Abdul Rahman
Construction Electrical supervisor
Mobile: QA: 97470526503, IN: +919600923524: Email:
[email protected],
LinkedIn: https://www.linkedin.com/in/abdul-rahuman-rahuman-16942048
Career summary:
Total Twenty (20+) years cumulative work experience in the field of Engineering, Construction
management and planning execution pre-commissioning commissioning start-up coordination.
With PMC, EPC, EPCI companies. Particularly in Petrochemical plant, Oil & Gas Refineries, Power&
Water, industrial mining plant utilities substation, 875.5MWH solar PV plants and other similar
Heavy Industrial environment. Acquired extensive experience in all phases of construction having
occupied key positions as senior Electrical Engineer, Electrical superintendent, Electrical
Supervisor. Conversant with industry’s standard codes and specification.
Education:
2006 Bachelor of Technology in Electrical & Electronics Engineering.
2003 Diploma in Electrical and Electronics Engineering
Computer skills:
MS word Excel, power point, outlook, Knox, Auto CAD, SAP, tally 7.1, programming in C,
Certification, Hardware and Networking, office Auto Mation.
Areas Of Expertise
Project Management / Critical Path analysis
Client Liaison / sub con. Supervision & Leadership / Risk Assessment /Health & safety
Manpower Planning / Scheduling Working from drawings
Material handling / Problem Solving Inspection / Compliance
Conversion /New Bills/ Final Handovers Cost Control
Testing and Commissioning /punch list closing / document hand over
Progress Reporting /work scheduling /design review and implement
Training:
Transformer Installation (Best, Turkey)
Quality of Tools and Equipment.
Basic Fid Aider and CPR (Enertech from Qatar)
LOTO substation (petro Rabigh, Tecnimont)
LOTO Equipment (Arceler Mittal)
Work Experience:
Oct 2023 -Till Now
Project: THE 875.5MWP Qatar Energy Industrial cities solar power project Located at Ras
Laffan and Mesaied, state of Qatar.
Company: Samsung C&T
Position: construction Electrical Engineer Interface
Worked as An EPC representee responsible for erection testing and PRE-Energization and
ECF, ECC walkdown start -up coordination for the completed system packages: 220
GIS ~33kv Switch gear Building ~33/800V MV Station~32KVA invertors.
Siemens makes 220 KV GIS, GE makes SUT33/220kv 144 MVA Transformers 3 Nos, TMS,
LCC, Relay panels, PQM.
ABB Make 33kv Switchgear Zs2 3 Nos belong busbar production and FMS panels
SANMWAH make 5 MAVR 5 step 25 MVAR capacitors 376 KVA rectors
Cumins make 1 MW EDG, LVS, RTU
Hyosung Make 1500KVA Dry Type Transformer and LV swgr Essential lighting HV AC main
sub dbs.,
Chloride makes 145Ahx3Batteries and charger main &security systems. *
SUT 220kvTR~ 33kvSWG~ 33KVMVS ~HV/MV /control/FO cable pulling termination and
testing.
Fabrication of cable tray cable and panels and supports.
coordinate with interface contractor vendor third parties, supplier, client QATAR Energy,
EDF, consultants
Review implements approve installation erection Lifting Activities method of statement,
JSA, SAT procedure, pre- Energization ECC, ECF form, check list,
Prepare project Material request, MAR, material sample, PO and Negotiate with supplier
third parties.
Advanced planning and Prepare 2week ahead work schedule.
Proposal to client for ECC, ECF, PCF Walk through completed package (pre-commissioning
commissioning) hand over Activities.
Punch list A~B~C categorization and closed out. Prior to starting the testing and
commissioning Activities.
Coordinate with commissioning team commissioning and Energization Activities
daily walk-through of construction areas, confirming efficiency of the work and compliance
with the planned daily activities and overall construction schedule.
Supervision and witness of SAT implementation
Feeder Bay modification & inter panel wiring.
Prepare red marking final as build and hand over to Qatar Energy /EDF Team.
daily walk-through of construction areas, confirming safety standards are maintained,
Review of contractors daily weekly and monthly reports analyzing performance and
verifying progress and status.
Participate in constructability and construction readiness review identifying improvement
opportunities with contractor team.
Understand the Advanced Work Pack process, confirming alignment with path of
construction review progress identifying constraints and mitigations.
Monitor guidance to Contractor to ensure key electrical deliverables, progress/milestones
are achieved.
Attending onsite safety meetings and toolbox talks to ensure there is a clear understanding
of the activities that are to be performed.
Ap2020-Nov2021
Project: 10MW Genset power plant /Guyan gold process plant & 2MWcrusher plant, Najran
Saudi Arabia
Position: Sr. Electrical Engineer
Works as client represent for the construction & pre-Energization and MC Walk down for
the completed system packages upon invitation of EPC Contractor for the Following
system.
ABB Make (turkey) 11kv RMU /1000KVA 3 Nos, Transformers (3nos) and Ups battery charger
UG /AG race way E&I cable Tray, JBS, supports, fabrication and conduit indoor outdoor
lighting Lightning grounding system.
