0% found this document useful (0 votes)
281 views1 page

Mooring Record

ship pms

Uploaded by

Nguyen Pham
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
281 views1 page

Mooring Record

ship pms

Uploaded by

Nguyen Pham
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

SURVEY AND CERTIFICATE STATUS

MOORING RECORD AND GUIDELINES


Vessel : Date: CLICK HERE TO GO BACK TO MINOR CERTIFCATES
MOORING LINES MOORING TAILS MOORING LINES-SHIPYARD-29.03.2011 SPARE LINES
Designed Designed
Brake Required Actual MBL Required Brake Required Actual MBL
(mt) Presently Size Actual (mt) Presently
Drum No. Holding MBL (mt) On Board
Material Construction In Use Since MBL (mt) Material In Use Since Holding MBL (mt) On Board (See In Use Since Location Number Material
(mm x mtrs) MBL (mt)
Capacity (MAX) (See Note 1) (MIN) Capacity (MAX) Note 1)
(mt) (mt)
1 26 43.3 60.0 PP 60 X 220 8 STRAND 18-Jun-14 82.2 NA NA NA 26 43.3 60.0 Mooring Ropes
2 26 43.3 60.0 PP 58 X 200 8 STRAND 29-Mar-11 82.2 NA NA NA 26 43.3 60.0 29-Mar-2011 Fcstle Store 5 PP
3 26 43.3 60.0 PP 58 X 200 8 STRAND 29-Mar-11 82.2 NA NA NA 26 43.3 60.0 29-Mar-2011
4 26 43.3 60.0 PP 58 X 200 8 STRAND 29-Mar-11 82.2 NA NA NA 26 43.3 60.0 29-Mar-2011
5 26 43.3 60.0 PP 60 X 220 8 STRAND 18-Jun-14 82.2 NA NA NA 26 43.3 60.0 Aft Rope Store 2 PP
6 26 43.3 60.0 PP 60 X 220 8 STRAND 18-Jun-14 82.2 NA NA NA 26 43.3 60.0
7 26 43.3 60.0 PP 58 X 200 8 STRAND 29-Mar-11 82.2 NA NA NA 26 43.3 60.0 29-Mar-2011
8 26 43.3 60.0 PP 58 X 200 8 STRAND 29-Mar-11 82.2 NA NA NA 26 43.3 60.0 29-Mar-2011 Rope Tails
9 26 43.3 47.5 PP 56 X 200 8 STRAND 29-Mar-11 65.1 NA NA NA 26 43.3 47.5 29-Mar-2011 Fwd Store 0
10 26 43.3 47.5 PP 56 X 200 8 STRAND 29-Mar-11 65.1 NA NA NA 26 43.3 47.5 29-Mar-2011 (Rope tails)
11 26 43.3 47.5 PP 56 X 200 8 STRAND 29-Mar-11 65.1 NA NA NA 26 43.3 47.5 29-Mar-2011 Mooring Wires
12 26 43.3 47.5 PP 56 X 200 8 STRAND 29-Mar-11 65.1 NA NA NA 26 43.3 47.5 29-Mar-2011 Fcstle Store 0 GSWR
13 26 43.3 60.0 PP 60 X 220 8 STRAND NEW 82.2 NA NA NA 26 43.3 60.0 Midship Store 0 GSWR
14 26 43.3 47.5 PP 56 X 200 8 STRAND 29-Mar-11 65.1 NA NA NA 26 43.3 47.5 29-Mar-2011
15 26 43.3 47.5 PP 56 X 200 8 STRAND 29-Mar-11 65.1 NA NA NA 26 43.3 47.5 29-Mar-2011 Joining shackle
16 26 43.3 47.5 PP 56 X 200 8 STRAND NEW 65.1 NA NA NA 26 43.3 47.5 Deck Store-"B" Deck
17 26 43.3 47.5 PP 56 X 200 8 STRAND NEW 65.1 NA NA NA 26 43.3 47.5
18 26 43.3 47.5 PP 56 X 200 8 STRAND 29-Mar-11 65.1 NA NA NA 26 43.3 47.5 29-Mar-2011
19 26 43.3 47.5 PP 56 X 200 8 STRAND 29-Mar-11 65.1 NA NA NA 26 43.3 47.5 29-Mar-2011
20 0.0 0.0

Fire Wire Requirements (with


Notes:
certificate)
Diameter
kDWT (mt) Length (m)
(mm)
1. Vessels where the actual equipment onboard does not
comply with the requirements should raise requisition in a <30 28 70
phased manner to bring it in line with the requirements.
30-200 38 110

>200 42 110
2. All wires including Fire Wires must be 6x37 IWRC
class construction.
Construction: 6 X 36 IWRS

3. Only Polyester / Polyprop mixture fiber should be


requisitioned for mooring ropes. Polypropylene or
Polyethylene is not acceptable.
Poop Deck Main Deck Aft Main Deck Fwd Forecastle

Drag the symbols onto the deck diagram above.


Mooring Equipment
Open Tongue Bar-Type 5. Special care must be taken to ensure that the end of
Bitts
Chock Stopper Stopper the wire rope eye which connects to the shackle is kept
Closed
well lubricated at all times to prevent corrosion wastage.
Cruciform Bitts Smit Bracket Pedestal Fairlead
Chock

FILE: MA 22 M/TE01-05/12

You might also like