where indicated to be selected from
DATE:
8-24-17 manufacturer’s standard options, selection is SAUDI ARAMCO
CERTIFIED
00-00-16 Representative’s option, subsequent to determination or
HAK
8-24-17
selection of manufacturer (CONTRACTOR’s option). Where
DATE:
indicated to be selected from among standard options
CONSTRUCTION
AGENCY available within the industry, selection is SAUDI ARAMCO
SIM
Representative’s option prior to determination or selection of
9-20-17
DATE: manufacturer.
OPERATIONS

ASB 6. Interior Finish Requirements: Interior wall and ceiling finishes


9-25-17
DATE: shall be tested and classified accordance to ASTM E 84 or UL
CONTROL NUMBER

723 and shall have a flame spread index not greater than that
VERIFICATION

specified in Table 803.9 of IBC 2009 and smoke developed


EDSD

index of not more than 450 and meeting the acceptance


DATE:

criteria of Section 803.1.2.1.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

G. Nameplates: Wherever indicated or needed for operation and


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

maintenance (O&M), provide permanent nameplates on equipment


(DCC) NO. _____________________

containing suitable O&M information in the English language (unless


17U092-092

otherwise specified).
SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 30
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

H. All materials and equipment required for these project shall be


physically checked by the SAUDI ARAMCO Representative(s) prior to
ENGG CERT

installation. All materials or equipment installed found to be


inappropriate and without the physical approval of the SAUDI
ARAMCO Representative shall be replaced by the CONTRACTOR at
his own expense.

I. Low-Emitting Materials: All indoor materials to be used in this project,


including sealants and sealant primers, architectural paints, coating
and primers, insulations, plastics, etc. shall comply with the required
VOC limits as listed in SAES-R-004, Appendix 1, and Section 4.3.2.5.
DESCRIPTION

1.05 TRANSPORTATION AND HANDLING

A. Where applicable, transport and handle products in accordance with


manufacturer’s instructions.

B. Provide equipment and personnel to handle products by methods to


prevent soiling, disfigurement, or damage.
JO/EWO

1.06 INSPECTION AND EXAMINATION

A. Promptly inspect shipments to ensure that products comply with


DATE

requirements, quantities are correct, and products are undamaged.


NO.
REV

B. All shop fabrications and assemblies delivered at the job site shall be
DISCIPLINE
ENGINEER
inspected for proper identification, completeness, and free from
BOS damage by a qualified person on behalf of the CONTRACTOR. Any
DATE: 8-23-17 conflict noted between project material selection or specification and
PROJECT
ENGINEER SAES or SAMSS shall be brought to the attention of the SAUDI
AFB ARAMCO Representative in writing.
DATE:
8-24-17
CERTIFIED
00-00-16
C. Utility piping and piping materials, including fittings and welding
HAK
solvents, etc., shall be inspected prior to use in accordance with Para.
8-24-17
DATE: 7 of SAES-S-070.
CONSTRUCTION
AGENCY
SIM D. All equipment shipped with protective covers or plugs over openings,
9-20-17
DATE: and with rust preventive coatings applied to exterior machined and
OPERATIONS threaded surfaces, shall be treated upon arrival at the job site, as
ASB follows:
DATE:
9-25-17
CONTROL NUMBER

1. If covers are loose or missing, the interior shall be inspected


VERIFICATION

for intrusion of water, dirt, or other foreign material. If any, the


EDSD

interior shall be cleaned, preservative restored if applicable,


and protective covers or plugs shall be replaced.
DATE:
BY:
REVISIONCERTIFICATION

1.07 STORAGE AND PROTECTION


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

A. General
(DCC) NO. _____________________
17U092-092

1. Store and protect all products in accordance with


SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 31
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
manufacturer’s instructions, as specifically stated in other
Sections, and/or in accordance with procedures approved by
the SAUDI ARAMCO Representative, with seals and labels
ENGG CERT

intact and legible.


2. Store weather sensitive Products inside Conex or other
weatherproof containers, with climate control equipment
meeting the manufacturer’s temperature and humidity
requirements.
3. For exterior storage of fabricated Products, place on sloped
supports, above ground.
DESCRIPTION

4. Provide off-site storage and protection when site does not


permit on-site storage or protection.
5. Cover Products subject to deterioration from sunlight,
humidity, blowing sand, rain, or other adverse climatic
conditions common to Saudi Arabia, with impervious sheet
covering. Provide ventilation to avoid condensation or
potential degradation of Product.
JO/EWO

6. Segregate dissimilar metallic materials which may result in


corrosion.
DATE

7. Arrange storage of Products to permit access for inspection.


Periodically inspect to verify Products are undamaged and are
maintained in acceptable condition.
NO.
REV

DISCIPLINE
ENGINEER 8. All materials (soil materials excepted), stored outdoors shall be
BOS positioned off the ground and above ground water pooling by
DATE: 8-23-17 use of timbers, pallets, or other appropriate means.
PROJECT
ENGINEER
AFB 9. Arrange storage for accessibility to Products as needed for the
DATE:
8-24-17 Work to avoid unnecessary handling.
CERTIFIED
00-00-16
HAK 10. Protect and maintain installed Products and Work safe from
DATE:
8-24-17 damage or deterioration at all times prior to Mechanical
CONSTRUCTION Completion.
AGENCY
SIM
9-20-17
11. Assure that the designated shelf life of paints and other similar
DATE:
Products will not be exceeded before use. Approval to use
OPERATIONS
any Product which has exceeded its specified shelf life must
ASB
be obtained in writing from the SAUDI ARAMCO
9-25-17
DATE: Representative prior to use.
CONTROL NUMBER
VERIFICATION

12. Assure that loss of identification of materials does not occur


EDSD

through storage, handling, or partial issue (especially bulk


items).
DATE:
BY:

B. Use of lubricants, preservatives, and rust preventatives


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

1. Concurrence from the equipment manufacturer for use of any


(DCC) NO. _____________________

temporary lubricants, preservatives, or rust preventatives, etc.


17U092-092

shall be obtained in order to maintain the manufacturer’s


SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 32
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
warranties.
2. Selection and specifications for preservatives shall define the
ENGG CERT

frequency of application and the need for removal prior to pre-


commissioning, mechanical completion, or start-up.
3. All interior and exterior surfaces shall be clean and dry before
the application of any rust preventative materials. Mineral
spirits such as Varsol or any standard solvent shall be used,
subject to manufacturer’s concurrence, for cleansing of
surfaces prior to application of any rust preventative.
Kerosene or gasoline shall not be used as cleaning agents.
DESCRIPTION

4. A rust preventative barrier coating that provides extended,


outdoor protection (semi-dry, translucent, self-healing, and
scratch resistant film; dilutable; spray, roll, brush, or dip
applied; removable with common solvents) is recommended
for use on exterior surfaces. Since such material does not
have lubricating properties, the film shall be removed from
bearing surfaces, threads, or areas that come in contact with
lubricants, prior to placing the protected item in service.
JO/EWO

5. Protective coatings, whether shop- or field-applied, shall be


inspected at two-month intervals and restored as necessary to
provide the required protection.
DATE

6. CONTRACTOR shall assure that preservative and rust


preventative coatings meet the intended function and are
NO.
REV

DISCIPLINE suitable for the application.


ENGINEER
BOS
C. Special Requirements
DATE: 8-23-17
PROJECT
ENGINEER 1. Equipment - General:
AFB
DATE:
8-24-17 a. Except for equipment specifically designed and procured
CERTIFIED for outdoor use, all equipment shall be stored indoors, or
00-00-16
HAK outdoors with suitable protective covering and ventilation,
DATE:
8-24-17 or as otherwise allowed by this Section.
CONSTRUCTION
AGENCY
SIM b. Protective covering for equipment designed and procured
9-20-17 for outdoor use is not required. Storage in the original
DATE:
OPERATIONS shipping containers is recommended to protect against
ASB
damage.
9-25-17
DATE: c. Openings such as conduits and piping, not intended to be
CONTROL NUMBER

open, shall be suitably sealed with watertight plugs.


VERIFICATION
EDSD

d. Obtain and comply with manufacturer’s recommendations


for connecting space heaters, where applicable, to a
DATE:
BY:

continuous (24hrs/day) source of AC power, as specified


REVISIONCERTIFICATION

on the nameplate, during storage and immediately


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

following installation, until Mechanical Completion.


(DCC) NO. _____________________

2. Low Voltage Equipment


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 33
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
a. All low voltage equipment such as lighting fixtures, dry
type transformers, push buttons, pilot lights, relays,
meters etc. shall be stored indoors in a dry enclosure
ENGG CERT

where condensation from humidity cannot occur.


3. Instruments:
a. Damaged instruments shall be functionally checked
according to the manufacturer’s specifications prior to
storage and shall be repaired or replaced as soon as
practicable. All instruments shall be stored indoors in
their original containers, marked with the proper tag
DESCRIPTION

numbers. Indoor temperature shall be controlled to


prevent condensation.
b. Prefabricated panel boards shall be left in their
shipping cases until moved to the point of installation.
c. Control equipment shall be stored and protected in
accordance with the manufacturer’s recommendations.
d. All instrument equipment, including Control Panels,
PLC’s (programmable logic controllers),
JO/EWO

microprocessors, and related equipment shall be


unpacked and maintained in a dust free air conditioned
DATE

environment, with a maximum temperature of 30°C


(86°F) and a maximum Relative Humidity of 50%.
NO.
REV

DISCIPLINE
4. Piping and Conduit:
ENGINEER
BOS a. Utility piping and piping materials, including fittings and
DATE: 8-23-17 welding solvents, etc., shall be handled, transported,
PROJECT
ENGINEER and stored in accordance with SAES-S-070.
AFB
8-24-17 b. All ends of piping shall be closed with temporary caps
DATE:
CERTIFIED or covers to prevent intrusion of debris, sand, water,
00-00-16
HAK etc.
DATE:
8-24-17
CONSTRUCTION
c. Avoid overstacking of PVC piping or conduit to prevent
AGENCY distortion.
SIM
9-20-17
DATE: d. Keep PVC and conduit out of direct sunlight by cover
OPERATIONS or inside storage.
ASB
DATE:
9-25-17 5. Cables:
CONTROL NUMBER
VERIFICATION

a. Cable stored on reels shall be protected from direct


EDSD

sunlight.
DATE:
BY:

b. All reels shall be lagged with timber for cable protection


REVISIONCERTIFICATION

and choked to prevent rolling.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

c. Assure that cable ends are sealed to avoid ingress of


(DCC) NO. _____________________

moisture.
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 34
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

6. Welding electrodes:
ENGG CERT

a. Welding electrodes shall be stored and handled in


accordance with SAES-W-001.

b. Coated welded electrodes shall be stored in an area


free of dust and oil.

7. Paint Materials:

a. Paint and thinners shall be stored indoors in well


DESCRIPTION

ventilated enclosures. Paints may be covered with


tarpaulins or equivalent at the application site for a
maximum of 14 days.

b. The date of manufacture shall be clearly marked on the


paint container.

c. Paints shall not be used from containers which show


signs of leakage.
JO/EWO

1.08 MANUFACTURERS and VENDORS


DATE

A. In no way shall any list of manufacturers, included in the Scope of


Work or in this construction specification under any sub-section titled
NO.
REV

"Manufacturers" and/or “Vendors”, be considered comprehensive or


DISCIPLINE
ENGINEER
exclusive. Nor shall it be construed as limiting or excluding submittal
BOS for SAUDI ARAMCO review and approval alternative manufacturers
DATE: 8-23-17 or equal materials supplied by non-listed manufacturers/vendors. The
PROJECT
ENGINEER list of manufacturers and vendors are intended solely to identify
AFB manufacturers and/or vendors who may be able to supply specified
DATE:
8-24-17 items or equal. Materials produced by listed manufacturers which do
CERTIFIED
00-00-16
not satisfy the requirements of the specifications shall not be used. All
HAK
manufacturers and vendors shall be approved by SAUDI ARAMCO.
DATE:
8-24-17
CONSTRUCTION
AGENCY 1.09 CONFLICTS
SIM
9-20-17
DATE: A. In the event of conflict between the Contract Documents and the
OPERATIONS manufacturer’s instructions for transportation, handling, storage, or
ASB protection, the SAUDI ARAMCO Representative will determine the
DATE:
9-25-17 procedures to be followed.
CONTROL NUMBER
VERIFICATION

PART 2 PRODUCTS
EDSD

DATE:

Not Used.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

PART 3 EXECUTION
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Not Used.
17U092-092

- END OF SECTION 01600 – MATERIALS & PRODUCTS -


SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 35
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

DIVISION 13 – SPECIAL CONSTRUCTIONS


ENGG CERT

SECTION 13850 – FIRE ALARM SYSTEM

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. Self-Contained Fire Alarm System.


DESCRIPTION

1.02 REFERENCES

A. Underwriter's Laboratories (UL)

a. UL 797: Electrical Metallic Tubing

b. UL 6: Rigid Metal Conduit

c. UL 268: Smoke Detectors for Fire-Protective Signaling Systems


JO/EWO

B. National Fire Protection Association (NFPA)


DATE

a. NFPA 13: Sprinkler System


NO.
REV

b. NFPA 70: National Electric Code


DISCIPLINE
ENGINEER
BOS c. NFPA 72: National Fire Alarm Code
DATE: 8-23-17
PROJECT
ENGINEER C. NETA: National Electrical Testing Association
AFB
DATE:
8-24-17 D. IEEE: Institute of Electrical and Electronics Engineers
CERTIFIED
00-00-16
HAK
E. HSE: Health, Safety and Environment
DATE:
8-24-17
CONSTRUCTION
AGENCY 1.03 SUBMITTALS
SIM
9-20-17
DATE: A. Product Data: Submit manufacturer's technical product data, including
OPERATIONS
specifications and installation instructions, for each type of fire alarm system
ASB equipment. Include standard or typical riser and wiring diagrams, and operation
DATE:
9-25-17 and maintenance instructions for inclusion in maintenance manuals.
CONTROL NUMBER
VERIFICATION

B. Shop Drawings: Provide shop drawings showing equipment/device locations and


EDSD

connecting wiring of entire fire alarm system. Include wiring and riser diagrams.
Submittal shall be certified by a SAUDI ARAMCO approved registered
DATE:
BY:

professional or chartered engineer, and shall include an official documentation


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

(sealed/stamped review letter) from said engineer stating that all requisite
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

drawings/documents/calculations have been satisfactorily reviewed.


(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 36
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

Submittal shall be certified by a SAUDI ARAMCO approved registered


professional or chartered engineer, and shall include an official documentation
ENGG CERT

(sealed/stamped review letter) from said engineer stating that all requisite
drawings/documents/calculations have been satisfactorily reviewed.

C. Maintenance Data: Submit maintenance data and parts lists for each type of fire
alarm, emergency voice evacuation and gas leak detection equipment installed,
including furnished specialties and accessories. Include this data, product data,
and shop drawings in maintenance manual; in accordance with requirements of
Division 1.
DESCRIPTION

D. Fire layout drawings detailing fire zones, alarm zones and all fire devices shall be
provided by CONTRACTOR for approval by Company.

1.04 QUALITY OF ASSURANCE

A. System Installers.

1. Personnel shall be qualified as per NFPA 72 or otherwise, supervised by


persons who are qualified in the installation, inspection, and testing of fire
JO/EWO

alarm system. Evidence of qualification or certification shall be provided


when requested by SAUDI ARAMCO.
DATE

2. Qualified personnel shall include, but not limited to, one or more of the
following:
NO.
REV

DISCIPLINE
ENGINEER
a. Personnel who are factory trained and certified for fire alarm system
BOS installation of the specific type and brand of system being installed.
DATE: 8-23-17
PROJECT
ENGINEER b. Personnel who are certified by recognized certification organization
AFB acceptable to SAUDI ARAMCO.
DATE:
8-24-17
CERTIFIED
00-00-16
B. Codes and Standards
HAK
8-24-17
DATE: 1. NEC Compliance: Comply with applicable requirements of NEC standards
CONSTRUCTION
AGENCY pertaining to fire alarm system.
SIM
9-20-17
DATE: 2. UL Compliance and Labeling: Comply with provisions of UL safety
OPERATIONS standards pertaining to fire alarm system; and provide products and
ASB components which are UL-listed and labeled.
DATE:
9-25-17
CONTROL NUMBER

3. FM Compliance: Provide fire alarm system and accessories which are


VERIFICATION

FM-approved.
EDSD

1.05 DELIVERY, STORAGE, AND HANDLING


DATE:
BY:
REVISIONCERTIFICATION

A. Handle fire alarm equipment carefully to prevent damage, breaking, and scoring.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

Do not install damaged equipment or components; replace with new.


(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 37
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

B. Store fire alarm equipment’s in clean, dry place. Protect from weather, dirt,
fumes, water, construction debris, and physical damage.
ENGG CERT

1.06 TESTING REPORTS

A. Upon completion of the devices installation, an approved representative of the


manufacturer shall be present to conduct a thorough test and submit a report of
findings to SAUDI ARAMCO Project Engineer. The test shall include the
following:

1. The functional operation of each device


DESCRIPTION

2. Visual inspection of wiring connections.

B. Upon Completion of the work the CONTRACTOR shall submit to the SAUDI
ARAMCO Project Engineer “As Built” drawings and supply operating manuals for
the systems/ Equipment used in the installation.

PART 2 - PRODUCTS
JO/EWO

2.01 MANUFACTURERS & VENDORS


DATE

A. Manufacturer(s) Reference(s):
NO.
REV

General Electric (Edwards)


DISCIPLINE
ENGINEER
201 City Center Drive Suite 500
BOS Mississauga, Ontario, Canada, L5B 2T4
DATE: 8-23-17 Tel. No. (001) 905-270-1711
PROJECT
ENGINEER Fax No.: (001) 905-270-9553
AFB Website: www.gesecurity.com
DATE:
8-24-17
CERTIFIED
00-00-16
SIEMENS ltd.
HAK
Baladia Road corner Binzager St., 2142 Jeddah
8-24-17
DATE: Tel. No. +966 (2) 661 8888
CONSTRUCTION
AGENCY Int’l. Tel No. +49 69 797 6660
SIM Website: www.siemens.com.sa
9-20-17
DATE: Vendor(s): Safety & Security Equipment. Co. Ltd.
OPERATIONS P.O. Box 4645, Al-Khobar 31952, KSA
ASB Tel No. 03 896 2345
DATE:
9-25-17 Fax No. 03 867 0469
CONTROL NUMBER
VERIFICATION

HONEYWELL INT’L / Notifier


EDSD

101 Columbia Road Mail stop – M6/LM


Morristown, NJ 07962
DATE:
BY:

Tel. No. +973 455 3338


REVISIONCERTIFICATION

Website: www.honeywell.com
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

B. Recommended Vendor(s)/Supplier(s):
(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 38
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

Honeywell DTV
Dhahran Techno Valley (DTV) – Dhahran
ENGG CERT

PO Box 31916, Khobar 31952 KSA


Tel. No. +966 3 813 3777
Fax: No. +966 3 813 3888

Honeywell Turki Arabia Ltd.


P.O. Box 718 – Dammam 31421 KSA
Tel. No. +966 3 834 2442 x 103
Fax No. +966 3 834 2828
DESCRIPTION

G.E. Industrial Systems


P.O. Box 10211, Riyadh, 11433 KSA
Tel. No.: +966-1-406-7622
Fax No.: +966-1-404-1561
Albilad Fire Fighting Sys. LTD
Tel. No. : 03-812-1023
Fax No. : 03-812-1597
Email: www.albilad.com.sa
JO/EWO

NESMA & Partners Co.