Witness of 3cx75sqmm11kv cable splicing HI pot, INR. Continuity, instrument loop
checking& I/O 4~20MA, Relay functional scheme check,
Mechanical and electrical functional test/timing /CRM Test for Vacuum circuit breaker Test
and CT, PT, HV Test, stability of busbar.
MCC motor management relay auto/manual and local/remote scheme, Motor solar run
test, VSD, VFD Function run test @4-20mA command signal ,2mw crusher plants &630kw
ball mill, Air compress, Fire &raw water centrifugal pumps, and sump pumps roller belt
Conyers.
Local control panels &control Desk, Star Delta power and control Scheme, HMI, FT, LT,
Sensor, Limit switches.
Implement Engineering Design Drawings as per IEC, NEMA, Local Engineering standard.
Monitor contractor erection work and as per standard Complaints against contractor.
Generate punch list and closing.
Approve construction method of Statement, QA/QC document and do inspection of
Electrical instrumentation installation as per ITP and mange record all technical query and
provide continues assistance to Engineering to solve site related issues
Aug 2018- Dec 2019
Project: Petro Rabigh sulfur recovery clean fuel Unit.
Company: Tecnimont S.P.A (EPC), Saudi Arabia
Position: construction Electrical supervisor.
Works as EPC represent and oversee for the construction pre-commissioning
commissioning coordination And Walk 66through with client for the Mechanical completion
pre- Energization hand over complete package respective following system.
4.16kv Switchgears, 2 MVA transformers 2 NOs,2 MVA generator, ATS, MTS, ANN,
VFD.MCC,50 KVA r capacitor Ups battery charger, AC/DC distribution panels, lighting
panels, Relay panels, ANN alarm panel, HV AC, Fire alarm system
MV/LV cable pulling splicing termination& HI pot, INR
Wideness of solar Run Test for MV compress motors, system deluge pumps& MCC motor
management relay auto/manual and local/remote scheme, PI, phase sequence & Rotation,
RPM, current rating voltage Rating, class of winding temperature, IP, continuity, End to End
Loop check I/O, Ups battery charging Discharging Test.
VCB mechanical operational check trip & functional check CRM, timing test.
Visual Inspection of MVLV switch gear relay panels, inter panels wiring Tag checking.
Carryout subcontractor installation erection Work As per AFC Drawing & IEC 60079-14
&60079-17
Immediately reply to technical query, site Engineering, Technical issue, red line, revision.
Clear all punch list Item.
Liaise with client and coordinate with contractor vendor supplier third parties’ civil
mechanical team.
Negotiation with contractor new amendment, Manpower, timesheet.
Review contractor installed item BOQ and verify at site Actual original BOQ.
Implement LOTO system, HOT/cold work WPT system for Energized panels/Equipment’s.
Dec2016-July2018
Project; Jizan Aramco refinery terminal utilities project EPC -13
Client; Saudi Aramco
Company; Hitachi Limited, EPC 13. Position; construction Electrical supervisor
Works as an EPC Representee response for construction pre-commissioning of 132kv
GIS/13.8/4.16kv distribution &utility substation &completed 580 KM cable pulling splicing
TERMINATION FOR 18 substations and hand over following system
o Alstrom make 12 bay, 132kv GIS, ABB make 132/13.8kv transformers, 13.8kv, 4.16kv
WASCOSA Transformer MV/LV metal glad switchgear control gear, try type transformer,
lighting panels.
UG (Sumitomo Japan) make 132kv cable& and cable pulled approved method of standard
vendor instruction. standard specification including cross link BOX installation& ponding
work
AG 13.8kv 4.1kv (Riyad cable make) cable pulling Trifole formation through race way cable
tray &installed cable clamp each. As per Aramco standard
Monitor Dewatering pump room 7 no’s & street lighting 1250 Nos such as JBS cable
glanding termination.
As per schedule Priority of cable pulling follow up with civil team do inspection rooting of
HV/MV/LV telecommunication cable Trench, Duct bank, Joint Bay, cable tray, conduit
Supports, manhole.
Coordinate with Other EPC Engineering team &resolve inter connection IP point issues as
per contractual.
Approve Moke up, sample, method of statement, Extra work time sheet, new contract
amendment PO
o Prepare NCR, violation, and punch list, against the contractor as per the Aramco, IEC, and
NEMA standard spec.
May 2015 to Oct 2016
Project- Saudi National Grid 132KV, SS hail and ARAR KSA.
Company: ALFANAR Construction Riyadh, Saudi Arabia
Position; Electrical site Engineer.
Installation of Hyosung Korea make 132kv GIS (BEST Turkey make)132/13.8kv 50,65mva
power transformers),surge arresters,(HYOSONG)132kv GIS,PCC, control
panels,(Alfanar)13.8kv switch Gear ,AC,DC panels, Capacitor banks,13.8kv NER(National
make India),RMU (schinder make)Alfanar make(13.8/400v) Auxiliary transformers (2nos),
125VBattery charger unit, UPS and Distribution bypass panels, Battery Disconnect or
isolator
Material request, MQR approval and installation of cable ladder, Cable tray, AC, DC 60w,
electrical steel and PVC Coated, RGS Flexible conduits and lighting fixture, Exit, Emergency
lights, outdoor lighting, Indoor outdoor Auxiliary power sockets,
Disconnect switches, grounding and lightning systems.
