GIC SHO
New AP Mount
Report
By: Jack Zhang
Attn: Nikki Fang
Date: 2023-08-06
For GIC SHO
By NETK5 August,2023
Table of Contents
1 Project Overview...............................................................................................................................3
1.1 Executive Summary...................................................................................................................3
1.2 Project Deliverables...................................................................................................................3
2 Methodology......................................................................................................................................3
2.1 Dust Protection.......................................................................................................................... 3
2.2 New Patch Panel........................................................................................................................ 3
2.3 Label Example For All The Devices..........................................................................................4
2.4 IT Room After Project............................................................................................................... 4
3 Comment........................................................................................................................................... 4
1 Project Overview
In order to make sure all area have a better signal in GIC SHO site, so we plan this project to use
the new AccessPoint and WLCs, so we need to install the new cables for the new Aps.(Because the
old cable may will have issue in the future, they have been using for a few years.
Existing AP locations on Map
New AP Mount Report Page 2/22
For GIC SHO
By NETK5 August,2023
New AP locations on Map
1.1 Executive Summary
Mount all the new APs and install the new cables for them, install the new WLCs in the rack and
connect them to the swithes.
1.2 Project Deliverables
All the APs location photos in the Office
Setting photo (close view) Setting photo (long-range view)
New AP Mount Report Page 3/22
For GIC SHO
By NETK5 August,2023
New AP Mount Report Page 4/22
For GIC SHO
By NETK5 August,2023
New AP Mount Report Page 5/22
For GIC SHO
By NETK5 August,2023
New AP Mount Report Page 6/22
For GIC SHO
By NETK5 August,2023
New AP Mount Report Page 7/22
For GIC SHO
By NETK5 August,2023
2 Methodology
In order to make the site stay clean and make the patch panel install perfectly, so we prepare some
tools to achieve this goal.
2.1 Dust Protection
New AP Mount Report Page 8/22
For GIC SHO
By NETK5 August,2023
New AP Mount Report Page 9/22
For GIC SHO
By NETK5 August,2023
New AP Mount Report Page 10/22
For GIC SHO
By NETK5 August,2023
New AP Mount Report Page 11/22
For GIC SHO
By NETK5 August,2023
New AP Mount Report Page 12/22
For GIC SHO
By NETK5 August,2023
New AP Mount Report Page 13/22
For GIC SHO
By NETK5 August,2023
New AP Mount Report Page 14/22
For GIC SHO
By NETK5 August,2023
New AP Mount Report Page 15/22
For GIC SHO
By NETK5 August,2023
New AP Mount Report Page 16/22
For GIC SHO
By NETK5 August,2023
2.2 New Patch Panel
This is the new patch panel with the labels on it, please check it. (The new patch panel is
installed in 24U of Rack 3)
New AP Mount Report Page 17/22
For GIC SHO
By NETK5 August,2023
2.3 Label Example For All The Devices
AP Label Example
New AP Mount Report Page 18/22
For GIC SHO
By NETK5 August,2023
Cable Label Example(Switch and WLC side)
New Cable Label Example (AP side)
New AP Mount Report Page 19/22
For GIC SHO
By NETK5 August,2023
New WLC Label Example (The new WLCS are installed in the 21-22U of Rack 3)
New AP Mount Report Page 20/22
For GIC SHO
By NETK5 August,2023
2.4 IT Room After Project
3 Comment
For the other details about the new APs, new WLCS and patch panel, please check the attachments
in the email, thanks for your time.
New AP Mount Report Page 21/22
For GIC SHO
By NETK5 August,2023
Thank You!
[Link]
[Link]
New AP Mount Report Page 22/22