Tel. (03) 865-5926 ext. 450 /
DATE

Fax (03) 865-6126


P.O. Box 1498 Al-Khobar 31952 KSA
Email: [email protected]
NO.
REV

DISCIPLINE
ENGINEER 2.02 GENERAL
BOS
DATE: 8-23-17
PROJECT
A. All equipment and materials to be used shall be of standard components,
ENGINEER
regularly manufactured, by only one manufacturer.
AFB
8-24-17
DATE: B. All systems and components shall have been thoroughly tested and proven in
CERTIFIED
00-00-16
HAK
actual size.
8-24-17
DATE:
CONSTRUCTION
C. All equipment shall be listed and labeled by Underwriter’s Laboratories and
AGENCY must be mutually compatible.
SIM
9-20-17
DATE:
2.03 FIRE ALARM SYSTEM
OPERATIONS

ASB
A. Fire Alarm Devices
DATE:
9-25-17
CONTROL NUMBER

1. Smoke Alarm: Photo Electric Type - Multi Station Smoke Alarm, Model
VERIFICATION

9223F or approve equal, which shall provide the following properties or


EDSD

functions or features: - Infrared LED sensing circuit with LED sensing


DATE:

indicator, green LED for AC power on, fully insect screened,


BY:

interconnected, 90dBa temporal 3 evacuation piezo horn, Powered by


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

220VAC and 9VDC alkaline backup battery with low/missing battery


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

indicator, 60Hz. In compliance with NFPA 72, 2016 Edition and UL 217-
(DCC) NO. _____________________

15/UL1730-06 Listed; and provided with one (1) year warranty.


17U092-092

Manufacturer Reference Gentex.


SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 39
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
2. Electrochemical Sensor Carbon Monoxide Alarm; Model: CO1209 Series,
provided with a push button test that simulates an actual CO condition in
full compliance with ANSI/UL 2034-17 and NFPA 720, 2015 Edition.
ENGG CERT

Features of the CO alarm series include, a temporal 4 tone for CO alarm


annunciation, DUALINK – differentiating tones indicating a smoke alarm
(temporal 3) or a CO alarm (temporal 4). Powered by 120VAC with 9VDC
battery backup. Manufacturer Reference Gentex.

3. 8” x 12” x 6” DP. Closure with step down transformer; primary: 240VAC,


secondary: 120VAC, 60Hz, 100VA (UL listed). (9T58K2804) by GE or
approved equal.
DESCRIPTION

PART 3 – EXECUTION

3.01 EXAMINATION

A. Examine areas and conditions under which fire alarm and gas leak detection
system are to be installed. Do not proceed with work until unsatisfactory
conditions have been corrected in manner acceptable to Installer.
JO/EWO

3.02 INSTALLATION OF FIRE ALARM SYSTEM.

A. Install fire alarm system as indicated, in accordance with equipment


DATE

manufacturer's written instructions and complying with applicable portions of


NEC and NECA's "Standard of Installation."
NO.
REV

DISCIPLINE
ENGINEER
B. Wiring: Wiring of fire alarm system is work of this section, but is not specifically
BOS detailed on drawings.
DATE: 8-23-17
PROJECT
ENGINEER 1. Complete wiring in accordance with manufacturer's requirements. Color
AFB code wiring and install per manufacturer's point-to-point wiring diagram.
DATE:
8-24-17 Determine exact number of wires for each fire area zone from number
CERTIFIED
00-00-16
and types of devices installed. Connect each device with sufficient wiring
HAK
to complete its intended operation.
DATE:
8-24-17
CONSTRUCTION
AGENCY 2. Where there are a number of power requiring devices such as smoke
SIM detectors and smoke damper operators installed in a circuit, group in
9-20-17
DATE: numbers so power required does not exceed 80% of manufacturer's
OPERATIONS power supply rating. Provide extra wiring, or extra power supplies
ASB required to fulfill that requirement. In addition, provide extra or larger size
DATE:
9-25-17 wiring to alleviate voltage drops which makes device operate beyond
CONTROL NUMBER

voltage limits for which it was designed. Determine above with


VERIFICATION

manufacturer's representative while equipment is being installed.


EDSD

3. All detectors locations shall be reviewed by the CONTRACTOR with


DATE:
BY:

respect to HVAC diffuser and building features to insure that devices will
REVISIONCERTIFICATION

operate properly.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

4. Connection of field wiring to alarm initiating devices and alarm signaling


(DCC) NO. _____________________

devices shall be monitored for integrity. Low voltage (600V and below)
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 40
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
cables including splices to new cable shall be megger tested with 500
VDC after installation and prior to placing in service.
ENGG CERT

3.03 TERMINATION, TESTING AND COMMISSIONING

A. Fire Alarm System

1. Provide start up, testing and commissioning procedures as guidelines for


testing. Test entire system upon completion of work for proper operation
in accordance with recommended procedure of National Fire Protection
Association (NFPA) 72 in the presence of SAUDI ARAMCO Project
Engineer and Fire Protection Department (FrPD) to ensure that
DESCRIPTION

requirements are satisfactorily met.

2. Upon satisfactory completion of testing and commissioning operations,


the systems shall be handed over to the SAUDI ARAMCO Project
Engineer and a completion certificate shall be provided by the
CONTRACTOR.

- END OF SECTION 13850 – FIRE ALARM SYSTEM -


NO. JO/EWO
DATE
REV

DISCIPLINE
ENGINEER
BOS
DATE: 8-23-17
PROJECT
ENGINEER
AFB
DATE:
8-24-17
CERTIFIED
00-00-16
HAK
DATE:
8-24-17
CONSTRUCTION
AGENCY
SIM
9-20-17
DATE:
OPERATIONS

ASB
DATE:
9-25-17
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 41
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

DIVISION 15 – MECHANICAL
ENGG CERT

SECTION 15440 - PLUMBING EQUIPMENT

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. Plumbing Equipment

1. Electric Water Heater


DESCRIPTION

2. Garbage Disposal (Sink Erator)

1.02 REFERENCES

A. SAUDI ARAMCO STANDARDS;

SAES-L-105 Piping Material Specifications


JO/EWO

SAES-L-108 Selection of Valves


DATE

SAES-S-040 Saudi ARAMCO Water System


NO.
REV

DISCIPLINE
ENGINEER SAES-S-060 Saudi ARAMCO Plumbing Code
BOS
8-23-17
DATE:
Floor-Affixed Supports For Off-The-Floor Plumbing
PROJECT ASME A112.6.1 M-12
ENGINEER Fixtures For Public Use
AFB
DATE:
8-24-17
CERTIFIED
ASME A112.18.1-12 Finished and Rough Brass Plumbing Fixture Fittings.
00-00-16
HAK
8-24-17
DATE: ASME A112.19.1-13 Enameled Cast Iron Plumbing Fixtures.
CONSTRUCTION
AGENCY
SIM
9-20-17 ASME A112.19.2 -13 Ceramic Plumbing Fixtures -
DATE:
OPERATIONS

ASB ASME A112.19.4M- 09 Porcelain Enameled Formed Steel Plumbing Fixtures.


DATE:
9-25-17
CONTROL NUMBER
VERIFICATION

B. INDUSTRY CODES AND STANDARDS:


EDSD

DATE:

Floor-Affixed Supports For Off-The-Floor Plumbing


ASME A112.6.1 M-12
BY:

Fixtures For Public Use


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

ASME A112.18.1-12 Finished and Rough Brass Plumbing Fixture Fittings.


(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 42
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

ASME A112.19.1-13 Enameled Cast Iron Plumbing Fixtures.


ENGG CERT

ASME A112.19.2 -13 Ceramic Plumbing Fixtures -

ASME A112.19.4M- 09 Porcelain Enameled Formed Steel Plumbing Fixtures.

Flush valves and spuds for water closets, urinals, and


ASME A112.19.5-16 tanks
DESCRIPTION

1.03 SUBMITTALS

A. Product Data: Provide data catalogue illustrations of fixtures and accessories,


sizes, rough-in dimensions, utility sizes, trim, and finishes.

B. Manufacturer's Installation Instructions.

1.04 OPERATION AND MAINTENANCE DATA


JO/EWO

A. Maintenance Data: Include fixture trim exploded view and replacement parts
lists.
DATE

1.05 DELIVERY, STORAGE, AND HANDLING


NO.
REV

A. Delivery, store, protect and handle products to site.


DISCIPLINE
ENGINEER
BOS B. Accept fixtures on site in factory packaging. Inspect for damage.
DATE: 8-23-17
PROJECT
ENGINEER
C. Protect installed fixtures from damage by securing areas and by leaving factory
AFB packaging in place to protect fixtures and prevent use.
DATE:
8-24-17
CERTIFIED
00-00-16
1.06 FIELD MEASUREMENTS
HAK
DATE:
8-24-17 A. Do not scale Plumbing Drawings. Refer to Architectural Drawings for dimensional
CONSTRUCTION
AGENCY information. Verify that field measurements are indicated on shop drawings.
SIM
9-20-17
DATE:
OPERATIONS PART 2 PRODUCTS
ASB
DATE:
9-25-17 2.01 PLUMBING EQUIPMENT
CONTROL NUMBER
VERIFICATION

A. Electric Water Heater: 20 gallons capacity, vertical 150 psi working pressure
EDSD

glass lined tank; incoloy immersion heating elements; thermostats & high
temperature cut-off; T & P relief valve; magnesium anode; foam insulation
DATE:
BY:

per NAECAS. 90; baked enamel sheet metal jacket; drain valve; ANSI/UL-
REVISIONCERTIFICATION

174, AHRI Certified; 230V/1Ph/60Hz; 2500 watts, two elements; 0.94


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Energy factor, 3/4” NPT inlet & outlet. Manufacturer Reference– AO Smith
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

or approved equal.
(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 43
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
1. Fiberglass Grating (Water Heater): Polyester resin; fire retardant and
chemical resistant; non-skid type; min. section modulus 0.04
cu.cm./m.(1.303 cu.in./ft.) of width, allowable safe uniform load factor of
ENGG CERT

safety 1:2.

B. Garbage Disposal (Sink Erator): with 2-stage grind and auto reverse grind
system stainless steel grind chamber, grinding element, 0.70Hp, 220-240V,
60Hz, 380Watts, 1725RPM. Manufacturer Reference Model: Evolution 100.

2.02 PIPE HANGERS AND SUPPORTS:

A. Band Hanger; One-piece adjustable, Carbon Steel body, galvanized finish,


DESCRIPTION

provides 1” to 2” vertical adjustment with the pipe and hanger in position.

B. Clevis Hanger: two-piece adjustable, Carbon Steel body, galvanized finish,


comply with Standardization Society SP-69.

C. Threaded Rod; 10 mm (3/8”) diameter, 1.8 M (6 ft) length, steel body,


galvanized finish, 24 thread per inch with continuous thread.

D. Universal C-Type clamp


JO/EWO

2.03 RECOMMENDED VENDOR(S) / SUPPLIER(S)


DATE

A. BINEX
P.O. Box 2194, Al Khobar 31952, KSA
NO.
REV

Contact Person: Zoeb Kagalwala


DISCIPLINE
ENGINEER
Tel. No. (013) 882-3030
BOS Fax No. (013) 882-6816
DATE: 8-23-17 E-mail: [email protected]
PROJECT
ENGINEER E-mail: [email protected]
AFB
DATE:
8-24-17 B. Khaled Al-Mulhem & Bros. Co.
CERTIFIED
00-00-16
P.O. Box 1275, Dammam 31431, KSA
HAK
Contact Person: Irfan Khan / Zahid Karim
8-24-17
DATE: Tel. No. (013) 833-4932 / 832-6997
CONSTRUCTION
AGENCY Fax No. (013) 834-5188 / 831-0847
SIM E-mail: [email protected]
9-20-17
DATE:
OPERATIONS C. Ibrahim Al-Najran
ASB P.O. Box 175, Al Khobar 31952, KSA
DATE:
9-25-17 Contact Person: Saad Shloan
CONTROL NUMBER

Tel. No. (013) 882-0013 / 864-0043


VERIFICATION

Fax No. (013) 882-0373 / 864-4509


EDSD

E-mail: [email protected]
DATE:
BY:

D. ZAMIL Glass Industries


REVISIONCERTIFICATION

Tel. No.: 857-5177


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

Fax No.: 857-5440


(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 44
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

E. Building Material Trading Co. Ltd. (BMTC)


P.O. Box 939, Al-Khobar 31952, KSA
ENGG CERT

Contact Person: Alfhonse Tandog


Tel. No. (013) 882-5152
Fax No. (013) 882-5992

F. SAPPCO (Saudi Plastic Product Co.)


1st Dammam Industrial City, 42nd Street
P.O. Box 4916, Dammam 31412, KSA
Tel. No. +966-13-847-3323, 847-1703
Fax No. +966-13-847-1969
DESCRIPTION

E-mail: [email protected]

G. Amiantit Fiberglass Industries Ltd. (AFIL) (Manhole)


P.O. Box 589, Dammam 31421, KSA
Tel. No. (013) 847-1500 Ext. 1504
Fax No: (013) 847-2133

NOTE: Recommended Product(s) or Model(s)/ Manufacturer(s) / Vendor(s)


described above are for product reference purposes only. Other
JO/EWO

Manufacturer(s) / Vendor(s) are acceptable but products to be


supplied should be of the same quality as described or better and
approved by SAUDI ARAMCO.
DATE

PART 3 - EXECUTION
NO.
REV

DISCIPLINE
ENGINEER
3.01 EXAMINATION
BOS
DATE: 8-23-17 A. Verify that walls and floor finishes are prepared and ready for installation of
PROJECT
ENGINEER fixtures.
AFB
DATE:
8-24-17 B. Verify that electric power is available and of the correct characteristics.
CERTIFIED
00-00-16
HAK
3.02 PREPARATION
DATE:
8-24-17
CONSTRUCTION
AGENCY A. Rough-in fixture piping connections in accordance with minimum sizes indicated
SIM in fixture rough-in schedule for particular fixtures.
9-20-17
DATE:
OPERATIONS 3.03 INSTALLATION
ASB
DATE:
9-25-17 A. Install in accordance with Saudi Aramco Sanitary Code.
CONTROL NUMBER
VERIFICATION

B. Install in accordance with manufacturer's instructions.


EDSD

C. Install each fixture with a trap which shall be easily removable for servicing and
DATE:
BY:

cleaning.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

D. Install components level and plumb.


(DCC) NO. _____________________

E. Install and secure fixtures in place with wall supports and bolts.
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 45
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

F. Seal fixtures to wall and floor surfaces with sealant as specified in Section 07900,
color to match fixture.
ENGG CERT

G. Solidly attach water closets to floor with lag screws. Lead flashing is not
intended to hold fixture in place.

H. All piping penetrating a fire rated wall shall be installed in a metal sleeve which
shall be one size larger than the pipe. Escutcheons shall cover the wall opening
and sleeve.

I. Installation of sewer manhole shall be in accordance with 12-SAMSS-024


DESCRIPTION

(Fiberglass Reinforced Plastic Manhole and Access Cover with Frame) and
tested in accordance with SAES-S-070.

3.04 INTERFACE WITH OTHER PRODUCTS

A. Confirm location and size of fixtures and openings before rough in and
installation.

3.05 ADJUSTING
JO/EWO

A. Adjust stops or valves to the intended water flow rate for plumbing fixtures to
prevent splashing, noise or overflow.
DATE

3.06 CLEANING
NO.
REV

DISCIPLINE
ENGINEER
A. At completion clean plumbing fixtures and equipment.
BOS
DATE: 8-23-17 3.07 PROTECTION AND FINISHED WORK
PROJECT
ENGINEER
AFB A. Do not permit use of fixtures until building is handed over to the proponent.
DATE:
8-24-17
CERTIFIED
00-00-16
HAK
DATE:
8-24-17
CONSTRUCTION
AGENCY
SIM - END OF SECTION 15440 - PLUMBING EQUIPMENT -
9-20-17
DATE:
OPERATIONS

ASB
DATE:
9-25-17
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 46
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

DIVISION 15 – MECHANICAL
ENGG CERT

SECTION 15781 – AIR CONDITIONING UNIT

PART 1 – GENERAL

1.01 SECTION INCLUDES

A. Furnishing of (ACCU and AHU) – DX Split Air Conditioner

B. Refrigerant line
DESCRIPTION

C. Condensate Drain Piping

D. Accessories

1.02 RELATED SECTION

A. Section 15870 – Toilet Exhaust Fans


JO/EWO

1.03 QUALITY ASSURANCE


DATE

A. SAUDI ARAMCO ENGINEERING STANDARDS


NO.
REV

DISCIPLINE
ENGINEER
SAES-L-105 Piping Material Specifications
BOS
DATE: 8-23-17
PROJECT
SAES-L-108 Selection of Valves
ENGINEER
AFB
DATE:
8-24-17 SAES-S-040 Saudi ARAMCO Water System
CERTIFIED
00-00-16
HAK
DATE:
8-24-17 SAES-S-060 Saudi ARAMCO Plumbing Code
CONSTRUCTION
AGENCY
SIM SAMSS Saudi ARAMCO Material Systems Specifications
9-20-17
DATE:
OPERATIONS Saudi ARAMCO Heating, Ventilation and Air
SAES-K-001
ASB Conditioning (HVAC)
DATE:
9-25-17
SAES-K-100 SAUDI ARAMCO Mechanical (HVAC) Code.
CONTROL NUMBER
VERIFICATION
EDSD

B. INDUSTRY CODES AND STANDARD ORGANIZATIONS;


DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Laboratory Methods of Testing Fans for Certified


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

AMCA 210-16
Aerodynamic Performance Rating
(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 47
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
Forced-Circulation Air-Cooling and Air-Heating
AHRI 410 -01
Coils
HVAC Applications, Systems and Equipment,
ENGG CERT

ASHRAE Handbooks
Fundamentals and Refrigeration
ASHRAE STD 62.1-16 Ventilation for Acceptable Indoor Air Quality

NFPA 1 -15 Fire Code

NFPA 70-17 National Electric Code


Installation of Air Conditioning and Ventilating
NFPA 90A-15
Systems
DESCRIPTION

NFPA 101-15 Life Safety Code

SMACNA -02 HVAC Systems-Testing, Adjusting and Balancing


Building Systems Analysis and Retrofit Manual -
SMACNA -11
Second Edition
SMACNA -04 Indoor Air Quality 3rd Edition
JO/EWO

UMC-15 Uniform Mechanical Code

UL 984 -96 Hermetic Refrigerant Motor Compressors


DATE

C. Certification: The air conditioning units shall be designed, constructed, assembled,


NO.
REV

rated and tested in accordance with applicable codes and standards.


DISCIPLINE
ENGINEER
BOS 1.04 SUBMITTALS
DATE: 8-23-17
PROJECT
ENGINEER Submit the following for all items required as applicable:
AFB
DATE:
8-24-17 A. Unit specifications including weights and dimensions.
CERTIFIED
00-00-16
HAK
B. Electrical data including wiring diagrams.
DATE:
8-24-17
CONSTRUCTION
AGENCY C. Description of materials and methods of construction including finishes for units and
SIM all components.
9-20-17
DATE:
OPERATIONS D. Description of cooling/or heating sequence of operation.
ASB
DATE:
9-25-17 E. Complete air data including fan motor electric characteristics and air volumes at
CONTROL NUMBER

design, external static pressure and sound rating. Fan curve shall be provided with
VERIFICATION

specified operating point clearly plotted to verify performance.


EDSD

F. Description of heat exchangers including the cooling coil and condenser coil.
DATE:
BY:
REVISIONCERTIFICATION

G. Description of air filters media, size and quantities.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

H. Description of all auxiliary equipment.


(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 48
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
I. Cooling capacities at design condition and flow rates.

J. Installation recommendation including support arrangement, etc.


ENGG CERT

K. Submit recommended spare parts list for each unit under this section. List shall
include part numbers, and description of each part, and the price of each part.

