Ref : MVG/24/HIR/11
HAZARD IDENTIFICATION RISK ASSESSMENT RISK Revision : 00
CONTROL Date : 4 July 2024
Pages : /3
MARVELLOUS GARDEN [Link]. PROJECT : D’ STARLINGTTON TELUK KUMBAR
ACTIVITY : Plastering & Skim coating
RISK RATING CONTROL MEASURE/
HAZARD GROUP & POTENTIAL LEGAL & OTHER
SEQUENCE OF JOB Prob Sev. Total RECOMMENDATION
POTENTIAL HAZARD RISK REQUIREMENTS
. (P x S)
[Link] / 1. Mechanical – Struck by / Hit by 1. Fatality or Part II B.O.W.E.C. 2 4 8 1. All workers must be inducted
Delivery of the vehicle. serious body before commencing of work.
Materials injury. 2. Ensure crane has current
certificate as well as competent
2. Physical / Gravitational – Hit 1. Fatality or Part IV B.O.W.E.C 1 4 4 operator.
by the materials serious body 3. The un-loading area must be
injury barricaded / cordoned.
4. To obtain Permit To Work from
MVG authorized person for any
lifting operation using cranes
(More 0.5 tan).
4. All workers must be briefing
before commencement and weekly
toolbox talks to explain the
hazards and risk.
5. All workers must use proper
P.P.E.
[Link] the Mortar [Link] / Gravitational 1. Minor or FMA (BOWEC) 3 2 6 1. All workers must be inducted
– Hit by Serious body Part II Preliminary before commencing of work
material/falling object. injury 5& 10 2. The Activity shall be carried out
FMA (BOWEC) 3 2 6 by competent/experienced
2. Mechanical 2. Minor or personal and supervised.
1
Ref : MVG/24/HIR/11
HAZARD IDENTIFICATION RISK ASSESSMENT RISK Revision : 00
CONTROL Date : 4 July 2024
Pages : /3
MARVELLOUS GARDEN [Link]. PROJECT : D’ STARLINGTTON TELUK KUMBAR
ACTIVITY : Plastering & Skim coating
–Hit by the moving Serious body 3. To comply with the electrical
part of the machine. injury Safety procedure (All Electrical)
SEQUENCE OF JOB HAZARD GROUP & POTENTIAL LEGAL & OTHER RISK RATING CONTROL MEASURE/
POTENTIAL HAZARD RISK REQUIREMENTS Prob Sev. Total RECOMMENDATION
. (P x S)
[Link] 3. Serious long- USECHH Reg. 2000 3 2 6 equipment must be regularly
. -Inhalation term injury- BOWEC Part III Checked by competent person, live
-Absorption irritant and electric cable must be hangover
minor skin burn. head level).
4. Do not eat, drink or smoke when
handling chemical.
5. If contact with skin or eyes wash
with large amount of water
immediately.
6. Wash hand before eating.
7. MSDS to be made available as
reference.
8. All workers must use proper
P.P.E.
[Link] & skim [Link] / Gravitational 1. Serious Part III B.O.W.E.C 3 4 12 1. All workers must be inducted
coating -Fall of person or hit by falling body injury / before commencing of work.
- Scaffolding object. fatality. [Link] provide proper working
- Ladder platform (working platform must
- Gondola 2. Kinetic - Cut by sharp angle / Regulation 1989 Part 2 2 4 be fully barricaded, secured, the
materials 2. Minor injury II B.O.W.E.C. plank
must be wide enough as per
2
Ref : MVG/24/HIR/11
HAZARD IDENTIFICATION RISK ASSESSMENT RISK Revision : 00
CONTROL Date : 4 July 2024
Pages : /3
MARVELLOUS GARDEN [Link]. PROJECT : D’ STARLINGTTON TELUK KUMBAR
ACTIVITY : Plastering & Skim coating
scaffolding requirement and
provide with proper access and
egress).All scaffolding erection
( more than 2 m) must erected by
competence scaffolders.
3. The Activity shall be carried out
by competent/experienced
personal and supervised.
4. Ensure all statutory equipment
has valid certificate of fitness
5. If contact with skin or eyes wash
with large amount of water
immediately.
6. Wash hand before eating.
7. All workers must wear proper
PPE.
Activity carried out by SUB-CON : Prepared by: Reviewed by: Approved by:
___________________
___________________
Person In-Charge : Name : Name : Name:
Date: Date : Date :