INFORME Nº: 230082IINMAD-IIN01-IF05
REPORT Nº:
PÁGINA: 1 de 6
PAGE: of
CLIENTE: PROYECTO: LINEA SUBMARINA DE
CLIENT:
DEMEM S. PROJECT: CONCHAN
Nº PEDIDO: FECHA Y REV. PEDIDO:
DMML-053-SUB NA
ORDER Nº: ORDER DATE AND REV.:
PROVEEDOR: Shandong Molong Petroleum Macinery DIRECCION: No. 999 Wensheng Street Shouguang
SUPPLIER: Co., Ltd ADDRESS: city, Shandong Province China
SUB-PROVEEDOR: DIRECCION:
Bao Steel
SUB-SUPPLIER: ADDRESS:
PERSONA DE REFERENCIA DEL
CONTACTO: Mr. Lixiaoyuan PROVEEDOR: NA
CONTACT PERSON: REFERENCE Nº:
FECHA DE VISITA: PROXIMA VISITA:
11th, Dec 2023 To be confirmed
VISIT DATE: NEXT VISIT:
DESCRIPCIÓN DE MATERIALES: Pipeline 457*19.05mm X DRL X42NO PSL 2
DESCRIPTION OF MATERIALS: Pipeline 406*19.05mm X DRL X42NO PSL 2
ASISTENTES: SCI Inspector Mr. Alex Tang
ATTENDEES: Factory Quaity coordinator Mr. Liu chao
INDICE
INDEX
1.- Alcance de la Inspección / Scope of Inspection
2.- Documentación Aplicable / Applicable Documentation
3.- Resultados / Results
4.- Observaciones / Remarks
5.- Asuntos Pendientes / Pending Subjects
6.- Adjuntos / Attachments
7.- Fotografías / Photographs
NOMBRE INSPECTOR:
ALEX TANG
INSPECTORS NAME:
FECHA:
11TH DEC 2023
DATE:
POSITION INSPECTOR: ALEX TANG
MAJOR: MECHANICAL INSPECTOR
FIRMA & SELLO: DEGREE: MECHANICAL
SIGNATURE & STAMP: ALEX TANG
FORMATO Nº 760 Rev.00
INFORME Nº: 230082IINMAD-IIN01-IF05
REPORT Nº:
PÁGINA: 2 de 6
PAGE: of
CLIENTE: PROYECTO: LINEA SUBMARINA DE
CLIENT:
DEMEM S. PROJECT: CONCHAN
Nº PEDIDO: FECHA Y REV. PEDIDO:
DMML-053-SUB NA
ORDER Nº: ORDER DATE AND REV.:
1. ALCANCE DE LA INSPECCIÓN
SCOPE OF INSPECTION
SCI inspector Mr. Alex Tang visited to Inner Mongolia to carry out the inspection as client request from 11th Dec 2023
and detailed refer below description.
1. Hydro test (step 19 of ITP)
Level of inspection: 10% randomly witness
- SCI inspector reviewed calibration certs of pressuge gauge and found in valid.
- Total 128pcs pipes were presneted to hydro test from 28th Nov ~ 1st Dec 2023. SCI inspector witnessed hydro test
for about 30pcs pipes and the results are satisfied with spec and ITP requirements.
Heat No. 23707782、23707781、23707784、23707779、23707783、23707781、23707780.
- Lot No.:2311410488-2311A20187、2311410486-2311A20185、2311410487-2311A20186、2311410485-
2311A20184、2311410489-2311A20188、2311410486-2311A20242、2311410484-2311A20183
-
- Total 107pcs pipes were presented to hydro test from 10th ~11st Dec 2023 and SCI inspector witnessed hydro test
about 25pcs pipes and the results are satisfied with spec and ITP requirements.