L. System Drawings

1. Electrical System Wiring Diagrams

a. Elementary Wiring Diagrams: Submit complete electrical wiring diagrams of the


DESCRIPTION

entire control system.


b. Interconnection Control Wiring Diagram: Shall show all field wiring required
between the various controllers. Starter, panels and remote mounted devices,
with conductor and terminal identification.
M. Operation and Maintenance Manuals: Furnish an operation and maintenance manual
for each item of equipment listed under "Manufacturer's Data." The manuals shall
contain full hardware support documentation, which shall include, without being limited
to, the following:
JO/EWO

1. General description and specifications.


DATE

2. Installation and initial checkout procedures.


NO.
REV

3. Principles and theory of operation.


DISCIPLINE
ENGINEER
BOS 4. Detailed electrical and logical description.
DATE: 8-23-17
PROJECT
ENGINEER
5. Complete trouble-shooting procedures, diagrams and guidelines.
AFB
DATE:
8-24-17 6. Complete alignment and calibration procedures for all components.
CERTIFIED
00-00-16
HAK 7. Preventive maintenance requirements.
DATE:
8-24-17
CONSTRUCTION
AGENCY 8. Detailed schematics and assembly drawings.
SIM
9-20-17 9. Complete spare parts lists.
DATE:
OPERATIONS

ASB 10. Interface requirements and capabilities.


DATE:
9-25-17
11. Signal identification and timing diagrams.
CONTROL NUMBER
VERIFICATION
EDSD

1.05 PRODUCT HANDLING


DATE:
BY:

A. Units shall ship fully assembled on factory installed base rails/mounting legs up
REVISIONCERTIFICATION

to practical shipping and rigging limitations. Unit not shipped fully assembled
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

shall have tags and airflow arrows on each direction of airflow. Each section shall
have lifting lugs or shipping skid to allow for field rigging and final placement of
(DCC) NO. _____________________

section.
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 49
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

B. Deliver units to site with fan motors, sheaves, and belts completely assembled
and mounted in units.
ENGG CERT

C. Store units in clean dry place and protect from weather and construction traffic.
Handle unit carefully to avoid damage to components, enclosure and finish.

PART 2 - PRODUCTS

2.01 (ACCU and AHU) – DX SPLIT AIR CONDITIONER

A. Air Cooled Condensing Unit (ACCU) unit Direct Expansion type: Model No.CX-
DESCRIPTION

090, 81,824 BTU/H total cooling capacity, at 116°F outdoor temperature,


Refrigerant R-410A; 400VAC, 3Phase, 60Hz. Compressor Rated load Ampere
9.9(RLA) lock rotor ampere 64 (LRA) and full load ampere 2.3 (FLA); Minimum
EER 11.2; AHRI certified. Manufacturer Reference - ZAMIL Conditioners or
approved equal.

B. Air Handling Unit (AHU): Model BY-10, vertical type discharge, 81,824 BTU/H
total cooling capacity, at 116°F outdoor temperature , 1 external static pressure
(Inches of H2O), Air flow capacity: 2,800 CFM; 400VAC, 3Phase, 60Hz. Blower
JO/EWO

Drive 2Hp, 710 RPM. EER 11.2; AHRI certified, Washable filter. Manufacturer
Reference- ZAMIL Air Conditioners or approved equal.
DATE

2.02 REFRIGERANT LINE


NO.
REV

A. Sight Glass: Liquid/moisture indicator, wet/dry scale, glass with copper plate steel
DISCIPLINE
ENGINEER
body, UL, glass-in cap type, single port`
BOS
DATE: 8-23-17 B. Filter Drier: Refrigerant service, sealed, standard activated, UL and CSA listed.
PROJECT
ENGINEER Manufacturer Reference – Sporlan Valve Company or approved equal.
AFB
DATE:
8-24-17 C. Insulation (Refrigerant Pipe): 19 mm (3/4”) thick, elastomer cellular, flexible, Meet
CERTIFIED
00-00-16
ASTM 411, C534 Type 1, D 1056-00-2C1 and E84, density 48-96 kg/m3, 0.0353
HAK
W/M-K thermal conductivity @ 75ºF (24ºC) mean temperature. Manufacturer
8-24-17
DATE: Reference – K-FLEX USA or approved equal.
CONSTRUCTION
AGENCY
SIM D. Copper Tube with Flare Joints: liquid line size outside diameter and vapor line
9-20-17
DATE: outside diameter tube as per model; ASTM B280, type ACR, hard or annealed
OPERATIONS temper seamless copper tube, sealed ends, refrigeration tube, dehydrated, scale
ASB ad dirt free and sizes as shown on the drawing. Manufacturer Reference –
DATE:
9-25-17 Cambridge-Lee Industries Incorporated of approved equal.
CONTROL NUMBER
VERIFICATION

E. Refrigerant Pipe Cladding: 0.016” thick; sheet metal aluminum; GR Alloy 3003,
EDSD

ASTM B209; non-heat treatable; moderate strength and high corrosion resistant;
riveted and sealed water tight. Elbows shall be mitered.
DATE:
BY:
REVISIONCERTIFICATION

2.03 ACCESSORIES
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

A. Neoprene Isolators: Provide molded neoprene isolators having steel base plates
(DCC) NO. _____________________

with mounting holes and, at the top, steel mounting plates with mounting holes or
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 50
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
threaded inserts. Neoprene elements shall be designed for operating on a
straight line deflection curve and loaded so that deflection does not exceed l5
percent of the free height of the elements. Elements shall be type and size
ENGG CERT

coded with molded letters or numbers or color coded for capacity identification.
Metal parts of neoprene elements shall be completely embedded in neoprene.

B. Flexible duct connector: Ventglass, glass fabric, double-coated with DuPont’s


neoprene (polychloroprene), air-tight, water-tight, and fire retardant, ANSI/NFPA
701. Manufacturer Reference – Ventfabricss Inc. or approved equal.

C. Anti-Vibration Pad: Elastomeric, cross-ribbed design, ½ in, cork center, standard


size, 50 lb./sq. in. maximum loading capacity. Manufacturer Reference- Mason
DESCRIPTION

Industries Inc. or approved equal.

2.04 CONDSENSATE DRAIN LINE

A. PVC, rigid, ASTM D-1785, schedule 40, plain ends, 60°C maximum
temperature 20 feet joints. Fittings: PVC, ASTM D-2467/pattern for solvent
cement joints, socket to male thread, 60°C maximum service temperature.
Solvent Cement: PVC to PVC pipe and fitting joints- ASTM D-2564, ABS to
ABS-D2235, ABS to PVC-D3138.
JO/EWO

2.05 RECOMMENDED VENDOR(S) / SUPPLIER(S)


DATE

A. Saudi Aircon
P.O. Box 1658 , Al-Ahsa 31982, K.S.A
NO.
REV

Tel. No. : 03 / 8871100


DISCIPLINE
ENGINEER
Fax No. : 03 / 8823426
BOS E-Mail: [email protected]
DATE: 8-23-17
PROJECT
ENGINEER B. Saudi Arabian Air Conditioning Company
AFB Tel. No. 857-7710
DATE:
8-24-17 Fax No. : 857-8834
CERTIFIED
00-00-16
HAK
C. Zamil Air Conditioners
8-24-17
DATE: Contact Person: Nizar Al Shakhouri
CONSTRUCTION
AGENCY Tel. No. (013) 847-3333 ext. 259
SIM Fax No. (013) 847-2602
9-20-17
DATE: E-mail: [email protected]
OPERATIONS

ASB D. PETRA
DATE:
9-25-17 Contact Person: Hussam Qattash
CONTROL NUMBER

P.O. Box 25931, Riyadh 11476, KSA


VERIFICATION

Tel. No.: (1) 473-8383


EDSD

Fax No.: (1) 473-8282


E-mail: [email protected]
DATE:
BY:
REVISIONCERTIFICATION

E. Honeywell Turki Arabia Ltd


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

Tel. No.: 834-2442


Fax No.: 834-2828
(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 51
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
PART 3 – EXECUTION

3.01 INSPECTION
ENGG CERT

A. The unit shall have factory installed internal piping and wiring; refrigerant circuit
tested, dehydrated, sealed and shipped with holding charge of refrigerant.

B. At the worksite, the CONTRACTOR shall remove any shipment fixtures of


corrosion protection if so required in accordance with manufacturer’s instructions.

C. The CONTRACTOR shall check the air conditioning unit for damage and/or
wrapping which may have occurred during transit.
DESCRIPTION

D. Equipment and materials supplied primed or painted shall be scrutinized by the


CONTRACTOR to establish what further work will be necessary to fully protect
and finish the surfaces in accordance with the paint specification. A guide to
compatibility between coatings supplied by other and those which shall be
applied by the CONTRACTOR is given in SAES-H-001 para. 5.3.10.

E. Should the equipment or materials be delivered with unsuitable primer or paint


the unsuitable primer or paint shall be removed and the proper surface
JO/EWO

preparation re-established by the CONTRACTOR.

3.02 INSTALLATION
DATE

A. Equipment shall be installed, tested and commissioned in accordance with the


NO.
REV

relevant drawings, project scope of work, construction specifications and


DISCIPLINE
ENGINEER
manufacturer instructions to insure proper sequential operation of the unit and its
BOS control.
DATE: 8-23-17
PROJECT
ENGINEER B. Equipment performance shall be verified by the CONTRACTOR in the presence
AFB of the SAUDI ARAMCO Representative. Any equipment fault corrections or final
DATE:
8-24-17 adjustment shall be carried out by the CONTRACTOR.
CERTIFIED
00-00-16
HAK
8-24-17
DATE:
- END OF SECTION 15781 – AIR CONDITIONING UNIT -
CONSTRUCTION
AGENCY
SIM
9-20-17
DATE:
OPERATIONS

ASB
DATE:
9-25-17
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 52
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

DIVISION 15 – MECHANICAL
ENGG CERT

SECTION 15870 – EXHAUST FANS

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. Exhaust Fans

1.02 RELATED SECTION


DESCRIPTION

A. Section 15891 – Metal Ductwork and Accessories

B. Section 15990 – Testing and Adjusting and Balancing

1.03 QUALITY ASSURANCE

A. SAUDI ARAMCO STANDARDS


JO/EWO

SAUDI ARAMCO Material Systems


SAMSS
Specifications
DATE

SAES-K-001 Heating, Ventilation and Air Conditioning (HVAC)


NO.
REV

SAES-K-100 SAUDI ARAMCO Mechanical (HVAC) Code


DISCIPLINE
ENGINEER
BOS SAES-N-001 Basic Criteria, Industrial Insulation
DATE: 8-23-17
PROJECT
ENGINEER SAES- M-100 Saudi Aramco Building Code
AFB
DATE:
8-24-17
CERTIFIED
00-00-16
HAK
B. INDUSTRY CODES AND STANDARD ORGANIZATIONS;
DATE:
8-24-17
CONSTRUCTION
AGENCY
SIM
9-20-17 Laboratory Methods of Testing Fans for Certified
DATE: AMCA 210-16
OPERATIONS
Aerodynamic Performance Rating
ASB Reverberant Room Methods for Sound Testing of
AMCA 300-14
DATE:
9-25-17 Fans.
AMCA 99- 16 Standards Handbook
CONTROL NUMBER
VERIFICATION
EDSD

ASHRAE STD 62.1-16 Ventilation for Acceptable Indoor Air Quality


DATE:

HVAC Applications, Systems and Equipment,


BY:

ASHRAE Handbooks
Fundamentals and Refrigeration
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

ASME PTC 11-08 Test Code for Fans


00

(DCC) NO. _____________________

Installation of Air Conditioning and Ventilating


NFPA 90A-15
17U092-092

Systems
SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 53
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
Standard for Ventilation Control and Fire
NFPA 96-17
Protection of Commercial Cooking Operations
ENGG CERT

NFPA 101-15 Life Safety Code


NFPA 1 -15 Fire Code
NFPA 70-17 National Electric Code

SMACNA -02 HVAC Systems-Testing, Adjusting and Balancing


Power Roof Ventilators for Restaurant Exhaust
UL 762-13
Appliances
DESCRIPTION

UL 705-04 UL Standard for Safety Power Ventilators

C. Conduct factory tests to determine capacity, efficiency and brake horsepower at


design conditions, and at other conditions to establish performance curves.

D. Seals: All fans must bear the AMCA certified rating seal.

E. Equipment Number: Stamp equipment number on Manufacturer's standard,


JO/EWO

permanent nameplate attached to fan.

1.04 SUBMITTALS
DATE

A. Test Reports: Submit 4 sets of data showing test reading and calculated results
of factory tests of fans. The data shall include:
NO.
REV

DISCIPLINE
ENGINEER
BOS 1. Description of Fan and Drive - (Make - size - type - arrangement).
DATE: 8-23-17
PROJECT 2. Motor nameplate data - (Volts - phase - Hertz - FLA - LRA - synchronous
ENGINEER
AFB
and full load speeds).
DATE:
8-24-17
CERTIFIED 3. Calculated results - m3/hr. (CMH) head pressures, efficiency at design
00-00-16
HAK conditions.
DATE:
8-24-17
CONSTRUCTION
AGENCY
B. Shop Drawings
SIM
DATE:
9-20-17 1. Submit shop drawings showing fan layout, housing, materials, gauges,
OPERATIONS dimensions, weights and installation details.
ASB
DATE:
9-25-17 2. Product Data
CONTROL NUMBER
VERIFICATION

a. Manufacturer’s fan performance (data includes CFM, RPM, BHP,


EDSD

motor nameplate data, tip speed, outlet velocity and static


pressure) and sound performance (data includes sound power
DATE:
BY:

level ratings by octave bands) as tested in accordance with AMCA


REVISIONCERTIFICATION

standards 210 and 300.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

3. Fan Performance Curves


(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 54
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
a. Submit curves for all fans with system performance shown, and for
plus or minus 10 percent and plus or minus 20 percent change in
fan rpm. Curves shall include plotted rpm, horsepower, cfm, static
ENGG CERT

pressure, and fan surge line and operating point.

4. Certified AMCA Ratings

a. Submit ratings for air and sound performance.

5. UL Listing

a. Submit listing as specified UL762 and UL705.


DESCRIPTION

6. Operation and Maintenance Manuals

a. Submit manuals.

7. Complete parts list for each piece of equipment provided.

1.05 PRODUCT HANDLING


JO/EWO

A. Product delivery, handling and storage shall be in accordance with Section


15050 Para. 1.04.
DATE

PART 2 - PRODUCTS
NO.
REV

DISCIPLINE 2.01 EQUIPMENT


ENGINEER
BOS
DATE: 8-23-17 A. Exhaust Fans
PROJECT
ENGINEER
AFB 1. Exhaust Fan #1 # 2 and # 3: Model 688EX with backdraft damper,
DATE:
8-24-17 centrifugal, Ceiling -mounted direct drive type, 50 CFM (Total Capacity),
CERTIFIED
00-00-16
0.1 inch of water (Static Pressure, (0.7Watts; 230VAC/1Ph/60Hz.
HAK
Manufacturer Reference– BROAN or approved equal.
DATE:
8-24-17
CONSTRUCTION
AGENCY 2. Range Hood: Max. extraction rate of 280 CFM, exhaust outlet connects 3-
SIM 1/4” x 10” rectangular duct, painted white with vent top or rear includes
9-20-17
DATE: rectangular damper, removable grease filter, cooktop light max of
OPERATIONS 60Watts 230V,Single Phase and 3 speed variable controller. Model
ASB JV347IFWW GE Deluxe range hood. Manufacturer Reference GE
DATE:
9-25-17 Appliances or approved equal.
CONTROL NUMBER
VERIFICATION

B. Warranty
EDSD

1. The manufacturer shall warrant the equipment to be free from defects in


DATE:
BY:

material and workmanship for a period of one (1) year from the purchase
REVISIONCERTIFICATION

date. Any units or parts which prove defective during the warranty period
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

will be replaced free of charge.


(DCC) NO. _____________________

2. The motor manufacturer shall warrant motors for a period of one (1) year.
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 55
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
Should motors prove defective during this period, they should be
replaced.
ENGG CERT

2.02 RECOMMENDED VENDOR(S) / SUPPLIER(S)

A. Saudi Electric Supply Co. (SESCO)


P.O. Box 3298, Al Khobar 31952, KSA
Tel No. 882-6739 / 882-5669
Fax No. 882-5768
E-mail: [email protected]

B. Al-Saadeh Trading Establishment


DESCRIPTION

Contact Person: Adel Tajaddeen


Tel. No. : 867-4958 / 867-2462
Fax No. : 867-5130
Email: [email protected]

2.03 IDENTIFICATION

A. Equipment Number
JO/EWO

1. Stamp equipment number of Manufacturer's standard, permanent


attached to nameplate fan.
B. Seals
DATE

1. All fans must bear the AMCA certified rating seal.


NO.
REV

DISCIPLINE PART 3 - EXECUTION


ENGINEER
BOS
DATE: 8-23-17 3.01 INSTALLATION
PROJECT
ENGINEER
AFB A. General
DATE:
8-24-17
CERTIFIED 1. The equipment shall be shipped as completely assembled as possible.
00-00-16
HAK
DATE:
8-24-17 2. Equipment shall be installed as shown on the drawings in accordance
CONSTRUCTION
AGENCY
with the manufacturer's recommendations and compliance to paragraph
SIM 1.03 stated above.
9-20-17
DATE:
OPERATIONS 3. Upon completion of installation of exhaust system conduct testing,
ASB adjusting, balancing and commissioning of the exhaust system as per
DATE:
9-25-17 Section 15990.
CONTROL NUMBER
VERIFICATION
EDSD

- END OF SECTION 15870 – EXHAUST FANS -


DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 56
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

DIVISION 16 - ELECTRICAL
ENGG CERT

SECTION 16010 - BASIC ELECTRICAL REQUIREMENTS

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. General Provisions
DESCRIPTION

1. Electrical Services

2. Distribution Equipment.

3. Raceways

4. Cabinets and Boxes.

5. Conductors/Wires/Cables.
JO/EWO

6. Conduits.
DATE

7. Grounding.
NO.
REV

8. Wiring Devices.
DISCIPLINE
ENGINEER
BOS 9. Indoor Lighting System.
DATE: 8-23-17
PROJECT
ENGINEER 10. Self-Contained Smoke & CO Alarm
AFB
DATE:
8-24-17 1.02 REFERENCES
CERTIFIED
00-00-16
HAK
A. SAUDI ARAMCO STANDARDS
DATE:
8-24-17
CONSTRUCTION
AGENCY SAES SAUDI ARAMCO Engineering Standards
SIM
9-20-17
DATE: a. SAES-P-123 Lighting
OPERATIONS

ASB b. SAES-P-104 Wiring Methods and Materials


DATE:
9-25-17
CONTROL NUMBER

c. SAES-P-111 Grounding
VERIFICATION
EDSD

B. CODES AND INDUSTRY STANDARDS


DATE:
BY:

SBC 401 SAUDI Building Code


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

NEMA National Electrical Manufacturers Association.


(DCC) NO. _____________________

NFPA National Fire Protection Association.


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 57
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

ANSI American National Standard Institute.


ENGG CERT

UL Underwriters Laboratories.

IEEE Institute of Electrical & Electronics Engineers.

OSHA Occupational Safety and Health Act.

