0% found this document useful (0 votes)
101 views6 pages

Series of 2024: Office 0F The Secretary

Uploaded by

DPAIU NE2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views6 pages

Series of 2024: Office 0F The Secretary

Uploaded by

DPAIU NE2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Republic of the Philippines

•d-i![: DEPAR"ENT 0F PUBLIC WORKS AND HIGHWAYS


OFFICE 0F THE SECRETARY
Bonifacio Drive, Port Area, Manila
B^¢OHe plLlm\I^s

NOV 1 5 ZOZ+

DEPARTMENT ORDER SUBJECT: Issiiahce of Suspension Order to


WELD POWE RTOOLS AN D
CO N STRUCTIO N CORPORATION
NO. DOING BUSINESS UNDER THE
Series of 2024 NAME/S AND STYLE/S WELl}
\\\ltl2DQ1!1 POWERTO0LS AND INDUSTRIAL
dy
MACHINERY

Pursuant to Sec. 69.1 (i) Rule XXIII of the 2016 Revised lmplementing Rules and Regulations (IRR)
of Republic Act (R.A.) 9184, and in accordance with Department Order No. 28 series of 2024, this
Suspension Order is hereby issued against WELD POWERTOOLS AND CONSTRUCTION
coRpoiunoN DorNG BuslNEss UNDER THE NAME/s AND sTyLE/s WELD
POWERTOOLS AND INDUSTRIAL MACHINERY.

Based on the Approved Consolidated Three (3)-Strike Report, dated October 16, 2024, and posted
on the DPWH Intranet on October 30, 2024, this contractor/supplier, bearing the PhilGEPS
Registration No. 201704169494032150178 and located at 123 Matimtiman Street Sikatuna Village,
C)uezon Citv, Metro Manila, National Capital Reaion (NCR), has incurred four (4) strikes/offenses
within a year from the approval date of the Resolution Recommending the Imposition of Strike One
- First Warning. While the specific sub-offense categories vary between Implementing Offices
(District Engineering Offices) - namely (i) participation in bidding with incompatible business type as
indicated in the Business/Mayor's Permit, and (ii) submission of incomplete, insufficient, or defective
bid documents with missing mandatory provisions -all four (4) violations fall under the main strike
category of "Submission of Patently Insufficient Bid."

The detailed offenses are as follows:

Date OfApproval of
Strike-
Strike OFfense Category Contract ID and Issuing Resolution
Contract Name Procuring Rcommending
Entity the ImpositionofStrike

Patently InsufficientBid
24GNC0001- PurchasingofMaterialsforthe

(Participation in Repair/Maintenance of
bidding for Goods and Asphalt/Concrete
Services Contracts by Pavement (Patching of Agusan del Sur
Strike a bidder whose Potholes and Sealing of 2nd District
1 Business Type, as Cracks and Joints) along Engineering
March 19, 2024A
indicated on the National Primary and Office
Business or Mayor's Secondary Roads with
Permit, does not exceptions/intermittent
match or unrelated to sections. For FY 2024
the contract being bidfor,asdetermined (ist Quarfer)

® Website: [Link] [Link]


QBTel. No(s).: 5304-3000 / (02 ) 165-02 f+~SOC
Sc7,sorml
D.o. unseries of 2o24
Issuance of Suspension Order to WELD POWERT00LS AND CONSTRUCTION CORPORATION DOING BUSINESS
UNDER THE NAME/S AND STYLE/S WELD POWERT00LS AND INDUSTRIAL MACHINERY
Page 2 Of 3

during thepestqualificationpruess)

Patently InsufficientBid(Participationin

24GNC0002- Purchasing
bidding for Goeds andServicesContractsby of Materials for thePainting/Repaintingof

a bidder whose No/Faded Pavement


Business Type, as Markings (Edge Line & Agusan del Sur
Strike indicated on the Center Line) using 2nd District
March 19, 2024
2 Business or Mayor's Reflectorized Engineering
Permit, does not Thermoplastic Pavement Office
match or [Link] to markings along National
the contract being bid Primary & Secondary
for, as determined Roads (Fy 2024, |st
during thepostqualificationprocess) Quarter)

Patently Insufficient 24GLF0041-Supply and


Bid(Submission of delivery of [Link]

incomplete, national road (steel


i nsufficient, or Davao Oriental
bridge and concrete
Strike defective doc:u ments ist District
marker repainting) alongSurigaoSur-DavaoOrientalCoastalRoad July 30' 2024
3 due to the non- Engineering
inclusion and/or Office
omission of mandatory and Benigno S. Aquino
provisions and Jr. National Highway
statements for the Davao Oriental First
required bid forms) District

Patently InsufficientBid(Submissionofincomplete,

24GLF0 45- Sup ly and eliveryofasphaltforuseinresealing/[Link]

Davao Oriental
Strike insufficient, or
4 defective dcx:uments
|st District
Engineering
July 30, 2024Aey
due to the non-inclusionand/oromis ionofmandatoryprovisionsandstatementsfortherequiredbidforms) Office
D.O. nlseries of 2o24
` Issuance of Suspension Order to WELD POWERT00LS AND CONSTRUCTION CORPORATION DOING BUSINESS
UNDER THE NAME/S AND STYLE/S WELD POWERTOOLS AND INDUSTRIAL MACHINERY
Page 3 of 3

WELD POWERTO0LS AND CONSTRUclloN CORPORATION DOING BUSINESS UNDER THE NAME/S
AND STYLE/S WELD POWERTOOLS AND INDUSTRIAL MACHINERY is disqualified from participating
in any DPWH bidding processes, effective immediately upon receipt of the Notice of Suspension.
This suspension shall remain in effect during any period of reconsideration or appeal until a final
decision is rendered by the Office of the Secretary. However, this suspension does not apply to the
contractor's participation in procurement activities of other government agencies.