Heat No. 23707782、23707785、23707781、23707784、23707779、23707780
- Lot No.:2311410488-2311A20187、2311410490-2311A20189、2311410486-2311A20185、2311410487-
2311A20186、2311410485-2311A20184、2311410484-2311A20183
Required pressure value: 25Mps
Actual pressure value: 25Mpa
Duration time: 5seconds
Heat No. / Lot No. 1# 2# Total Qty
2311410488-2311A20187 6 34 40
2311410490-2311A20189 0 12 12
2311410486-2311A20185 10 13 23
2311410487-2311A20186 23 15 38
2311410485-2311A20184 22 18 40
2311410489-2311A20188 38 0 38
2311410486-2311A20242 13 0 13
2311410484-2311A20183 16 22 38
Total: 128 114 242
Comment:
- Total 7pcs pipes failed to pass to the first UT test but these pipes were polished by vendor, then these 7pcs pipes
were passed to 2nd UT test after polished.
So total 7pcs pipes were presented to hydro testing after inspection plan scheduled. So inspector didn’t witness
hydro test for thee 7pcs pipes.
The inspector reviewed and checked the hydro test records and curve of these7 pipes, these records and curve
were satisfied with ITP requirements.
The traceability information for 7pcs pipes:
Heat No. / Lot no. 2311410484-2311A20183: 5pcs
- Heat No. / Lot no. 2311410486-2311A20242 1pcs
- Heat No. / Lot no. 2311410485-2311A20184 1pcs
FORMATO Nº 760 Rev.00
INFORME Nº: 230082IINMAD-IIN01-IF05
REPORT Nº:
PÁGINA: 3 de 6
PAGE: of
CLIENTE: PROYECTO: LINEA SUBMARINA DE
CLIENT:
DEMEM S. PROJECT: CONCHAN
Nº PEDIDO: FECHA Y REV. PEDIDO:
DMML-053-SUB NA
ORDER Nº: ORDER DATE AND REV.:
2. DOCUMENTACIÓN APLICABLE
APPLICABLE DOCUMENTATION
NÚMERO DE DOCUMENTO DESCRIPCIÓN REVISIÓN ESTADO
DOCUMENT NUMBER DESCRIPTION REVISION STATUS
API 5L Specificaiton for pipeline 46th Approved
ITP- ML-ITP-X42NO ITP 29-6-2023 Approved
RESULTADOS
3.
RESULTS
The inspection results are satisfied with ITP and API 5L PSL 2 requirements.
4. OBSERVACIONES
REMARKS
5. ASUNTOS PENDIENTES
PENDING SUBJECTS
1. Machining pip end
2. 3LPE Coating
6. ADJUNTOS
ATTACHMENTS
Nº DESCRIPCIÓN
Nº DESCRIPTION
1 Calibration certs for pressure gauge
7. FOTOGRAFIAS
PHOTOGRAPHS
FORMATO Nº 760 Rev.00
INFORME Nº: 230082IINMAD-IIN01-IF05
REPORT Nº:
PÁGINA: 4 de 6
PAGE: of
CLIENTE: PROYECTO: LINEA SUBMARINA DE
CLIENT:
DEMEM S. PROJECT: CONCHAN
Nº PEDIDO: FECHA Y REV. PEDIDO:
DMML-053-SUB NA
ORDER Nº: ORDER DATE AND REV.:
Pressure test Pressure test
Pressure test Pressure test
FORMATO Nº 760 Rev.00
INFORME Nº: 230082IINMAD-IIN01-IF05
REPORT Nº:
PÁGINA: 5 de 6
PAGE: of
CLIENTE: PROYECTO: LINEA SUBMARINA DE
CLIENT:
DEMEM S. PROJECT: CONCHAN
Nº PEDIDO: FECHA Y REV. PEDIDO:
DMML-053-SUB NA
ORDER Nº: ORDER DATE AND REV.:
Pressure test Pressure test
Pressure test Pressure test
FORMATO Nº 760 Rev.00
INFORME Nº: 230082IINMAD-IIN01-IF05
REPORT Nº:
PÁGINA: 6 de 6
PAGE: of
CLIENTE: PROYECTO: LINEA SUBMARINA DE
CLIENT:
DEMEM S. PROJECT: CONCHAN
Nº PEDIDO: FECHA Y REV. PEDIDO:
DMML-053-SUB NA
ORDER Nº: ORDER DATE AND REV.:
FORMATO Nº 760 Rev.00