SAMSS SAUDI ARAMCO Material System Specification

MSAER Mandatory SAUDI ARAMCO Engineering Requirement


DESCRIPTION

IESNA Illuminating Engineering Society of North America

NETA InterNational Electrical Testing Association

BS7671-11 Requirement for electrical installation

IEC International Electrotechnical commission


JO/EWO

a. IEC 60364-15 Low voltage electrical installation

G.I. General instructions


DATE

b. G.I. 7.21 Arc Flash Hazard Mitigation


NO.
REV

DISCIPLINE
ENGINEER
1.03 DESCRIPTION OF SYSTEM
BOS
DATE: 8-23-17 A. Primary Power is 13.8 kV, 3Phase, 4wires, 60 Hz.
PROJECT
ENGINEER
AFB B. Secondary Power is 400Y/230V, 3Phase, 4wires, 60 Hz.
DATE:
8-24-17
CERTIFIED
00-00-16
C. Power for Three Phase motors is 400/230V, 60Hz or as shown on the drawings.
HAK
8-24-17
DATE: D. Power for equipment:
CONSTRUCTION
AGENCY
SIM 1. 230V, Single Phase, 60Hz
9-20-17
DATE:
OPERATIONS
2. 400V, 3Phase, 60Hz
ASB
DATE:
9-25-17 E. Indoor Lighting, 230V, unless otherwise shown on the drawings.
CONTROL NUMBER
VERIFICATION

1.04 DRAWINGS
EDSD

A. The drawings show the location and general arrangement of all electrical work
DATE:
BY:

and shall be followed as closely as actual building construction and work of other
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

trades will permit.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

B. The CONTRACTOR shall examine the drawings of other trades and shall verify
the conditions governing his work at the job site. He shall arrange his work
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 58
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
accordingly. No changes shall be made without the prior written approval of the
SAUDI ARAMCO Representative.
ENGG CERT

C. Verify the dimensions governing this work at the building site. No extra
compensation will be claimed or allowed on account of differences between
actual dimensions and those indicated on the drawings. Examine adjoining work,
on which this work is dependent for perfect efficiency and report any work which
must be corrected. No waiver of responsibility for defective work shall be claimed
or allowed due to the failure to report unfavorable conditions affecting this work.
Generally, the Architectural drawings take precedence in all matters pertaining to
electrical trades’ installation; however, all conflicts shall be reported to the SAUDI
ARAMCO Representative for review.
DESCRIPTION

D. Before any work is installed and before any equipment is fabricated or


purchased, the CONTRACTOR shall carefully check the general drawings, and
all other mechanical and electrical drawings, and all job conditions and any lack
of coordination between the work and the drawings or job conditions shall be
immediately reported to the SAUDI ARAMCO Representative in writing.

1.05 INSPECTION OF SITE


JO/EWO

A. The CONTRACTOR shall visit the site, examine and verify the conditions under
which his work must be conducted before submitting a proposal.
DATE

B. The submitting of a proposal implies that the CONTRACTOR has visited the site
and is conversant with the conditions under which his work must be conducted.
NO.
REV

DISCIPLINE
ENGINEER
C. The CONTRACTOR shall adequately protect and preserve all newly installed
BOS work.
DATE: 8-23-17
PROJECT
ENGINEER D. The Electrical CONTRACTOR shall consult with the SAUDI ARAMCO
AFB Representative as to the methods of carrying on the work so as not to interfere
DATE:
8-24-17 with any operations more than necessary; accordingly, all services lines shall be
CERTIFIED
00-00-16
kept in operation as directed and the services shall be interrupted or
HAK
disconnected at such times as will be designated by the SAUDI ARAMCO
8-24-17
DATE: Representative.
CONSTRUCTION
AGENCY
SIM E. The CONTRACTOR shall take all necessary precautions to protect the
9-20-17 equipment and personnel from damage or injury due to his carrying on of the
DATE:
OPERATIONS work and the area in which the CONTRACTOR is working must be kept as clean
ASB as possible at all times, with only a minimum amount of construction material at
DATE:
9-25-17 the site at one time.
CONTROL NUMBER
VERIFICATION

F. Materials and equipment must be placed to avoid interference with SAUDI


EDSD

ARAMCO Operations and shall be removed or relocated when so required as


directed by the SAUDI ARAMCO Representative.
DATE:
BY:
REVISIONCERTIFICATION

1.06 EXISTING SITE CONDITIONS


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

A. Carefully examine the drawings and specifications, visit the site of the work, and
(DCC) NO. _____________________

be fully informed as to all existing conditions, dimensions and limitations before


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 59
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
starting the work.

B. Notify all corporations, companies, individuals or local authorities owning, or


ENGG CERT

having jurisdiction over conduits, wires, pipes or other equipment, which are not
needed or which interfere in any manner with the execution of this work and
remove or protect such utilities or equipment as required by the parties having
jurisdiction over same.

C. If existing active or non-active services (which are not shown on plans) are
encountered that require location or disconnecting, provide proper handling of
these services, and do not proceed with the work until so authorized by the
SAUDI ARAMCO Representative.
DESCRIPTION

1.07 CUTTING AND REPAIRING

A. Work shall be laid out in advance of building construction to permit building in


electrical work and equipment, etc., so as to eliminate unnecessary cutting or
welding to structural member. Before any cutting or drilling of holes is attempted,
notify the SAUDI ARAMCO Representative for approval.

B. Fire rated walls, when cut or penetrated by conduits/raceways/cable tray shall be


JO/EWO

enclosed with fire restrained materials adequate to restore the fire rating of the
wall.
DATE

1.08 SHOP DRAWINGS


NO.
REV

A. Shop Drawings shall serve to check the Electrical CONTRACTOR's interpretation


DISCIPLINE of the design drawings and specifications, and for correlation and coordination of
ENGINEER
BOS the various trades, and shall be used by the Electrical CONTRACTOR as
DATE: 8-23-17
installation instructions. Electrical CONTRACTOR to make sure that the physical
PROJECT
ENGINEER
dimensions of the equipment fit into the space available shown on the drawings.
AFB
8-24-17 B. Refer to General and Supplementary Conditions of the Contract for shop drawing
DATE:
CERTIFIED procedures.
00-00-16
HAK
DATE:
8-24-17 C. All Manufacturer's Drawings, catalog cuts and specifications shall be properly
CONSTRUCTION
AGENCY
identified with the SAUDI ARAMCO project number and title. Each piece of
SIM equipment shall be properly identified as to its location and equipment number.
9-20-17
DATE:
OPERATIONS D. SUBMIT SHOP DRAWINGS, CADD generated in Intergraph compatible format,
ASB on the following equipment with all shop drawings submitted at one time to the
DATE:
9-25-17 SAUDI ARAMCO Representative - no consideration shall be given to partial lists
submitted from time to time.
CONTROL NUMBER
VERIFICATION
EDSD

1. Distribution Panels.
DATE:
BY:

2. Lighting and Socket outlet Panels


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

3. Disconnecting Switches
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

4. Lighting Switches
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 60
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

5. Outlets – Power
ENGG CERT

6. Raceways, Fittings & Termination

7. Lighting Fixtures

8. Fire Detection Devices

9. Wires/Cables

10. Molded case circuit breaker


DESCRIPTION

11. Safety disconnect switches

12. Floor and Wall Conduit Entrances Seals including Fire Stop Materials.

13. Grounding

1.09 EQUIPMENT IDENTIFICATION


JO/EWO

A. Equipment identification covers the furnishing and installing of nameplates and


labels as specified in Section 16195 and as shown on the Drawings. The
nameplate shall identify the equipment's purpose, drawing identification number,
DATE

and the equipment's feeder name and location and any special operational
notes, such as voltage, number of wires, phase etc.
NO.
REV

DISCIPLINE
ENGINEER
B. Nameplates shall be engraved laminated phenolic plastic with black letters on
BOS white background, unless specified to the contrary. The size of the nameplates
DATE: 8-23-17 shall be compatible with the application but not less than 1/4" letters.
PROJECT
ENGINEER Nameplates shall be attached by pop rivets or screws. When screws are used,
AFB length will be considered to ensure required spacing away from energized parts.
DATE:
8-24-17
CERTIFIED
00-00-16
C. Equipment identification shall be visible after installation without the need for
HAK
disturbing or being exposed to the interior parts or wiring. Titles and method
8-24-17
DATE: shall conform to equipment identification, as shown on the Drawings.
CONSTRUCTION
AGENCY
SIM D. Equipment identification nameplate titles and methods shall be submitted as
9-20-17
DATE: shop drawings for approval.
OPERATIONS

ASB E. Special tools required for any electrical equipment shall be clearly identified with
DATE:
9-25-17 that equipment.
CONTROL NUMBER
VERIFICATION

1.10 WORK IN COOPERATION WITH OTHER TRADES


EDSD

A. Determine the work to be performed by all other trades throughout the Contract
DATE:
BY:

to facilitate the electrical installation. Provide the type and amount of electrical
REVISIONCERTIFICATION

materials and equipment necessary to place this work in proper operation,


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

completely wired, tested, and ready for use. This shall include all conduits, wires,
motor starters, disconnects, relays, and all other devices for the required
(DCC) NO. _____________________

operation and control sequences of all electrical, mechanical, and other systems
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 61
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
or equipment. In mechanical room, ductwork has precedence over all electrical
work. A minimum of one meter dead front shall be required for all electrical
devices.
ENGG CERT

B. Provide conduits and wires for all controls and other devices, for both high and
low voltage, described in this and other parts of the Construction Specification.
Install all control housing and junction boxes required for installing conduits and
wires to the controls except for controls such as solenoid valves, pressure
switches, damper motors, and other items which are to be installed in piping,
ducts, machinery, or other equipment supplied and fitted by others. Items shall
be installed by skilled workmen, thoroughly trained in the necessary crafts and
experienced in the work.
DESCRIPTION

C. Install control wiring in separate conduit between all heating, ventilating and air
conditioning sensing devices, control panels, and motor controls. Before
installing any conduit for heating, ventilating, and air conditioning control wiring,
verify from the control manufacturer's shop drawings where these separate
conduit runs are required and determine exact termination points for the specific
items to be wired, including but not limited to the following:

1. Line side conduit, wiring and connections to the "package unit" or


JO/EWO

“package system" disconnect or motor starter.

2. Conduit, wiring and connections to time, temperature, flow, pressure and


DATE

other controls remote from the “package unit" or "package system".


NO.
REV

D. A "package system" is defined as any combination of equipment with all local and
DISCIPLINE
ENGINEER
remote instruments and controls required to perform a specialized function. In all
BOS "package systems" the responsibility for the electrical work shall remain with the
DATE: 8-23-17 "system" installer but the electrical work performed shall comply with the
PROJECT
ENGINEER provisions of Division 16. Work under this Division shall include bringing
AFB power to the main switch or panel of the "package system" at voltages available
DATE:
8-24-17 on site (see Item 1.04). Where other voltages or D.C are required, the
CERTIFIED
00-00-16
transformation or rectification of current shall be provided with the "package
HAK
system".
DATE:
8-24-17
CONSTRUCTION
AGENCY E. Install and connect all room thermostats, as required for the AC system
SIM
9-20-17
DATE: F. Install and connect all fan shutdown circuits as required for the fire alarm system.
OPERATIONS

ASB 1.11 TEMPORARY LIGHT AND POWER


DATE:
9-25-17
CONTROL NUMBER

A. All temporary lighting and power facilities shall be in accordance with the
VERIFICATION

TEMPORARY FACILITIES Section of Division 1. The system shall be properly


EDSD

grounded. CONTRACTOR shall maintain the system in a safe condition at all


times.
DATE:
BY:
REVISIONCERTIFICATION

B. All wiring shall be removed immediately upon completion of construction or


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

purpose for which the wiring was installed. All circuits shall originate in an
approved power outlet or panel board. All cables shall be listed for hard or extra
(DCC) NO. _____________________

hard usage. No open-wiring conductors shall be laid on the floor or ground.


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 62
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

1.12 BASIC MATERIALS AND METHODS


ENGG CERT

A. In all instances where drawings or specifications indicate materials or methods of


higher quality than the minimum required by the referenced codes, the drawings
and specifications shall govern.

B. All electrical equipment shall be UL/TUV/ENEC/BSI listed.

1.13 MOUNTING HEIGHTS

A. In general, mounting heights above finished floor to the centerline of outlet boxes
DESCRIPTION

and equipment shall be as follows unless otherwise indicated on the drawings or


to comply with special conditions.

1. Toggle Switches - General 1.22 M AFF

2. Receptacles - General Use 0.45 M AFF

3. Push Buttons/Control Stations 1.22 M AFF


JO/EWO

4. Disconnect Switches 1.37 M AFF

5. Motor Starters 1.37 M AFF


DATE

6. Panels and Cabinets 1.8 M AFF from top


NO.
REV

DISCIPLINE 7. Exit Lights - Wall Mtd. Types 0.3 M above door


ENGINEER
BOS
DATE: 8-23-17
B. Where Electrical Devices with different Mounting heights are located in the same
PROJECT areas - Align devices vertically thru the "centerline" of the devices.
ENGINEER
AFB
8-24-17 1.14 CONDITIONS OF COMPLETION
DATE:
CERTIFIED
00-00-16
HAK A. CONTRACTOR shall turn over to the SAUDI ARAMCO Representative the
DATE:
8-24-17 following items:
CONSTRUCTION
AGENCY
SIM 1. Receipt signed by the SAUDI ARAMCO Representative for all panel and
DATE:
9-20-17 cabinet keys, spare fuses, operating instructions and maintenance
OPERATIONS instructions.
ASB
9-25-17 2. A certificate of final inspection indicating approval by the SAUDI
DATE:
ARAMCO
CONTROL NUMBER
VERIFICATION
EDSD

1.15 MANUFACTURER'S DIRECTIONS:


DATE:

A. Install all equipment in strict accordance with all directions and recommendations
BY:

furnished by the manufacturer. Where such directions are in conflict with the
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

plans and specifications, report such conflicts to the SAUDI ARAMCO


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

Representative who shall determine the method or design criteria under which
(DCC) NO. _____________________

the work will be completed.


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 63
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

PART 2 - PRODUCTS
ENGG CERT

2.01 All products will comply as required by the SAUDI ARAMCO Material Specification
System (SAMSS).

PART 3 - EXECUTION

3.01 Electrical equipment shall be installed in a neat and workmanlike manner. Unused
openings in boxes, raceways, auxiliary gutters, cabinets, equipment case or housing
shall be effectively closed to afford proper protection, equivalent to the enclosure of the
DESCRIPTION

equipment. Conductors and conduits shall be racked to provide ready and safe
access at all openings into which persons enter for installation and maintenance with a
minimum 1M dead front distance in front of these openings and devices.

- END OF SECTION 16010 - BASIC ELECTRICAL REQUIREMENTS-


NO. JO/EWO
DATE
REV

DISCIPLINE
ENGINEER
BOS
DATE: 8-23-17
PROJECT
ENGINEER
AFB
DATE:
8-24-17
CERTIFIED
00-00-16
HAK
DATE:
8-24-17
CONSTRUCTION
AGENCY
SIM
9-20-17
DATE:
OPERATIONS

ASB
DATE:
9-25-17
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 64
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

DIVISION 16 - ELECTRICAL
ENGG CERT

SECTION 16111 – RACEWAYS

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. Conduits, conduit fittings & raceways


DESCRIPTION

B. Conduit support

1.02 REFERENCES

A. SAUDI ARAMCO STANDARDS

SAES SAUDI ARAMCO Engineering Standards

a. SAES-B-008 Restrictions to Use of Cellars, Pits and Trenches


JO/EWO

b. SAES-B-068 Electrical Area Classification


DATE

c. SAES-P-100 Basic Power System Design Criteria


NO.
REV

d. SAES-P-104 Wiring Methods and Materials


DISCIPLINE
ENGINEER
BOS e. SAES-P-111 Grounding
DATE: 8-23-17
PROJECT
ENGINEER f. SAES-H-101 Approved Protective Coating Systems for Industrial
AFB Plants & Equipment
DATE:
8-24-17
CERTIFIED
00-00-16
B. CODES AND INDUSTRY STANDARDS
HAK
8-24-17
DATE: SBC 401 SAUDI Building Code
CONSTRUCTION
AGENCY
SIM NEMA C80.1-15 Electrical Rigid Steel Conduits.
9-20-17
DATE:
OPERATIONS NEMA C 80.3-15 Electrical Metallic Tubing -- Steel (EMT)
ASB
DATE:
9-25-17 NEMA FB1-14 Fittings, Cast metal Boxes & Conduit bodies for
CONTROL NUMBER

Conduits, Metallic Tubing and Cable


VERIFICATION
EDSD

NEMA RN 1-13 Polyvinyl-Chloride (PVC) External Coated Galvanized


Rigid Steel Conduit and Intermediate metal Conduit
DATE:
BY:
REVISIONCERTIFICATION

NEMA TC6 & 8-13 Extra-Strength PVC Plastic Utilities Duct for
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

Underground Installation
(DCC) NO. _____________________

NEMA TC 9-12 Fittings for polyvinyl Chloride (PVC) Plastic


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 65
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
Utilities Duct for Underground installation

NEMA VE 1- 09 Metal Cable tray Systems


ENGG CERT

NFPA70-17 National Fire Protection Association

a. NFPA70 Chapter 9 Table 2: Radius of Conduit & Tubing Bends

b. NFPA70 Table 344.30 (B) (2): Support for Rigid Metal Conduit

ASTM A123-15 Standard Specification for Zinc Coatings on Iron


and steel products
DESCRIPTION

ANSI American National Standards Institute

UL Underwriters Laboratories

IEEE Institute of Electrical & Electronics Engineers

OSHA Occupational Safety and Health Act


JO/EWO

SAMSS SAUDI ARAMCO Material System Specification

IEC 60364-15 Low voltage electrical installation


DATE

BS7671-11 Requirement for electrical installation


NO.
REV

DISCIPLINE
ENGINEER
1.03 SUBMITTALS
BOS
DATE: 8-23-17 A. Before starting any installation of any materials or equipment, submit for approval
PROJECT
ENGINEER a complete list incorporated in the work. This list shall include catalog numbers;
AFB cuts, data sheets, and such other descriptive information as may be required.
DATE:
8-24-17
CERTIFIED
00-00-16
No consideration shall be given in partial list submitted. Approval of materials will
HAK
be based on manufacturer's published data, installation and roughing-in data
8-24-17
DATE: sheets and drawings indicating compliance with the Contract documents.
CONSTRUCTION
AGENCY
SIM B. All metric substitutes for Schedule 40 and 80 conduit and fittings shall be
9-20-17
DATE: submitted for approval.
OPERATIONS

ASB C. Listed/ Mark and labelled Compliance: Provide and comply Raceway and
DATE:
9-25-17 components which are UL/TUV/ENEC/BSI/ KEMA/KEUR-listed and labeled or
CONTROL NUMBER

approved equal.
VERIFICATION
EDSD

1.04 DELIVERY STORAGE AND HANDLING


DATE:
BY:

A. Protect all materials and equipment from damage or corrosion during handling
REVISIONCERTIFICATION

and storage. Refer to specification Section 16010 - "Basic Electrical


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

Requirements" for complete work scope. Provide appropriate covering for all
stored materials.
(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 66
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
1.05 TESTING

A. Before shipment, materials shall be inspected to insure proper operation and


ENGG CERT

conformance with manufacturer's published specifications. Notification of


completion of testing shall be sent to SAUDI ARAMCO Representative.

PART 2 – PRODUCTS

2.01 MANUFACTURER

A. Manufacturers: Subject to compliance with requirements, provide products from


DESCRIPTION

the following:

1. Conduit Bodies:
Appleton Electric Co. (NA 6106-01)
EGS-OZ Gedney/EGS Electrical Group (NN 1440-06)
Crouse-Hinds Divisions/Cooper Indust. (NC 6828-03)
ASCO (Japan) Co. Ltd. (TA 5505-01)
Saudi Conduit & Cabling Co. DS 3800-01)
Zamil Indust. Coatings (ZINCDO) (DZ6377-05)
JO/EWO

Other Approved Manufacturers

2. P-W Industries, Inc.


DATE

Square D Co.
Saudi Electric Industries Co; Ltd. (SEICO)
NO.
REV

WESCOSA
DISCIPLINE
ENGINEER
Other Approved Manufacturers
BOS
DATE: 8-23-17 2.02 CONDUITS
PROJECT
ENGINEER
AFB A. Galvanized Rigid Steel Conduit/ Electrical Metallic Tubing
DATE:
8-24-17
CERTIFIED
00-00-16
1. Shall be hot-dipped galvanized threads and their fittings, it can be installed at
HAK
exterior, interior area.
DATE:
8-24-17
CONSTRUCTION
AGENCY 2. Rigid Steel Conduit/Electrical Metallic Tubing: NEMA C80.1 and ASTM
SIM A123/A123M.
9-20-17
DATE:
OPERATIONS 3. Fittings and Conduit Bodies: NEMA FB 1; conduit fittings and supports shall
ASB be cast or forged steel, cast-iron or malleable iron, either hot-dipped
DATE:
9-25-17 galvanized (preferably) or zinc electroplated. No aluminum fittings shall be
CONTROL NUMBER

used.
VERIFICATION
EDSD

B. Electrical Metallic Tubing (EMT)


DATE:
BY:

1. Shall be zinc coated, electrically metallic tube and their fitting shall be
REVISIONCERTIFICATION

malleable iron or steel rain and concrete-tight as appropriate.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

C. PVC Coated Rigid Steel Conduit


(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 67
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
1. Manufacturers: Refer to SAUDI ARAMCO Approved Manufacturers list.