This Order shall take effect immediately.

Depade%rfTcoPuoO,0'(:.W##H4hays

IIIIIIIllllnlmllllnllllll'lHlllIll

WIN4A800282
Encl : 1. Approved Consolidated Three (3)-Strike Report for Patently Insufficient Bid as of October 16, 2024

12.1 MVSG/MSV/MAP
Republic Of the Philippines

:.!i![: DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


CENTRAL OFFICE
Manila

C. CONSOLIDATED STRIKE REPORT FOR SUBMISSION OF PATENTLY INSUFFICIENT BID


As of October 16, 2024

Strike Perl od Coverage


ErTliig B]dder/ Elm Str'ke 1 Sthke 2 Owke 3 Sthke 4 Strike 5 Sthke 6 Date Conmenco(DateofApprovalOfistSmke)
Date Explry(1Year-)

EApproval Irate:March8.2024Stnke-Is uingOf [Link]

1. LONGBOANCONSTRUCTION
March 8. 2024 March 8. 2025

E]Ap roval Date:March8.2024Stnke-Is uingCif [Link]

2. ARUNEYCONSTRUCTION
March 8. 2024 March 8. 2025

E EI E a
Approval Date: Approval Date: Approval Date: Approval Date:
3. CORLEONE
March 11. 2024 March 11. 2024 March 11. 2024 March 11. 2024
CONSTRUCTION March 11. 2024 March 11. 2025
SERVICES`
Stike-Issuing Office. Stnke-Issuing Office. Stnke-Issuing Offlce. Strike-Issuing office.
Bukidnon 2nd DEO Bukidnon 2nd DEO Bukldnon 2nd DEO [Link] 2nd DEO

4. TJB CONSTRUCTION BLACKLISTED FOR TV\/O (2) YEARS, FROM SEPTEMBER 26. 2024 UNTIL SEPTEMBER 26- 2026 PER DEPAR"ENT ORDER (D.O.) 171 SERIES OF 2024

Page 1 of 22
REke Peri edcoveng `
Erring alddtr/ Fin sofke 1 ELke 2 Stike 3 Sbik€ 4 Strike 5 S6rik® 6 Doe onmema(DateOfApprovalOfFSue)
Date Expiry{1wearperio®

EApproval Date:ADri 12.2o24Sdike-Is [Link] ice11

20. KLD ENGINEERINGCONSTRUCTION


ADrii 12. 2o24 At]rii 12. 2025

aApproval Date:Mav15.2024 EApproval Date:June19.2024

21. 2M.G. SALJVARCONSTRUCTION


May 15. 2024 May 15. 2025
cORroRAiioN
Stnke-Issuing Cifflcf!.SorsooonlstDEO Stnke-Issuing [Link]

EApproval Date:Mav15.2024 EApprunl Date:Julv2.2024


22. E. GARCIACONSTRUCTION
Mav 15. 2024 Mav 15. 2025
cORPORAlloN
Strlke-Issuing [Link] Stnke-Issuing [Link]

a EI a E
Approval Date: Approval line: Approval Date: Approval Irate:
23. WELDrowERTOOLDs &[Link]. March 19. 2024 March 19. 2024 Julv 31. 2024 Julv 30. 2024
March 19. 2024 March 19. 2025
Strike-Issuing offlce. Stnke-Issuing office. Strike-Issuing Office. Stike-Issuing office.
Aausari del Sur 2rid Aausan del Sur 2nd Davao oriental lst Davao Oriental lst
DEO DEO DEO DEO

EIAp roval Date:May27.2024Strike-Is uingof [Link] identalDEO

24. SOLAR TRAFFIX May 27. 2024 Mav 27. 2025

Page 5 of 22
Stlke Peded Coverap
Errln. BIdder/l]m Sun I. ankI 2 Srfu 3 Strlb +I Strh 5 Stlfe 6 ) Date conrrienei(4aeo,###'ct T Dab Ertyry`iyeBHow

I]ljiv1.205
a I
(
I Juiv 11-21124

105, MapWORLDWIDE -Ddt,]ulvii.m24 i

SOLUTIONS, INC.
soike-E5suino [Link]|ls[DEo i

+-----
dApprrral lan:
IIi
)

i( ]ulv tl. 2025 i


106. EMMB
Juiv 11. [Link]
cONSTRLJCTI0NANDSUPPLIES I Julvll.2024)(

dApproval Date:

107. BF RETAILANDDIS7RIBulloNCORP. Auoust 14. 2n24Strike-L5songorficeDavaoOrlentallit !i

Auaust 14. 2025

( frondi4 2024 i
BEQ I I I

- Refers to Depertr"t Ortr89, series of 2024; 2 Rde to Departhent Order 90, series Of 2D24; 3 Refers to Deparfroent Chtr 108, sedes of 2o21; 4 heifers to Depertwl ordei. 108, series of 2024;
5 Refers to Department orcler 172 series Of 2an

Prepared by: Rcommendlng Approval: Approved by:

cdy
MAftlciill A. pALAEo)L cEso n
Undersecilefary for Support Services

Page 22 of ZZ

ve/

You might also like