2. Description: NEMA RN 1; rigid steel conduit with external PVC coating, 0.1
ENGG CERT

mm (40 mil) thick.

3. Fittings and Conduit Bodies: NEMA FB 1; steel fittings with external PVC
coating, 0.1 mm (40 mil) thick, to match conduit.

4. All PVC-coated conduit and fittings shall be furnished from one manufacturer
for uniform appearance and interchangeability of parts.

5. This conduit is external covering or over-coated by PVC which can be also


DESCRIPTION

underground installed. The inner is hot-dipped galvanized malleable, irony or


zinc.

6. Only Strap Wrenches are allowed for installing PVC coated rigid steel
conduit.

D. Liquid Tight flexible metal conduit

1. Manufacturers : Refer to SAUDI ARAMCO Approved Manufacturers list.


JO/EWO

2. Description : Interlocked steel construction.


DATE

3. Fittings : NEMA FB 1.
NO.
REV

E. PVC Conduit
DISCIPLINE
ENGINEER
BOS 1. Description: NEMA TC 6 & 8; Suitable for direct burial (type DB) and 90
DATE: 8-23-17 degree C (194 degree F) cable operation.
PROJECT
ENGINEER
AFB 2. Fittings and Conduit Bodies: NEMA - TC 9.
DATE:
8-24-17
CERTIFIED
00-00-16
F. Conduit Support
HAK
8-24-17
DATE: 1. Steel channel
CONSTRUCTION
AGENCY
SIM 2. Steel spring clips
9-20-17
DATE:
OPERATIONS
3. Clamp with bolt and nut
ASB
DATE:
9-25-17 2.03 CONDUIT FITTINGS & ACCESSORIES
CONTROL NUMBER
VERIFICATION

A. Steel Fittings
EDSD

1. For rigid steel conduit provide zinc-coated, cast malleable, ferrous metal,
DATE:
BY:

threaded fittings. Application "Form 35 Unilets" or Crouse-hinds "Form 7


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

condulets". Provide a neoprene cover gasket on each fitting installed


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

outdoors. All steel fittings shall be hot-dipped galvanized with hot-dipped


(DCC) NO. _____________________

galvanized threads.
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 68
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
B. EMT Fittings

1. 19mm (¾") through 51 mm (2") shall be compression type. EMT fittings shall
ENGG CERT

be malleable iron or steel rain & concrete-tight as appropriate.

C. Grounding Bushing

1. Provide Appleton Type "GIB" Grouse-Hinds Type "GB" or Thomas & Betts
3800 series threaded, grounding type insulated, metallic bushing, in
combination with one exterior and one interior locknut, on each rigid conduit
terminating in sheet metal box, cabinet, trough, gutter or wireway.
DESCRIPTION

D. Expansion Fittings

1. Provide O.Z. Type “AX” or “EX” expansion fitting with bonding jumper in each
exposed conduit crossing a building expansion joint. Provide O.Z. Type “DX”
at each concrete embedded run crossing a building expansion joint.

E. Hubs

1. Provide Appleton “HUB” or “HUB-U” Series or Thomas and Betts “370” series
JO/EWO

hub or equal, on each conduit terminating in a box or cabinet exposed to the


weather.
DATE

F. Unions
NO.
REV

1. Where conduit unions are necessary, provide Appleton Type “EC” or Thomas
DISCIPLINE
ENGINEER
and Betts “Erikson coupling” or equal.
BOS
DATE: 8-23-17 G. Conduit Seals (If detailed on Contract drawings)
PROJECT
ENGINEER
AFB 1. Manufacturers : Crouse-Hinds Type EYS or approved equal
DATE:
8-24-17
CERTIFIED
00-00-16
2. Classification : Explosion proof.
HAK
DATE:
8-24-17 3. Size : Wire fill of standard conduit sealing fittings shall not
CONSTRUCTION
AGENCY
exceed 25% based on the conduit size. Oversized
SIM sealing fittings with reducers may be used in order to
9-20-17 utilize the higher permissible wire fill of the conduit.
DATE:
OPERATIONS

ASB H. Conduit Sealing Compound (for Item ‘G’)


DATE:
9-25-17
1. Manufacturers : 3 M Type CP 25 N/S or CP 25 L Kit,
CONTROL NUMBER
VERIFICATION

3M Scotch cast Brand 4416 Kit


EDSD

Crouse-Hinds Type Chico (for explosion proof seals).


DATE:
BY:

Dow Corning Silicon Foam RTV 3-654B


REVISIONCERTIFICATION

or other SAUDI ARAMCO Approved Manufacturer.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

I. Cable Seals (if detailed on Contract drawings)


(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 69
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
The correct sealing material shall be used with the specified seals.

1. Manufacturers : Raychem Type T (CBK-T) Gas Blocking Kit or other


ENGG CERT

SAUDI ARAMCO Approved Manufacturer.


: Rox System Sealing Technology, Sweden.

PART 3- EXECUTION

3.01 COORDINATION

A. Determine the work to be performed by the building CONTRACTORS and other


DESCRIPTION

trades throughout. Provide the type and amount of materials and equipment
necessary to completely installed and ready for use.

3.02 INSTALLATION OF CONDUITS

A. Install conduit in accordance with SAUDI ARAMCO Engineering Standard SAES-


P-104, NFPA 70, Contract Drawings, NECA “Standard of Installation” and the
manufacturer’s instructions.
JO/EWO

B. Arrange supports to prevent misalignment during wiring installation.

C. Support conduit using galvanized iron, zinc plated steel or malleable iron straps,
DATE

lay-in adjustable hangers, clevis hangers, and split hangers. Group related
conduits by using conduit rack support. Construct rack using steel channel; and
NO.
REV

provide space on each for 25 percent additional conduits. Fasten conduit


DISCIPLINE supports to building structure or surfaces. Damaged PVC coat on conduit or any
ENGINEER
BOS exposed threads shall be coated with PVC patching compound, APCS-22, or
DATE: 8-23-17 APCS-26 B.
PROJECT
ENGINEER
AFB D. Do not permanently support conduit with wire or perforated pipe straps. Remove
8-24-17 wire used for temporary supports. Never attach conduit to support wires for a
DATE:
CERTIFIED false ceiling.
00-00-16
HAK
DATE:
8-24-17 E. Arrange conduit to maintain headroom and present a neat appearance.
CONSTRUCTION
AGENCY
SIM F. Route exposed conduit parallel and perpendicular to walls. Where conduit
DATE:
9-20-17 penetrates wall, fire-stopping measures shall be completed per Contract
OPERATIONS Drawings.
ASB
DATE:
9-25-17 G. Route conduit installed above accessible ceiling parallel and perpendicular to
walls. Install conduit seal in accordance with Contract Drawings.
CONTROL NUMBER
VERIFICATION
EDSD

H. Route conduit under slab directly from point to point.


DATE:
BY:

I. Maintain clearance between conduit and piping in accordance with SAUDI


REVISIONCERTIFICATION

ARAMCO Engineering Standards SAES-B-064, SAES-P-104 and SAES-J-902.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

J. Maintain 300mm (12 inch) clearance between conduit and surfaces with
(DCC) NO. _____________________

temperatures exceeding 104 degrees F (40 degrees C).


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 70
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

K. Cut metallic conduit square using saw or pipe-cutter, de-burrs cut ends. Threads
must be tapered in accordance with ANSI/ASMI B.1.20.1 and remaining threads
ENGG CERT

exposed after make-up shall be coated with rust preventing grease such as
Crouse Hinds thread lubricant (SAUDI ARAMCO Material Stock No. 14-839-050)
or approved equal.

L. Bring conduit to shoulder of fittings; fasten securely.

M. Join nonmetallic conduit using cement as recommended by manufacturer.


Coupling and connectors will be in accordance with NFPA 70-346-9 (A). Wipe
nonmetallic conduit dry and clean before joining. Apply full even coat of cement
DESCRIPTION

to entire area inserted in fitting. Allow joint to cure for 20 minutes, minimum.

N. Use conduit hubs with ground lugs to fasten metallic conduit to sheet metal
boxes in damp or wet locations.

O. Install no more than the equivalent of three 90-degree bends between boxes.
Sizes pull boxes per NFPA 70-370-6. Use conduit bodies to make sharp changes
in direction, as around beams. Use factory elbows or hydraulic one-shot bender
to fabricate bends in metal conduit. The minimum bending radius shall be in
JO/EWO

accordance with NFPA 70 -346-10. Factory elbows are preferred. Heating of


conduits for bending is not permitted. Oversized bending form to be used when
bending PVC Coated conduits. Only strap type wrench is to be used when
DATE

installing PVC coated conduits.


NO.
REV

P. Avoid moisture traps; provide junction box or conduit body with stainless steel
DISCIPLINE
ENGINEER
drain fitting at low points in conduit system. Install breathers at high points on
BOS conduit system. 5 mm hole acceptable in bottom of sheet metal boxes.
DATE: 8-23-17
PROJECT
ENGINEER Q. Provide suitable fittings to accommodate expansion and deflection where
AFB necessary.
DATE:
8-24-17
CERTIFIED
00-00-16
R. Expansion fittings shall be installed in each straight conduit run exceeding 45
HAK
meters (150 feet). When expansion fittings are installed, oversized conduit
8-24-17
DATE: clamps shall be used to allow the conduits to move.
CONSTRUCTION
AGENCY
SIM S. Provide suitable pull-wire or nylon rope of adequate strength in each conduit
9-20-17
DATE: except sleeves and nipples.
OPERATIONS

ASB T. All conduit systems shall be swabbed clean before installation of wires or cables.
DATE:
9-25-17 PVC conduits must be checked for internal clearance using mandrel or SAUDI
CONTROL NUMBER

ARAMCO Approved method. Mandrel shall be pulled in both directions. Failure to


VERIFICATION

freely pass the mandrel in either direction shall constitute the failure of the
EDSD

specific conduit section. The failed section shall be replaced.


DATE:
BY:

U. Use suitable caps to protect installed conduit against entrance of dirt and
REVISIONCERTIFICATION

moisture before the wires are pulled.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

V. Ground and bond metallic conduit as per typical detail/notes on standard


(DCC) NO. _____________________

installation drawings.
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 71
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

W. Identify conduit.
ENGG CERT

X. Explosion proof conduit seals shall be installed where applicable in classified


areas as required by NFPA 70 and SAES-B-068.

Y. Arc emitting devices contained within enclosure located in classified areas (Class
1, Division 1 and 2 shall be factory sealed, or conduit seal fittings shall be
installed within 450 mm (18") or such enclosures.

3.03 INSTALLATION OF JOINTS, FITTINGS AND BENDS


DESCRIPTION

A. Conduit fittings and supports shall be cast or forged steel, cast iron or malleable
iron, either hot-dip galvanized (preferably), or zinc electroplated as supplied by
the manufacturer. No aluminum fittings shall be used. Only malleable iron sealing
fittings shall be used. Gray cast iron split type (EYSR) retrofit sealing fittings may
be used if required for repair purposes.

B. Where conduit is underground, below ground slabs, exposed to weather, or in


wet locations, make sure joints are tight.
JO/EWO

C. Rigid conduit must be standard taper and lengths, threads shall be completely
covered by the couplings or fittings. Used proper tools in tightening threaded
connections.
DATE

D. Plastic Conduit (PVC): Use approved fittings, accessories and solvent-weld


NO.
REV

cement specifically manufactured for the purpose. Not to be used for power
DISCIPLINE
ENGINEER
distribution inside buildings.
BOS
DATE: 8-23-17 E. Locknuts & Bushings shall be put on threaded metal conduits end that penetrate
PROJECT
ENGINEER
in metal boxes, cabinets, equipment, etc., except cast thick-walled bodies and
AFB boxes equipped with threaded hubs.
DATE:
8-24-17
CERTIFIED F. Threaded conduit connections to outdoor, weatherproof boxes, cabinets, etc.,
00-00-16
HAK shall be made using watertight, insulated throat, conduit hubs, unless otherwise
DATE:
8-24-17 indicated.
CONSTRUCTION
AGENCY
SIM G. Electric metallic tubing (EMT) connections to boxes, cabinets, etc., shall be made
9-20-17 using watertight, steel on malleable iron, compression ring type conduit
DATE:
OPERATIONS connectors, complete with locknut and insulated bushing. Setscrew conduit
ASB connectors and couplings will not be permitted.
DATE:
9-25-17
H. Flexible metallic conduit and liquid tight conduit connections shall be made using
CONTROL NUMBER
VERIFICATION

insulated steel cast or malleable iron connectors with ridges that thread into the
EDSD

inside of the conduit. Binding-screw type connectors will not be permitted.


DATE:
BY:

I. Keep bends and offsets in conduit runs to an absolute minimum. For the serving
REVISIONCERTIFICATION

utilities, make large radius bends to meet their requirements. Replace deformed,
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

flattened, or kinked conduit. Not more than the equivalent of four quarter-bends
00

shall be used in any run between terminals and cabinets, or between outlet and
(DCC) NO. _____________________

junction or pull boxes.


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 72
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

J. Rigid steel conduit bends, 1-1/2 inch (40 mm) trade size or larger shall be
factory-made bends, or field bend with a power bender designed for the purpose,
ENGG CERT

utilizing bending shoes sized for the conduit used. All bends shall be free of
dents or flattening. Bending manually is not permitted.

K. Plastic conduit (PVC) bends shall be factory-made bends, or field bend using
approved heatbox bender and conduit mandrels to assure full inside diameter
and prevent deforming or discolor conduit.

L. All bends shall have a radius not less than that required by the NFPA 70 -
Chapter 9 Table 2.
DESCRIPTION

3.04 INSTALLATION OF CONDUITS STUB-UPS

A. Use rigid steel conduit and elbows from non-metallic conduits for stub-ups and
risers to grade unless otherwise shown. Approved adapter fittings from steel to
non-metallic conduits shall be used.

B. Lay-out stub-ups for connections to movable equipment or below movable


partitions with flush floor couplings. Use oil or grease on outside of coupling and
JO/EWO

in threads of sealing plugs to prevent sticking. For entries above grade, joint with
plugged couplings set flush with building exterior finish.
DATE

C. In electrical rooms, mechanical rooms, and other unfinished areas terminate


stub-up to a minimum of 6 inches (150 mm) above finished floor unless otherwise
NO.
REV

indicated, and cap-off to prevent ingress of dirt, etc.


DISCIPLINE
ENGINEER
BOS 3.05 INSTALLATION OF EMPTY CONDUITS
DATE: 8-23-17
PROJECT
ENGINEER
A. Provide a nylon "pull wire", polyethylene rope rated at 250 pounds (113 kg)
AFB tensile strength, or steel fish-wire in all empty conduits. Not less than 12 inches
DATE:
8-24-17 (30 cm) of slack shall be left at ends of pull wires.
CERTIFIED
00-00-16
HAK B. Tag empty conduit at each accessible end, identifying the purpose of the conduit
DATE:
8-24-17 and the location of the other end.
CONSTRUCTION
AGENCY
SIM C. In wet, corrosive, outdoor or underground locations use brass, bronze or copper
9-20-17 No. 16 gauge tags or lead tags secured to conduit ends with No. 16 or larger
DATE:
OPERATIONS galvanized wire. Clearly inscribe complete identifying information on the tags
ASB
with steel punch dies.
DATE:
9-25-17
D. Plug or cap all unused conduit openings with approved fittings designed for the
CONTROL NUMBER
VERIFICATION

purpose. Caulking and sealing compound shall not be used for plugging empty
conduits.
EDSD

DATE:

3.06 INSTALLATION OF CONDUIT SUPPORTS


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

A. All conduits shall be installed as a complete system and shall be securely


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

fastened in place. Conduit shall be firmly supported within 3 feet (910 mm) of
(DCC) NO. _____________________

each outlet box, junction box, cabinet, or fitting. Conduit shall be supported at
17U092-092

least every 10 feet (3 meter) in straight runs. Provide additional supports where
SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 73
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
required or as indicated.

B. In steel stud construction, rigidly tie conduit at maximum 4 feet (1.2 m) intervals
ENGG CERT

with No.16 gauge double annealed galvanized wire to prevent conduit movement
from vibration or other causes.

C. Above suspended ceilings, support conduit on or from the structural members of


the building. Use approved beam clamps securely fastened in place, unless
otherwise indicated.

D. Suspended conduit shall be installed on rack hangers made of angle iron,


channel or channel framing, threaded suspension rods sized for the weight to be
DESCRIPTION

carried. Minimum 3/8 inch diameter (10 mm) where rods are more than 2 feet
(0.6 meter) long provide rigid sway bracing. Conduits shall be securely fastened
to hangers using one-hole malleable straps or steel, factory made split-hinged
pipe clamps.

E. Use one-hole malleable iron straps and spacers with metallic expansion anchors
and screws or preset inserts for conduit run exposed on concrete. Use preset
inserts in concrete when possible.
JO/EWO

F. Whenever conduit may be affected by movements of the supporting structures or


medium, and where secured on both sides of building control joints, provide
suitable flexible or expansion joints.
DATE

G. Drilling or welding of conduit to structures or medium will not be permitted, unless


NO.
REV

prior approval is received. Conduit or pipe straps shall not be welded to


DISCIPLINE
ENGINEER
structures.
BOS
DATE: 8-23-17
PROJECT
ENGINEER
AFB - END OF SECTION 16111 – RACEWAYS -
DATE:
8-24-17
CERTIFIED
00-00-16
HAK
DATE:
8-24-17
CONSTRUCTION
AGENCY
SIM
9-20-17
DATE:
OPERATIONS

ASB
DATE:
9-25-17
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 74
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

DIVISION 16 – ELECTRICAL
ENGG CERT

SECTION 16123 – WIRES AND CABLES

PART 1 - GENERAL

1.01 SECTION INCLUDES


DESCRIPTION

A. Building Wires and cables

B. Connectors

C. Wire marker

1.02 REFERENCES

A. SAUDI ARAMCO STANDARDS


JO/EWO

SAES SAUDI ARAMCO Engineering Standards


DATE

a. SAES-P-100 Basic Power System design Criteria

b. SAES-P-104 Wiring method and Materials


NO.
REV

DISCIPLINE
ENGINEER B. CODES AND INDUSTRY STANDARDS
BOS
8-23-17
DATE: SBC 401 SAUDI Building Code
PROJECT
ENGINEER
AFB NEMA National Electrical Manufacturers Association
DATE:
8-24-17
CERTIFIED
00-00-16
HAK
a. NEMA WC-71 Non-shielded Cables Rated 2001-5000V for use in
8-24-17
the Distribution of electric energy.
DATE:
CONSTRUCTION
AGENCY b. NEMA WC-74 Cross Linked Thermosetting Polyethylene-
SIM
9-20-17
Insulated Wire and Cable for the Transmission
DATE:
and Distribution of Electrical Energy
OPERATIONS

ASB
NFPA National Fire Protection Association
DATE:
9-25-17
CONTROL NUMBER

a. NFPA 70-17 National Electrical Code


VERIFICATION
EDSD

ANSI American National Standards Institute


DATE:
BY:

ASTM B8-11 Specification for Concentric-lay-stranded Copper


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Conductors, Hard, Medium-hard, or Soft


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

UL Underwriters Laboratory
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 75
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
a. UL 44-14 Thermoset-Insulated Wires and Cables

b. UL 83-14 Thermoplastic-Insulated Wires and Cables


ENGG CERT

c. UL 1277 Electrical Power and Control Tray Cables with


Optional Optic Fiber Members

d. UL 486A-UL 486B Wire Connector and Soldering Lugs for use


with copper conductor

SASO Saudi Arabian Standards Organization


DESCRIPTION

a. SSA 55 PVC-Insulated Cables with Circular Copper Conductors

IEC International Electrotechnical Commission

a. IEC 60228-04 Thermoplastic-Insulated Wires & Cables

b. IEC 60331-1-09 Test for Electric Cables under Fire Conditions

c. IEC 60364-15 Low voltage electrical installation


JO/EWO

d. IEC 60502-1-04 Power Cables with Extruded Insulation & their


Accessories for Rated Voltages from 1kV up to 30kV
DATE

ICEA Insulated Cable Engineers Association


NO.
REV

DISCIPLINE
IEEE Institute of Electrical & Electronics Engineers
ENGINEER
BOS
OSHA Occupational Safety & Health Act
DATE: 8-23-17
PROJECT
ENGINEER SAMSS SAUDI ARAMCO Material System Specification
AFB
8-24-17
DATE: BS7671-11 Requirement for electrical installation
CERTIFIED
00-00-16
HAK
8-24-17 1.03 SUBMITTALS
DATE:
CONSTRUCTION
AGENCY A. Before starting any installation of any materials or equipment submit for approval
SIM
9-20-17 a complete list to be incorporated in the work. This list shall include catalog
DATE:
OPERATIONS
numbers; cuts, data sheets, and such other descriptive information as may be
required. No consideration will be given to partial lists submitted. Approval of
ASB
9-25-17
materials will be based on manufacturer's published data, installation and
DATE:
roughing-in data sheets and drawings indicating compliance with the Contract
CONTROL NUMBER
VERIFICATION

documents.
EDSD

1.04 DELIVERY, STORAGE AND HANDLING


DATE:
BY:

A. Protect all materials and equipment from damage during handling and storage.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Refer to specification section 16010 -"Basic Electrical requirements" for complete


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

work scope.
(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 76
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

PART 2 - PRODUCTS
ENGG CERT

2.01 MANUFACTURERS:

A. Manufacturers: Subject to compliance with requirements, provide products from


the following:

1. Wire and Cable

American Insulated Wire Corp.


DESCRIPTION

Brintec Corp.
Carol Cable Co. Inc.
Senator Wire and Cable Co.
Southwire Company
Saudi Cable Company
Other Approved Manufacturers

2. Connectors for Wires and Cable Conductors:


JO/EWO

Square D Company
Burndy Co.
Thomas and Betts
DATE

Other Approved Manufacturers


NO.
REV

2.02 WIRES AND CABLES


DISCIPLINE
ENGINEER
BOS A. Conductors: Power and control conductors shall be stranded copper, except
DATE: 8-23-17 solid copper conductor 6mm2 (10AWG) and smaller may be used in non-
PROJECT
ENGINEER
industrial locations. Mineral insulated cables, high temperature cables, etc.) with
AFB solid conductors are also permitted
DATE:
8-24-17
CERTIFIED
00-00-16
B. Conductor Stranding: Stranding shall be ASTM B8 class B or C except flexible
HAK cords, portable cables and motor leads shall have finer stranding in accordance
8-24-17
DATE: with appropriate ICEA and UL/TUV/ENEC/BSI Standards or manufacturer’s
CONSTRUCTION
AGENCY recommendations.
SIM
9-20-17 C. Wiring Insulation for Interior Building Wiring: Unless otherwise indicated, provide
DATE:
OPERATIONS THHN/THWN insulation for all conductor sizes, except for equipment grounding
ASB conductor which may have PVC or thermoplastic insulation (green).
DATE:
9-25-17
D. Minimum Size of Conductors: Unless otherwise indicated, minimum size of
CONTROL NUMBER
VERIFICATION

conductors shall be as follows:


EDSD

Control (600V and below) - 2.5mm2 (14AWG)


DATE:
BY:
REVISIONCERTIFICATION

Power (600V and below) - 4.0mm2 (12AWG)


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

E. Conductors of multi-conductor control cables shall be numbered or color coded


(DCC) NO. _____________________

by colors other than green, green with yellow stripes, white or gray.
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 77
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

F. Low voltage jacketed cables shall comply with NFPA 70 or IEC 502.
ENGG CERT

2.03 CONNECTORS AND TERMINATIONS

A. Provide UL/TUV/ENEC/BSI-listed factory-fabricated, solderless metal connectors


of sizes, ampacity ratings, materials, types and classes for applications and for
services indicated.

Use connectors with temperature ratings equal to or greater than those of the
wires upon which used.
DESCRIPTION

B. Copper compression (crimped) type connectors shall be used for splicing and
terminating stranded conductors, except as noted below:

1. Spring pressure type twist-on connectors and pressure set screw connectors
with insulating caps are permitted for:

a. For lighting and receptacle circuits in non-hazardous locations.


JO/EWO

b. In non-industrial applications.

2. Use of connectors or terminals other than compression type, except solder


DATE

connectors, supplied as integral parts or components of manufactured


equipment such as molded case circuit breakers, contactors, outlets, etc., is
NO.
REV

permitted.
DISCIPLINE
ENGINEER
BOS C. The use of solder lugs is prohibited. Compression connectors for 120mm2 (4/0
DATE: 8-23-17 AWG) and larger conductors shall be two hole NEMA design.
PROJECT
ENGINEER
AFB D. All compression connectors for 10mm2 (8 AWG) and larger conductors shall have
DATE:
8-24-17 a manufacturer’s reference die number and conductor size printed or stamped on
CERTIFIED
00-00-16
the connector.
HAK
8-24-17
DATE: Exception: The use of die less compression tools is acceptable, provided that the
CONSTRUCTION
AGENCY tool is suitable for the connector and (for 8 AWG and larger
SIM conductor connectors) the tool ram embosses the tool
DATE:
9-20-17 manufacturer’s logo on the crimp.
OPERATIONS

ASB E. Insulated ring tongue, locking fork tongue compression (crimped) terminals shall
DATE:
9-25-17 be used for control wiring.
CONTROL NUMBER
VERIFICATION

Exception: Only ring tongue compression (crimped) terminals shall be used for
EDSD

current transformer circuits.


DATE:
BY:

2.04 WIRE MARKERS ON CONDUCTORS


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

A. Other than color-coding requirements identified elsewhere in this Specification,


00

conductor identification is required when conductor numbering systems are


(DCC) NO. _____________________

shown on the drawings. Wires at termination points shall be identified by the use
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 78
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
of permanently embossed wire markers of the heat-shrinkable or slip-on type.
Wrap-around, rigid Snap-On or adhesive type markers are not permitted.
ENGG CERT

2.05 COLOR CODING FOR PHASE IDENTIFICATION

A. Color code secondary service, feeder, and branch circuit conductors with factory
applied color as follows:

Phase 400Y/230 Volts

A Brown
B Black
DESCRIPTION

C Grey
Neutral White
Ground Green

B. Except for ground conductor in which green is mandatory, use conductors with
black insulation or jacket and color-code with Scotch No.35 color-coding tape or
equivalent for specified insulations and jackets not manufactured by the selected
vendor with integral colors. Color-code each conductor entering every box,
cabinet, panelboard, through and wire way. In wire ways and other locations
JO/EWO

where conductors are accessible, color-code conductors every 1500 mm (5FT).


DATE

PART 3- EXECUTION
NO.
REV

3.01 COORDINATION
DISCIPLINE
ENGINEER
BOS A. Obtain and review shop drawing, products data and manufacturer’s instructions
DATE: 8-23-17 for equipment furnished.
PROJECT
ENGINEER
AFB B. Determine the work to be performed by the building contractors and other trades
DATE:
8-24-17 throughout. Provide the type and amount of materials and equipment necessary
CERTIFIED
00-00-16
to place this work in proper operation, completely installed, wired, tested, and
HAK
ready for use.
DATE:
8-24-17
CONSTRUCTION
AGENCY 3.02 INSTALLATION OF WIRES AND CABLES
SIM
9-20-17
DATE: A. Visual inspection of the wires and cables, before any installation, will be carried
OPERATIONS out by SAUDI ARAMCO Representative.
ASB
DATE:
9-25-17 B. Installation of wires and cables shall conform to SAES and NFPA 70.
CONTRACTOR shall check and increase conduit sizes if required so that correct
CONTROL NUMBER
VERIFICATION

conduit fill is maintained based on actual wire furnished.


EDSD

C. Identify each wire in junction boxes, terminal blocks, cabinets, and terminal
DATE:
BY:

terminations boxes see 2.04 & 2.05 for the details.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

D. Conductors shall be continuous between outlets, boxes, devices etc. There shall
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

be no splices or taps within a conduit or fitting.


(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 79
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
E. Coordinate cable installation with other work.

F. Pull conductors simultaneously where more than one is being installed in the
ENGG CERT

same raceway. Use UL/TUV/ENEC/BSI listed pulling compound or lubricant,


where necessary.

G. Use pulling means including, fish tape, cable rope, and basket weave wire/cable
grips which will not damage cables or raceways. Do not use rope hitches for
pulling attachment to wire or cable.

H. Conceal all cable in finished spaces.


DESCRIPTION

I. Install exposed cable parallel and perpendicular to surfaces or exposed structural


members, and follow surface contours, where possible.

J. Keep conductor splices to minimum.

K. Each circuit shall correspond to the branch circuit number or control circuit
number as indicated. All control wiring shall conform to the certified wiring
diagrams submitted, and the manufacturer's wiring diagrams, and shall control
the equipment in the manner specified.
JO/EWO

L. All branch circuits shall be limited to a maximum voltage drop of 3 percent.


Increase branch circuit wire sizes where required to comply with this requirement.
DATE

M. Do not pull wire or cable through any box, fitting or enclosure where change or
NO.
REV

raceway alignment or direction occurs; do not cut strands from conductors to fit
DISCIPLINE lugs or terminals; and do not bend conductors to less than recommended radius
ENGINEER
BOS as set forth in NFPA 70.
DATE: 8-23-17
PROJECT
ENGINEER
N. Install splice and tap connectors which possess equivalent or better mechanical
AFB strength and insulation rating than conductors being spliced.
DATE:
8-24-17
CERTIFIED O. Use splice and tap connectors which are compatible with conductor material.
00-00-16
HAK
DATE:
8-24-17 P. Provide adequate length of conductors within electrical enclosures and train the
CONSTRUCTION
AGENCY
conductors to terminal points with no excess. Bundle multiple conductors, with
SIM conductors larger than 6mm2 (10 AWG) cabled in individual circuits. Make
9-20-17 terminations so there is no bare conductor at the terminal.
DATE:
OPERATIONS

ASB Q. Tighten electrical connectors and terminals, including screws and bolts, in
DATE:
9-25-17 accordance with manufacturer’s published torque tightening values. Where
manufacturer’s torqued requirements are not indicated, tighten connectors and
CONTROL NUMBER
VERIFICATION

terminals specified (tightening torques) in UL 486A- UL 486B.


EDSD

3.03 EQUIPMENT ELECTRICAL CONNECTIONS.


DATE:
BY:
REVISIONCERTIFICATION

A. All electrical connections to equipment shall be in accordance with


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

manufacturer's instructions.
00

(DCC) NO. _____________________

B. Assemble conduit connections to equipment using flexible conduit. Use liquid


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 80
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
tight flexible conduit with watertight connectors in damp or wet locations.

C. Prepare wiring connections using wire and cable with insulation suitable for
ENGG CERT

temperatures encountered in heat producing equipment.

D. Provide receptacle outlet where connection with attachment plug is indicated.


Provide cord and cap where field-supplied attachment plug is indicated.

E. Provide suitable strain-relief clamps and fittings for cord connections at outlet
boxes and equipment connection boxes.

F. Install disconnect switches, controllers, control stations, and control devices as


DESCRIPTION

indicated.

G. Provide interconnecting conduit and wiring between devices and equipment


where indicated.

3.04 FIELD QUALITY CONTROL

A. Cables shall be 500V DC megger tested after installation and prior to placing in
service.
JO/EWO

B. Prior to energizing, test wires and cables for electrical continuity.


DATE

C. Subsequent to wire and cable hook-ups, energize circuits and demonstrate


proper functioning. Correct malfunctioning units, and retest to demonstrate
NO.
REV

compliance.
DISCIPLINE
ENGINEER
BOS D. Written result shall submit to SAUDI ARAMCO Representative for interpretation
DATE: 8-23-17 and approval.
PROJECT
ENGINEER
AFB E. Correct the deficiencies found at no cost to SAUDI ARAMCO.
DATE:
8-24-17
CERTIFIED
00-00-16
HAK
DATE:
8-24-17 - END OF SECTION 16123 – WIRES AND CABLES -
CONSTRUCTION
AGENCY
SIM
9-20-17
DATE:
OPERATIONS

ASB
DATE:
9-25-17
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 81
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

DIVISION 16 - ELECTRICAL
ENGG CERT

SECTION 16135 – CABINETS & BOXES

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. Panelboard cabinet
DESCRIPTION

B. Socket outlet boxes

C. Pull and junction boxes

1.02 REFERENCES

A. SAUDI ARAMCO STANDARDS


JO/EWO

SAES SAUDI ARAMCO Engineering Standards

a. SAES-P-104 Wiring Methods and Materials


DATE

b. SAES-P-100 Basic Power System Design Criteria


NO.
REV

DISCIPLINE
ENGINEER
B. CODES AND INDUSTRY STANDARDS
BOS
DATE: 8-23-17 SASO SSA775 Fiber glass reinforced polyester meter boxes
PROJECT
ENGINEER
AFB NEMA National Electrical Manufacturers Association
DATE:
8-24-17
CERTIFIED
00-00-16
a. NEMA 250-15 Enclosures for Electrical Equipment
HAK
(1000 Volts Maximum)
DATE:
8-24-17
CONSTRUCTION
AGENCY b. NEMA ICS 6-11 Enclosures for Industrial Control and Systems
SIM
9-20-17
DATE: NFPA National Fire protection Association
OPERATIONS

ASB a. NFPA 70-17 National Electrical Code


DATE:
9-25-17
CONTROL NUMBER

ANSI American National Standards Institute


VERIFICATION
EDSD

ASTM American Standard for Testing materials


DATE:
BY:

a. ASTM A-153-16 Standard specification for zinc coating on iron and


REVISIONCERTIFICATION

Steel hardware
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

UL Underwriters Laboratories
(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 82
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
IEEE Institute of Electrical & Electronics Engineers

IEC International Electrotechnical Commission


ENGG CERT

a. IEC 60529-15 Degrees of protection provided by enclosures


(IP code)

OSHA Occupational Safety and Health Act

SAMSS SAUDI ARAMCO Materials System Specification

SEC 01-SDMS-01 (“General Requirements for all equipment/ Materials”)


DESCRIPTION

1.03 SUBMITTALS

A. Product data for cabinets and enclosures with classification higher than NEMA 1.

B. Shop drawings for enclosures and cabinets that are to be shop fabricated,
(nonstock items). For shop fabricated junction and pull boxes, show accurately
scaled views and spatial relationships to adjacent equipment. Show box types,
dimensions, and finishes.
JO/EWO

C. Detailed dimensional drawing of the box showing internal and mounting


arrangements of wiring and all accessories including that for KWH meters and
DATE

circuit breakers, where applicable.


NO.
REV

D. Detailed drawings of cover, locking device, meter window and protective cover,
DISCIPLINE
ENGINEER
breaker access window, bill pocket, enclosure bottom plate, and terminals.
BOS
DATE: 8-23-17 E. Diagram for the internal wiring indicating color codes or numbers for each wires
PROJECT
ENGINEER and terminals.
AFB
DATE:
8-24-17 1.04 DELIVERY, STORAGE AND HANDLING
CERTIFIED
00-00-16
HAK
A. Protect all materials and equipment from damage during handling and storage.
8-24-17
DATE: Refer to specifications Section 16010 - "Basic Electrical Requirements" for
CONSTRUCTION
AGENCY complete work scope.
SIM
9-20-17
DATE: PART 2 - PRODUCTS
OPERATIONS

ASB 2.01 MANUFACTURER


DATE:
9-25-17
CONTROL NUMBER

A. Manufacturers: Subject to compliance with requirements, provide products by the


VERIFICATION

following:
EDSD

DATE:

1. Outlet and Device box:


BY:

MK electric
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

MK 878 ZIC & MK 861 ZIC steel box with adjustable lug
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

Other Approved Manufacturers.


(DCC) NO. _____________________
17U092-092

2. Boxes and Fittings for Hazardous Locations:


SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 83
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
Adalet-PLM
Cooper Industries, Inc.
Killark Electric Mfg. Co.
ENGG CERT

OZ/ Gedney
Robroy Industries, Inc.
Spring City Electrical Mfg. Co.
Woodhead Industries, Inc.
Other Approved Manufacturers

3. Cabinets:
Electric Panelboard, Inc.
Erickson Electrical Equipment Co.
DESCRIPTION

Spring City Electrical Mfg. Co.


Square D Co.
ABB
Other Approved Manufacturers

4. Approved Manufacturer(s)

2.02 PANELBOARD CABINET


JO/EWO

A. Cabinet constructions shall of code gauge sheet steel, each items with a hinged
gasket door, for surface or flush mounting as indicated on the drawings, use
dead-front type, coated with a rust inhibiting primer and finished in baked
DATE

enamel, gray and shall place in dry indoor areas.


NO.
REV

B. Panel board Cabinet trims equipped with a hinged door shall have a semi-flush
DISCIPLINE
ENGINEER
cylinder lock and catch assembly.
BOS
DATE: 8-23-17 2.03 BOXES
PROJECT
ENGINEER
AFB A. Materials shall conform to all requirements as to size for conduit entry and
DATE:
8-24-17 thickness of metal used, and shall be constructed of code-gauge steel of the type
CERTIFIED
00-00-16
as hereinafter specified, and shall be rated for the use and area of installation.
HAK
8-24-17
DATE: B. All boxes 4 11/16" and below shall be equipped with 10/32 - 3/8 inch slotted
CONSTRUCTION
AGENCY hexagon head washer face screw, colored green, where grounded devices are
SIM part of the wiring within the box. All boxes larger than 4 11/16" shall be
9-20-17
DATE: grounded.
OPERATIONS

ASB C. Flush Mounted Boxes, serving exterior equipment and surface mounted lighting
DATE:
9-25-17 fixtures shall be equipped with neoprene gaskets.
CONTROL NUMBER
VERIFICATION

D. Boxes shall be of one-piece construction, galvanized pressed steel, complete


EDSD

with knockouts, minimum 4 inch (100 mm.) square by 2 inch (55 mm.) deep,
unless otherwise indicated, and shall be of sufficient size to provide free space
DATE:
BY:

for all conductors, wire connectors, wiring devices, etc., and shall be of the type
REVISIONCERTIFICATION

and size as follows:


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

1. Masonry - Interior
(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 84
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
In walls of masonry concrete block flush mounted boxes shall be 2 1/4
inch (60 mm.) wide, 3-11/16 inch (95mm) long, 5 1/2 inch (140mm) deep,
galvanized steel with knock-outs for rigid conduit.
ENGG CERT

2. Masonry - Exterior

In wall of masonry concrete block, flush mounted weatherproof cast


feraloy, hot-dip galvanized, boxes with minimum 3/4 inch (20mm) hubs
shall be used. Boxes shall be manufactured by "Crouse-Hinds Company"
Cat. No. FDD2, with Cat No. EXF21 extension. Plug un-used hubs with
Cat. No. PLG2 recessed plugs.
DESCRIPTION

Covers shall be in accordance with Section 16140 for the type of wiring
devices served.

3. Exposed Work

In areas where conduit work and wiring devices are run exposed, surface
mounted, cast feraloy, hot-dip galvanized boxes, with minimum 3/4 inch
(20mm) hubs shall be used. Boxes shall be manufactured by "Crouse-
Hinds Company” Cat. No. FD-2 (single conduit feed) and Cat. No. FDC-2
JO/EWO

(through feed).

Boxes shall be securely and rigidly installed to the conduit. Conduits shall
DATE

be supported within 18 inches (450mm) of the centerline of the box.


Covers shall be in accordance with Section 16130.
NO.
REV

DISCIPLINE
ENGINEER
4” x 4” junction box with knock out provision may be used where
BOS installation is indoor, in a non-classified area and not subject to any
DATE: 8-23-17 physical damage.
PROJECT
ENGINEER
AFB E. Use manufactured or field fabricated pull and junction boxes where required to
DATE:
8-24-17 facilitate pulling of cables and to meet NFPA 70 requirements for maximum
CERTIFIED
00-00-16
conduit bends.
HAK
DATE:
8-24-17
CONSTRUCTION
AGENCY PART 3 – EXECUTION
SIM
9-20-17 3.01 COORDINATION
DATE:
OPERATIONS

ASB A. Determine the work to be performed by the building contractors and others
DATE:
9-25-17 throughout. Provide the type and amount of materials and equipment necessary
to place this work in proper operation, completely installed, tested, and ready for
CONTROL NUMBER
VERIFICATION

use.
EDSD

3.02 INSTALLATION OF OUTLET BOX


DATE:
BY:
REVISIONCERTIFICATION

A. Locations in Special Finish Materials: For outlet boxes for receptacles and
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

switches mounted in desks or furniture cabinets or in glazed tile, concrete block,


marble, brick, stone or wood walls, use rectangular shaped boxes with square
(DCC) NO. _____________________

corners and straight sides. Install such boxes without plaster rings. Saw cut all
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 85
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
recesses for outlet boxes in exposed masonry walls.

B. Gasketed Boxes: At the following locations use cast metal, threaded hub type
ENGG CERT

boxes with gasketed weatherproof covers:

1. Exterior locations.
2. Where surface mounted on unfinished walls, columns or pilasters. (Cover
gaskets may be omitted in dry locations).
3. Where exposed to moisture laden atmosphere.
4. At food preparation equipment within four ft. of steam connections.
5. Where indicated.
DESCRIPTION

C. Mounting: Mount outlet boxes for switches with the long axis vertical or as
indicated. Mount boxes for receptacles either vertically or horizontally but
consistently either way. Locate box covers or device plates so they will not span
different types of building finishes either vertically or horizontally. Locate boxes
for switches near doors on the side opposite the hinges and close to door trim,
even though electrical floor plans may show them on hinge side.

D. Ceiling Outlets: For fixtures, where wiring is concealed, use outlet boxes 4-inches
square by 1-1/2-inches deep, minimum, unless otherwise indicated.
JO/EWO

E. Cover Plates for Surface Boxes: Use plates sized to box front without overlap.
DATE

F. Protect outlet boxes to prevent entrance of plaster, and debris. Thoroughly clean
foreign material from boxes before conductors are installed.
NO.
REV

DISCIPLINE
ENGINEER
3.03 INSTALLATION OF PULL AND JUNCTION BOXES
BOS
DATE: 8-23-17 A. Box Selection: For boxes in main feeder conduit runs, use sizes not smaller than
PROJECT
ENGINEER 8-inches square by 4-inches deep. Do not exceed 6 entering and 6 leaving
AFB raceways in a single box. Quantities of conductors (including equipment
DATE:
8-24-17 grounding conductors) in pull or junction box shall not exceed the following:
CERTIFIED
00-00-16
HAK Size of Maximum no. of
8-24-17
DATE: Largest Conductors Conductors in Box
CONSTRUCTION
AGENCY in Box
SIM
DATE:
9-20-17 No. 4/0 AWG 30
OPERATIONS 250 MCM 20
ASB
9-25-17 B. Cable Supports: Install clamps, grids, or devices to which cables may be
DATE:
secured. Arrange cables so they may be readily identified. Support cable at least
CONTROL NUMBER
VERIFICATION

every 30-inches inside boxes.


EDSD

C. Mount pull boxes in inaccessible ceilings with the covers flush with the finished
DATE:

ceiling.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

D. Size: Provide pull and junction boxes for telephone, signal, and other systems at
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

least 50 percent larger than would be required by Article 370 of NFPA 70 or as


(DCC) NO. _____________________

indicated. Locate boxes strategically and provide shapes to permit easy pulling of
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 86
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
future wires or cables of type’s normal for such systems.

3.04 INSTALLATION OF CABINETS AND HINGED DOOR ENCLOSURES


ENGG CERT

A. Mount with fronts straight and plumb.

B. Install with tops 78-inches above floor.

C. Set cabinets in finished spaces flush with walls, unless indicated shown
otherwise.

3.05 GROUNDING
DESCRIPTION

A. Electrically ground metallic cabinets, boxes, and enclosures. Where wiring to


item includes a grounding conductor, provide a grounding terminal in the interior
of the cabinet, box or enclosure.

3.06 CLEANING AND FINISH REPAIR

A. Upon completion of installation, inspect components. Remove burrs, dirt, and


construction debris and repair damaged finish including chips, scratches,
JO/EWO

abrasions and weld marks.

B. Galvanized Finish: Repair damage using a zinc-rich paint recommended by the


DATE

tray manufacturer.
NO.
REV

C. Painted Finish: Repair damage using matching corrosion inhibiting touch-up


DISCIPLINE
ENGINEER
coating.
BOS
DATE: 8-23-17
PROJECT
ENGINEER
AFB - END OF SECTION 16135 – CABINETS & BOXES -
DATE:
8-24-17
CERTIFIED
00-00-16
HAK
DATE:
8-24-17
CONSTRUCTION
AGENCY
SIM
9-20-17
DATE:
OPERATIONS

ASB
DATE:
9-25-17
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 87
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

DIVISION 16 - ELECTRICAL
ENGG CERT

SECTION 16140 - WIRING DEVICES

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. Socket outlets.
DESCRIPTION

B. Device Plates

1.02 REFERENCES

A. SAUDI ARAMCO STANDARDS

SAES SAUDI ARAMCO Engineering Standards

a. SAES-123 Lighting
JO/EWO

B. CODES AND INDUSTRY STANDARDS


DATE

UL Underwriters Laboratory
NO.
REV

b. UL 486A-486B Wire Connector and Soldering Lugs for use of Copper


DISCIPLINE
ENGINEER
Conductor
BOS
DATE: 8-23-17 NEMA National Electrical Manufacturer Association
PROJECT
ENGINEER
AFB c. NEMA WD 1-15 General Color Requirements for Wiring Devices.
DATE:
8-24-17
CERTIFIED
00-00-16
d. NEMA WD 6-16 Wiring Devices - Dimensional Specifications.
HAK
8-24-17
DATE: NFPA National Fire Protection Association
CONSTRUCTION
AGENCY
SIM e. NFPA 70-17 National Electrical Code
9-20-17
DATE:
OPERATIONS NECA Standard of Installation.
ASB
DATE:
9-25-17 1.03 SUBMITTALS
CONTROL NUMBER
VERIFICATION

A. Product Data: Provide manufacturer’s catalog information showing dimensions,


EDSD

colors, and configurations.


DATE:
BY:

1.04 QUALIFICATIONS
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

A. Manufacturer: Companies specializing in manufacturing the Products specified


in this Section with minimum three years documented experience and SAUDI
(DCC) NO. _____________________

ARAMCO approved manufacturers.


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 88
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

1.05 REGULATORY REQUIREMENTS


ENGG CERT

A. Conform to requirements of NFPA 70.

B. Provide Products listed and classified by Underwriters Laboratories, Inc., as


suitable for the purpose specified and indicated.

1.06 DELIVERY, STORAGE AND HANDLING

A. Protect all materials and equipment from damage during handling and
storage. Refer to specifications Section 16010 - “Basic Electrical
DESCRIPTION

Requirements” for complete work scope.

1.07 TESTING

A. The type test certificate for each type of outlet box may be accepted in lieu of the
actual tests on the boxes being supplied on this project.

PART 2 - PRODUCTS
JO/EWO

2.01 GENERAL
DATE

A. Provide factory packaged wiring devices, in type, color, and electrical rating for
the service required and as indicated hereinafter. Where type and grade are not
NO.
REV

indicated provide proper selection as required by the equipment to be served to


DISCIPLINE
ENGINEER
fulfill the wiring requirements, and to comply with "NFPA 70 and NEMA standards
BOS for wiring devices.
DATE: 8-23-17
PROJECT
ENGINEER 2.01 RECEPTACLES & IP SWITCHES
AFB
DATE:
8-24-17 A. BS 2-Gang (switched) outlet, BS-1363 type, 250V, 13A, 60Hz. 30mA RCD
CERTIFIED
00-00-16
protected.
HAK
8-24-17
DATE: B. 2-Gang Switched Socket Outlet, BS-1363 type, 1-P, 250V, 13A, 60Hz.
CONSTRUCTION
AGENCY
SIM C. IP Switch, 250V, 20A, Reference MK “K5423 or approved equal.
9-20-17
DATE:
OPERATIONS D. IP Switch for water heater control/clothes dryers 32A, 250V, Reference MK “K-
ASB 5105” or approved equal.
DATE:
9-25-17
IP Switch for range/special purpose outlet; 50A, 250V, 60Hz. Reference MK “K-
CONTROL NUMBER

E.
VERIFICATION

5215” or equivalent.
EDSD

F. New recessed wall mounted dimmer switch, 230V, 60Hz, up to 500W maximum,
DATE:
BY:

40W slide up and down Cat. # Lyneo, white, By: Lutron control or approved
REVISIONCERTIFICATION

equal.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

2.02 MANUFACTURERS/ VENDORS/SUPPLIER


(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 89
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
A. Manufacturers: Subject to compliance with requirements, provide product by the
following:
ENGG CERT

A. MK Electric
B. G. E. Wiring Devices
C. Wiring Device Div./Hubbell
D. Leviton Manufacturing Company
E. Pass and Seymour/Legrand
F. Other Approved Manufacturers

B. Recommended Vendor(s)/Supplier(s)
DESCRIPTION

A. Al-Fanar Trading
Tel. No.: 859-3832
Fax No.: 859-3812
B. Abdul Karim Trading
Tel. No.: 833-7110
Fax No.: 833-8242
C. Saudi Electric Supply Co. (SESCO)
Tel. No. 882-6739
JO/EWO

Fax No.882-5768

D. Remal Electric Factory


DATE

Tel. No. 812-1266


Fax No. 812-1295
NO.
REV

E. SAUDI ARAMCO Approved Vendor(s)/Supplier(s)


DISCIPLINE
ENGINEER
BOS 2.03 DEVICE PLATES
DATE: 8-23-17
PROJECT
ENGINEER A. Plates shall be provided for all wiring devices, telephone and data outlet boxes.
AFB Plates shall be of suitable configuration for the number and type of device.
DATE:
8-24-17
CERTIFIED
00-00-16
HAK
PART 3 - EXECUTION
DATE:
8-24-17
CONSTRUCTION
AGENCY 3.01 EXAMINATION
SIM
9-20-17
DATE: A. Verify that outlet boxes are installed at proper height.
OPERATIONS

ASB B. Verify that wall openings are neatly cut and will be completely covered by wall
DATE:
9-25-17 plates.
CONTROL NUMBER
VERIFICATION

3.02 PREPARATION
EDSD

A. Provide extension rings to bring outlet boxes flush with finished surface.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

B. Clean debris from outlet boxes.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

3.03 INSTALLATION
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 90
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
A. Install wiring devices and accessories in accordance with manufacturer's written
instructions, applicable requirements of NFPA 70 and in accordance with
recognized industry practices to fulfill project requirements.
ENGG CERT

B. Install wiring devices only in electrical boxes which are clean; free from excess
building materials, dirt, and debris.

C. Install devices plumb and level.

D. Install switches with OFF position down.

E. Install wiring devices after wiring work is completed.


DESCRIPTION

F. Install wall plates after painting work is completed.

G. Tighten connectors and terminals, in accordance with equipment manufacturer's


published torque tightening values for wiring devices. Where manufacturer's
torquing requirements are not indicated, tighten connectors and terminals to
comply with tightening torques specified in UL Standard 486A-486B. Use
properly scaled torque indicating hand tool.
JO/EWO

H. All standard receptacles shall be grounded by means of a ground wire running


along with the phase wires within conduits. A bonding jumper shall be provided
between the outlet box and the equipment ground wire.
DATE

3.04 FIELD QUALITY CONTROL


NO.
REV

DISCIPLINE
ENGINEER
A. Inspect each wiring device for defects.
BOS
DATE: 8-23-17 B. Operate each wall switch with circuit energized and verify proper operation.
PROJECT
ENGINEER
AFB C. Verify that each receptacle device is energized.
DATE:
8-24-17
CERTIFIED
00-00-16
D. Test each receptacle device for proper polarity.
HAK
8-24-17
DATE: E. Test each Residual Current Devices (RCD) type receptacles or devices for
CONSTRUCTION
AGENCY proper operation.
SIM
9-20-17
DATE: 3.05 ADJUSTING
OPERATIONS

ASB A. Adjust devices and wall plates to be flush and level.


DATE:
9-25-17
CONTROL NUMBER

3.06 CLEANING
VERIFICATION
EDSD

A. Clean exposed surfaces to remove splatters and restore finish.


DATE:
BY:
REVISIONCERTIFICATION

- END OF SECTION 16140 - WIRING DEVICES -


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 91
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

DIVISION 16 - ELECTRICAL
ENGG CERT

SECTION 16195 - ELECTRICAL IDENTIFICATION

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. Nameplates and labels


DESCRIPTION

B. Wires and cable markers

C. Conduit markers

D. Arc flash labels

1.02 REFERENCES

A. SAUDI ARAMCO STANDARDS


JO/EWO

SAES SAUDI ARAMCO Engineering Standards


DATE

a. SAES P-104 Wiring Methods and Materials


NO.
REV

b. SAES B-067 Wiring Methods and Materials


DISCIPLINE
ENGINEER
BOS B. CODES AND INDUSTRY STANDARDS
DATE: 8-23-17
PROJECT
ENGINEER NFPA70E-13 Electrical Safety Requirements for Employee
AFB Workplaces.
DATE:
8-24-17
CERTIFIED
00-00-16
1.03 SUBMITTALS
HAK
8-24-17
DATE: A. Product Data: Provide product Data for each type of product specified.
CONSTRUCTION
AGENCY
SIM 1.04 REGULATORY REQUIREMENTS
9-20-17
DATE:
OPERATIONS A. Conform to requirements of ANSI/NFPA 70.
ASB
DATE:
9-25-17 B. Furnish products listed and classified by Underwriters Laboratories, Inc. or
CONTROL NUMBER

approved equal as suitable for purpose specified and shown.


VERIFICATION
EDSD

PART 2 – PRODUCTS
DATE:
BY:

2.01 NAME PLATES AND LABELS


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

A. Nameplates: Engraved three – layer laminated plastic, black letters on white


00

background.
(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 92
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
B. Location:

1. Each electrical distribution and control equipment enclosure


ENGG CERT

2. Each distribution transformer

3. All switches and socket outlets

C. Letter size:

1. Use 5mm high letters for identifying individual equipment and loads
DESCRIPTION

2. Use 6mm high letters for identifying individual equipment and loads

2.02 WIRE MARKERS

A. Manufacturers:

1. Ideal industries Inc, Model: 44-102

2. Thomas and Betts Company, Model: WM-AZ


JO/EWO

3. Reputed Manufacturer, Model: Equal


DATE

4. Rychem
NO.
REV

B. Descriptions: Plastic heat shrinkable type wire markers.


DISCIPLINE
ENGINEER
BOS C. Locations: Each conductor at panel board gutters outlet and junction boxes and
DATE: 8-23-17 each load connection.
PROJECT
ENGINEER
AFB D. Legend:
DATE:
8-24-17
CERTIFIED
00-00-16
1. Power and lighting Circuit: Branch circuit or feeder number indicated on the
HAK
drawings.
DATE:
8-24-17
CONSTRUCTION
AGENCY 2. Control circuits: Control wire number indicated on shop drawings
SIM
9-20-17
DATE: 2.03 CONDUIT MARKERS
OPERATIONS

ASB A. Manufacturers:
DATE:
9-25-17
CONTROL NUMBER

1. General Machine Product Co. Model: 7270-D.


VERIFICATION
EDSD

2. Reputed Manufacturer, Model: Equal


DATE:
BY:

B. Descriptions: Tag; cable; Round type; Lead.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

C. Locations: Furnish markers for each conduit longer than 2m


(DCC) NO. _____________________

D. Spacing: 6mm on center.


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 93
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

2.04 ARC FLASH LABEL


ENGG CERT

A. Install Arc Flash and Shock Hazard Warning Labels on all new electrical
distribution equipment in accordance with current version of SAUDI ARAMCO G.I.
2.721.

B. Labels shall be thermal transfer type label of high adhesion polyester for each
location analyzed and shall be machine printed, with no field markings. Labels
shall meet the requirements of SAES-B-067 Paragraph 4.1.7. Refer to standard
label layout on ARC FLASH 2.721.
DESCRIPTION

C. Information (Data) to be printed in the label shall be provided by SAUDI ARAMCO


(UESU).

PART 3 – EXECUTION

3.01 INSTALLATION
JO/EWO

A. Lettering and Graphics: Coordinate names, abbreviations, colors, and other


designations used in electrical identification work with corresponding
designations specified or indicated. Install numbers, lettering, and colors as
DATE

approved in submittals and as required by code.


NO.
REV

B. Install identification devices in accordance with manufacturer's written


DISCIPLINE
ENGINEER
instructions and requirements of NFPA 70 and Saudi Building Code (SBC 401).
BOS
DATE: 8-23-17 C. Sequence of Work: Where identification is to be applied to surfaces that require
PROJECT
ENGINEER finish, install identification after completion of finish work.
AFB
DATE:
8-24-17 D. Conductor Color Coding:
CERTIFIED
00-00-16
HAK
1. Provide color coding for secondary service, feeder, and branch circuit
8-24-17
DATE: conductors throughout the project secondary electrical system as follows:
CONSTRUCTION
AGENCY
SIM Phase 400Y/230 Volts
9-20-17
DATE: A Brown
OPERATIONS B Black
ASB C Gray
DATE:
9-25-17 Neutral White
CONTROL NUMBER

Ground Green
VERIFICATION
EDSD

2. For specified insulations and jackets not manufactured by the selected


vendor with integral colors, use conductors with black insulation or jacket
DATE:
BY:

and color-code with Scotch No. 35 color-coding tape or equivalent. Color


REVISIONCERTIFICATION

code each conductor entering every box, cabinet, panelboard, though, and
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

wire way. In wire ways and other locations where conductors are
accessible, color-code conductors every 1500mm (5 FT).
(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 94
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
3. The following field-applied color-coding methods may be used in lieu of
factory-coded wire for sizes larger than No. 10 AWG.
ENGG CERT

a. Apply colored, pressure-sensitive plastic tape in half- lapped turns for


a distance of 6 inches from terminal points and in boxes where splices
or taps are made. Apply the last two laps of tape with no tension to
prevent possible unwinding. Use 1-inch-wide tape in colors as
specified. Do not obliterate cable identification markings by taping.
Tape locations may be adjusted slightly to prevent such obliteration.

b. In lieu of pressure-sensitive tape, colored cable ties may be used for


color identification. Apply three ties of specified color to each wire at
DESCRIPTION

each terminal or splice point starting 3 inches from the terminal


spaced 3 inches apart. Apply with a special tool or pliers, tighten for
snug fit, and cut off excess length.

c. For control and communications/signal wiring, use color coding or


wire/cable markers at terminations and at intermediate locations
where conductors appear in wiring boxes, troughs, and control
cabinets. Use consistent letter/number conductor designations
throughout on wire/cable markers.
JO/EWO

E. Arc Flash Label installation


DATE

a. Labels shall be fitted to all accessible/removable panels or hinged doors.


NO.
REV

b. The label should be placed close to the operating handle, cover latch, or in
DISCIPLINE
ENGINEER
another readily visible location.
BOS
DATE: 8-23-17
PROJECT
ENGINEER -END OF SECTION 16195 – ELECTRICAL IDENTIFICATION-
AFB
DATE:
8-24-17
CERTIFIED
00-00-16
HAK
DATE:
8-24-17
CONSTRUCTION
AGENCY
SIM
9-20-17
DATE:
OPERATIONS

ASB
DATE:
9-25-17
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 95
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

DIVISION 16 - ELECTRICAL
ENGG CERT

SECTION 16440 - DISCONNECT SWITCH

PART 1 - GENERAL

1.06 SECTION INCLUDES

A. Disconnect Switch (ECB)


DESCRIPTION

1.07 REFERENCES

A. SAUDI ARAMCO STANDARDS

SAES SAUDI ARAMCO Engineering Standard

a. SAES-P-100 Basic Power System Design Criteria


JO/EWO

b. SAES-P-104 Wiring Methods and Materials

B. CODES AND INDUSTRY STANDARDS


DATE

NEMA National Electrical Manufacturers Association


NO.
REV

DISCIPLINE
ENGINEER
a. NEMA KS 1-13 Heavy Duty Enclosed and Dead-front
BOS Switches (600V maximum)
DATE: 8-23-17
PROJECT
ENGINEER NFPA 70-17 National Fire Protection Association
AFB
DATE:
8-24-17 ANSI American National Standards Institute
CERTIFIED
00-00-16
HAK UL Underwriters Laboratories
DATE:
8-24-17
CONSTRUCTION
AGENCY a. UL 98-16 Standard for Safety Enclosed and Dead-front
SIM Switches
9-20-17
DATE:
OPERATIONS IEEE Institute of Electrical & Electronics Engineers
ASB
DATE:
9-25-17 SAMMS SAUDI ARAMCO Material System Specification
CONTROL NUMBER
VERIFICATION

1.08 QUALITY ASSURANCE


EDSD

A. Electrical Component Standards: Provide components complying with


DATE:
BY:

ANSI/NFPA 70 and which are listed and labeled by UL/TUV/ENEC/BSI.


REVISIONCERTIFICATION

Comply with UL 98 and NEMA KS 1


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

1.01 SUBMITTALS
(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 96
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
A. Before starting installation of any material or equipment, submit for approval a
complete list of materials and equipment to be incorporated in the WORK. This
list shall include catalog numbers, cuts, data sheets and such other descriptive
ENGG CERT

information as may be required. No consideration will be given to partial lists


submitted from time to time. Approval of materials will be based on
manufacturer's published data, installation and roughing-in data sheets and
drawings indicating compliance with the Contract documents.

1.02 DELIVERY, STORAGE AND HANDLING

A. Protect all materials and equipment from damage during handling and storage.
Refer to specification Section 16010 - "Basic Electrical Requirements" for
DESCRIPTION

complete work scope

PART 2 – PRODUCTS

2.01 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide products by the


following:
JO/EWO

Crouse-Hinds Co.
Cutler-Hammer Inc.
DATE

General Electric Co.


Square D Company.
NO.
REV

Westinghouse Electric Corp.


DISCIPLINE Other Approved Manufacturers
ENGINEER
BOS
DATE: 8-23-17
2.02 DISCONNECT SWITCHES
PROJECT
ENGINEER
AFB
A. Switches shall be furnished in NEMA Type 1 general purpose enclosures and/or
8-24-17 NEMA Type 4 stainless steel watertight for outdoor use and wet locations.
DATE:
CERTIFIED
00-00-16
HAK B. Covers for general purpose enclosures shall be of the hinged type. Provisions
DATE:
8-24-17 for pad-locking covers in the closed position, with defeatable interlocks to prevent
CONSTRUCTION
AGENCY
the cover from opening when the operating handle is in the "on" position shall be
SIM provided. Enclosures shall be fabricated of code gauge steel, coated with a rust
DATE:
9-20-17 inhibiting primer and finished in baked enamel, ANSI-611 gray. Factory installed
OPERATIONS ground lugs shall be provided in each enclosure.
ASB
9-25-17
1. Non-Fusible disconnect switch; 30Amp, 3P, 400V, 60Hz. in NEMA-2
DATE:
enclosure.
CONTROL NUMBER
VERIFICATION

2. Fusible disconnect switch; 60Amp, 3P, 400V, 60Hz. in NEMA-4X


EDSD

enclosure.
DATE:
BY:

1. Switch Interiors and Mechanisms:


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

1. Circuit Breaker mechanism shall be of the quick-make, quick-break type,


(DCC) NO. _____________________

with pad lockable operating handle as an integral part of the enclosure


17U092-092

base. Switches shall have dual cover interlocks to prevent unauthorized


SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 97
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
opening of the switch when handle in on the ON position, or closing of
mechanism with cover in the open position.
ENGG CERT

2. Ratings: Provide horsepower-rated switches for use as motor circuit


disconnects, of ratings as shown on drawings. Switches shall be Model H-
600 as manufactured by Westinghouse Electric Corporation, with number of
poles, voltage and rating as shown on drawings. Factory mounted, metal
nameplate with permanent stamping of switch type, voltage, catalog
number and horsepower rating shall be provided and installed on front
cover. Prior to installation, verify the equipment manufacturer's
recommendations for the rating of the switches.
DESCRIPTION

3. Switches shall have terminal temperature ratings 75°C or higher.

4. The assembly shall be rated to withstand mechanical forces exerted during


short circuit conditions when connected directly to a power source having
available fault current as indicated on drawings at rated voltage.

5. Voltage rating shall be 400/230V, 3Phase, as indicated on the drawings.


JO/EWO

PART 3 EXECUTION

3.01 INSTALLATION
DATE

A. Mount all individually Disconnect switch rigidly and align properly. Install
disconnect switch on fabricate free standing switch rack with 1.7M high above
NO.
REV

DISCIPLINE finish floor.


ENGINEER
BOS
DATE: 8-23-17
B. Provide and install a nameplate for disconnects. Nameplates shall be engraved
PROJECT in both Arabic and English, indicating the name of equipment served with circuit
ENGINEER
or motor number.
AFB
DATE:
8-24-17
CERTIFIED C. Nameplates shall be black-on-white, laminated phenolic, engraved in minimum
00-00-16
HAK 6.5mm high lettering. Provide other or additional information on nameplates as
DATE:
8-24-17 required.
CONSTRUCTION
AGENCY
SIM D. Install nameplates to disconnect with appropriate sheet metal screws. Glue-on
DATE:
9-20-17 types and pop-rivet types are not acceptable. Submit samples where requested.
OPERATIONS

ASB 3.01 FIELD QUALITY CONTROL


DATE:
9-25-17
A. Testing: Subsequent to completion of installation of electrical disconnect
CONTROL NUMBER
VERIFICATION

switches, energize circuits and demonstrate capability and compliance with


EDSD

requirements. Except as otherwise indicated, do not test switches by operating


them under load. However, demonstrate switch operation through six
DATE:

opening/closing cycles with circuit unloaded. Open each switch enclosure for
BY:

inspection of interior, mechanical and electrical connections. Correct deficiencies


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

then retest to demonstrate compliance. Remove and replace defective units with
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

new units and retest.


(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 98
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
- END OF SECTION 16440 - DISCONNECT SWITCH -

DIVISION 16 - ELECTRICAL
ENGG CERT

SECTION 16470 - DISTRIBUTION PANEL

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. Lighting and Power Distribution Panel


DESCRIPTION

1.02 REFERENCES

A. SAUDI ARAMCO STANDARDS

SAES SAUDI ARAMCO Engineering Standards

a. SAES P-116 Switchgear & Control Equipment.


JO/EWO

SAMMS SAUDI ARAMCO Materials Specification Standard

a. 16-SAMSS-518 Low Voltage Panelboards


DATE

B. CODES AND INDUSTRY STANDARDS


NO.
REV

DISCIPLINE
ENGINEER
NECA National Electrical Contractors Association)
BOS “Standard of Installation.”
DATE: 8-23-17
PROJECT
ENGINEER NEMA National Electrical Manufacturers Association
AFB
DATE:
8-24-17 a. NEMA KS 1-13 Heavy Duty Enclosed and dead-Front Switches.
CERTIFIED
00-00-16
HAK
b. NEMA PB 1-11 Panelboards
DATE:
8-24-17
CONSTRUCTION
AGENCY c. NEMA PB 1.1 General Instructions for Proper Handling,
SIM Installation, Operation & Maintenance of Panelboard
9-20-17
DATE: Rated 600 Volts or Less
OPERATIONS

ASB W-C- 375/15B Circuit Breakers Molded Case, branch circuit and
DATE:
9-25-17 service.
CONTROL NUMBER
VERIFICATION

UL Underwriter laboratory
EDSD

a. UL67-09 Standard for Safety Panelboards


DATE:
BY:
REVISIONCERTIFICATION

b. UL50-15 Standard for Safety Enclosed for Electrical


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

Equipment, Non-Environmental Considerations


(DCC) NO. _____________________

c. UL98-16 Standard for Safety Enclosed & Dead Front Switches


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 99
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

NFPA 70-17 National Fire Protection Association


ENGG CERT

NECA National Electrical Contractors Association

IEC 60529-13 Degrees of protection provided by enclosure (IP code)

1.03 PROJECT RECORD DOCUMENTS

A. Record actual locations of Products; indicate actual branch circuit arrangement.

1.04 OPERATION AND MAINTENANCE DATA


DESCRIPTION

A. Maintenance Data: Include spare parts data listing; source and current prices of
replacement parts and supplies; and recommended maintenance program
including procedures and intervals.

1.05 QUALITY ASSURANCE

A. Perform Work in accordance with NECA Standard of Installation.


JO/EWO

B. Codes and Standards: Comply with the provisions of the latest edition of the
following:-
DATE

1.06 QUALIFICATIONS
NO.
REV

A. Manufacturer: Company specializing in manufacturing the Products specified in


DISCIPLINE
ENGINEER
this section with minimum three years documented experience and SAUDI
BOS ARAMCO Approved Manufacturers.
DATE: 8-23-17
PROJECT
ENGINEER 1.07 SUBMITTALS
AFB
DATE:
8-24-17 B. Product data for each type panelboard, accessory item, and component
CERTIFIED
00-00-16
specified.
HAK
8-24-17
DATE: C. Shop drawings from manufacturers of panelboards including dimensioned plans,
CONSTRUCTION
AGENCY sections, and elevations. Show tabulations of installed devices, major features,
SIM and voltage rating. Include the following:
9-20-17
DATE:
OPERATIONS a. Enclosure type with details for types other than NEMA Type 1.
ASB
DATE:
9-25-17 b. Bus configuration and current ratings.
CONTROL NUMBER
VERIFICATION

c. Short-circuit current rating of panelboard.


EDSD

d. Features, characteristics, ratings, and factory settings of individual


DATE:
BY:

protective devices and auxiliary components.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

e. Spare Fuse Cabinets: Show materials, dimensions, and features including


storage provisions for fuse cartons.
(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 100
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

D. Wiring diagrams detailing schematic diagram including control wiring, and


ENGG CERT

differentiating between manufacturer-installed and field-installed wiring.

E. Qualification data for field-testing organization certificates, signed by the


CONTRACTOR, certifying that the organization complies with the requirements
specified in Quality Assurance below. Include list of completed projects with
project names, addresses, and names of Architect and Owner plus basic
organization qualifications data.

F. Maintenance data for panelboard components, for inclusion in Operating and


DESCRIPTION

Maintenance Manual specified in Division 1 and in Division 16 Section "Basic


Electrical Requirements." Include instructions for testing circuit

1.08 FIELD MEASUREMENTS

A. Verify that field measurements are as indicated on Contract Drawings.

PART 2 - PRODUCTS
JO/EWO

2.01 MANUFACTURER
DATE

A. Manufacturers: Subject to compliance with requirements, provide products by the


following:
NO.
REV

DISCIPLINE
ENGINEER 1. Eaton Corp.
BOS 2. General Electric Co.
DATE: 8-23-17 3. JEDAC
PROJECT
ENGINEER 4. Siemens Energy & Automation, Inc.
AFB 5. Square D Co.
DATE:
8-24-17 6. WESCOSA
CERTIFIED
00-00-16 7. Middle East Electric Factory co.
HAK
8. Other approved vendor
DATE:
8-24-17
CONSTRUCTION
AGENCY 2.02 LIGHTING AND POWER PANELBOARD ASSEMBLY.
SIM
9-20-17
DATE: A. The panels shall be designed for sequence connection of branch circuit devices,
OPERATIONS
interior adjustable if for flush mounting. Main lugs shall be mechanical solderless
ASB type, and approved for CU conductors. Main lugs shall be secured in line with
DATE:
9-25-17 UL/TUV/ENEC/BSI standards to prevent lugs from turning or loosening when
CONTROL NUMBER

incoming cables are installed.


VERIFICATION
EDSD

B. The panel chassis assembly shall be rigid to assure accurate alignment of interior
with panel front. Boxes are code gauge galvanized steel. Liberal gutter space
DATE:
BY:

shall meet or exceed UL/TUV/ENEC/BSI and NFPA 70 code requirements. Trims


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

for panels shall be modernistic in appearance having light gray finish, and shall
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

be available in both surface and flush-with-mounting design. Flush trim shall be


(DCC) NO. _____________________

adjustable to compensate for up to 19mm (¾") misalignment between box front


and wall surface.
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 101
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

C. Overcurrent Protective Devices (OCPDs): Provide type, rating, and features as


indicated. Tandem circuit breakers shall not be used. Multipole breakers shall
ENGG CERT

have common trip.

D. Panel Bus: Copper, ratings as indicated. Provide copper ground bus in each
panel. Provide insulated ground bus where scheduled. The panel shall have a
neutral bus.

E. Fully rated minimum short circuit interrupting rating: 10,000 amperes rms.
Symmetrical for volt AC panels unless otherwise shown on the drawings.
DESCRIPTION

2.03 MOLDED CASE CIRCUIT BREAKER

A. Molded Case Circuit Breakers: Bolt-on type thermal magnetic trip circuit
breakers, with common trip handle for all poles. Provide circuit breakers UL listed
as Type C for lighting circuits. Provide UL/TUV/ENEC/BSI Class A residual
current circuit breaker with overcurrent protection (RCBO) circuit breakers where
scheduled. Do not use tandem circuit breakers.

2.04 PANELBOARD
JO/EWO

A. Panelboard; 100AT/100AF, 10kAIC, 400Y/230V, 3Phase, 4W, 60Hz, 42ways


branch circuits, NEMA-1 enclosure, Recessed mounted. Refer to panelboard
DATE

load schedule for sizes or rating of circuit breaker units.


Note: Provide RCBO circuit breaker to the selected branch circuit
NO.
REV

DISCIPLINE
ENGINEER
2.05 CABLE BUSHING AND CABLE CLAMP:
BOS
DATE: 8-23-17 A. Cable bushings shall be dust, temper and temperature proof, UV stabilized rigid
PROJECT
ENGINEER
PVC and provided in the base of the boxes to accommodate 50mm inside
AFB diameter conduit, for single meter box only and 80mm inside diameter conduit
DATE:
8-24-17 for the rest of meter boxes.
CERTIFIED
00-00-16
HAK B. Galvanized metallic cable clamp fittings 2mm thick shall be provided inside the
8-24-17
DATE: box to support the incoming and outgoing conduits up to 70 mm. Cable entry
CONSTRUCTION
AGENCY plate shall not be removable unless door is opened.
SIM
9-20-17 2.06 BREAKER AND METER MOUNTING RAIL:
DATE:
OPERATIONS

ASB A. Hot-dip galvanized steel rails equipped with sliding spring-loaded steel nuts size
DATE:
9-25-17 M4, suitable for a range of MCCB’s and KWH meters of various sizes, shall be
provided.
CONTROL NUMBER
VERIFICATION
EDSD

PART 3 - EXECUTION
DATE:
BY:
REVISIONCERTIFICATION

3.01 INSTALLATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

A. Install panelboards in accordance with NEMA PB 1.1.


(DCC) NO. _____________________
17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 102
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

B. Install panelboards plumb. Provide supports in accordance with manufacturer‘s


ENGG CERT

instructions.

C. Height 1.8M (6 ft.) to top of panelboard.

D. Use secured support and anchorage for all individually mounted breakers
required.

E. Mount individually Panelboards 1" off the wall, with top of enclosure not to
exceed 6'-6" above finished floor.
DESCRIPTION

F. Provide filler plates for unused spaces in panelboards.

G. Provide typed circuit directory for each branch circuit panelboard. Revise
directory to reflect circuiting changes required to balance phase loads.

H. Provide engraved lamicoid nameplates under the provisions of Section 16195.

I. Provide spare conduits out of each recessed panelboard to an accessible


JO/EWO

location above ceiling or below floor. Minimum spare conduits: 5 empty 25mm (1
inch.) Identify each as SPARE.
DATE

J. Provide Arc Flash and Shock Hazard Warning Labels in accordance with G.I.
7.21
NO.
REV

DISCIPLINE
ENGINEER
3.02 FIELD QUALITY CONTROL
BOS
DATE: 8-23-17 A. Measure steady state load currents at each panelboard feeder, rearrange circuits
PROJECT
ENGINEER in the panelboard to balance the phase loads to within 20 percent of each other.
AFB Maintain proper phasing for multi-wire branch circuits.
DATE:
8-24-17
CERTIFIED
00-00-16
B. Visual and Mechanical Inspection: Inspect for physical damage, proper
HAK
alignment, anchorage, and grounding. Check proper installation and tightness of
8-24-17
DATE: connections for circuit breakers.
CONSTRUCTION
AGENCY
SIM
9-20-17
DATE:
OPERATIONS - END OF SECTION 16470 - DISTRIBUTION PANEL-
ASB
DATE:
9-25-17
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 103
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
ENGG CERT
DESCRIPTION

PART IV - DRAWING COMPLETION CERTIFICATE

TABLE OF CONTENTS
JO/EWO

1.0 SIGNED DRAWING COMPLETION CERTIFICATE


DATE

2.0 LETTER OF 100% REVIEW BY DHALPD (Not


required)
NO.
REV

DISCIPLINE
ENGINEER
BOS
DATE: 8-23-17
PROJECT
ENGINEER
AFB
DATE:
8-24-17
CERTIFIED
00-00-16
HAK
DATE:
8-24-17
CONSTRUCTION
AGENCY
SIM
9-20-17
DATE:
OPERATIONS

ASB
DATE:
9-25-17
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________


17U092-092

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FULL VOLTAGE CONV. HOUSE TYPE 3TR3S DOC


RE-778890 104
RESIDENTIAL AREA
S65 A
of 00
RAS TANURA SAUDI ARABIA JO/EWO: 17U092 105
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017 100%
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
00

DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER

SIM

ASB
APPROVAL/CERTIFICATION REQUIREMENTS,

AFB

HAK
BOS

AGENCY
BY:

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

8-24-17
CERTIFIED

9-20-17
8-24-17
DATE: 8-23-17

9-25-17
OPERATIONS
00-00-16

CONSTRUCTION
(DCC) NO. _____________________ 17U092-092 DATE:
1.0

RAS TANURA
(AG-0012 EGG/CBP) ISSUE DATE: 10-08-2017
100%
RESIDENTIAL AREA
SCOPE OF WORK
FULL VOLTAGE CONV. HOUSE TYPE 3TR3S
DOC

SAUDI ARABIA
SIGNED DRAWING COMPLETION CERTIFICATE

S65
A
DWG.TYPE PLANT NO. INDEX

JO/EWO: 17U092
SAUDI ARABIAN OIL COMPANY

RE-778890
DRAWING NO.

of
105

105
SHT.NO.

00
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.