Monitoring HV, MV, LV, and Telecommunication ducts banks Activities.
Resolve all site NCRS, engineering issues and closing all punch lists.
POSITION; construction Electrical superintendent
RESPONSIBILITY:
Timely completion of job under the project cost
Safe Execution of the project.
Organization site staff, Engineers, supervisor foreman Electrical labor.
Overall E&I installation Material request special tools manpower request and getting
approvals.
Conduct material receiving inspection as per standard specification and timely send to the
site.
Prepare technical query, RFI, installed Item BOQ, PO, red line, revision, final as build
Conduct key planning and scheduling for electrical construction.
Prepare shop drawing final as build and response project End to End.
For testing and commissioning coordinate with Siemens (Saudi), ABB vendors (fin land) GE,
Alstrom, Yokogawa, Honeywell, Schneider, CAT, Saudi crane, Kone Elevator, AEG, wescosa
3 G cooper, FURSE grounding.
Walk through with client for the mechanical completion and package pre-commissioning
commissioning hand over Activities.
Review inspected, UN completed, RFI NCR Talk with client and closes for the comment.
Mobilization and demobilization manpower Equipment as per planned schedule.
Negotiation with client regards back charge contract new amendment Bill claim.
Prepare temporary faculty project design load calculation Equipment sizing and material
request approval
Prepare daily weekly progress report updating to project management team.
Review segregates A&B client punch list item hand over for pre-commissioning and
updating to client .
Close out all punch list item for pre-commissioning commissioning Activities.
Walk through with client QC and note down they are comment and close out. as per
standard
Project 1: Yanbu Aramco Sinopec Refinery Company EPC 1 cooker unit
Company: NSH, Main contractor :Tecnicas Reunidas
Work as sub-contractor represent, and Responsible for Construction and pre- Energization
and MC walk down for the mechanical completion complete package with client for the
coke drum& Colling Tower hand over pipe rack MV /LV various Equipment.
Normal and Emergency power LV switch rack, Distribution panels board, power and
Emergency Try type 380V transformers, circuit breakers and, 100A disconnect switches,
local control panels, Emergency shutdown switches, Monorail, AC/DC 63 A welding
convince sockets, JBS,70w,100w,120w,400w(halogen) outdoor strangan, wall mounted,
structure, celling mounted, staircase monkey ladder, becan and, wind suck lighting
Cable pulling Testing Termination of 4.16kv, 900kw compressor Motors 480V 5.15kw fin fan
motors, 5kw belt conveyor motors, MOV, coke drum control Desk, lift Motors control
panels and disconnect switches, 4.16kv maintenance crane.
Fabrication, Modification installation of E&I cable tray grounding and lightening systems.
Daily punch list item closing and updating to Aramco.
Project 2: Cristal Titanium Dioxide smelter plant –Jizan
Company: NSH contractor: Outotec Finland
Our scope of work including construction and pre-commissioning of 132kv substation such
as Equipment Installation testing and coordination of ABB make 132kv GIS, (Siemens
make) 132kv/13.8kv, 25MVA Main Transformer, 13.8/6.6kv 2mva Transformers,
26bay13.8kv metal glad switchgears, 19bay 6.6kv metal glad switchgears
,13.8/6.6kv,5mva, Distribution transformers, LCC,MCC 13.8KV, 6.6KV NER, battery bank&
ups charging discharging system (CAT make) 13.8kv, 2mva diesel generators 2nos, ABB
make LV switch gears ATS panels MCC and control room cabinets, lighting small AC/DC
sockets, instrument, JBs, CCTV cameras, limit switches, censors, level transmitters, local
control switches, fire and gas detector and sounder, FACP panel. and fabrication
installation of indoor-outdoor lighting systems, EM, EMT, flexible PVC coated conduits,
cable ladders, lightning system, plant and building Lightning system overall grounding
systems, fire alarm system.
Cable pulling termination from Main 132kv GIS to Equipment load distributions such as
Electrical Furnace (Siemens make) 132/13.8KV, 10MVA, furnace transformers (6 no’s),
13.8kv capacitor banks 750 KVA r(2nos)13.8kv switch gears,13.8/.380kv,2.5MVA
distribution Try Type Transformers 2 (no’s) clarifier motors, cooling tower, sludge house.
Project 3: Arcelor Mittal Tubular production plant
Company: NSH ,Client : ARCELER MITTAL
Our scope of including construction and pre-commissioning of 115kv substation such as
Equipment installation of (ABB make) 115 kV main GIS, 115/13.8kv main transformers,
13.8kv switch gears, NER, 13.8kv, 1000KVAr capacitor bank, 100KVA Auxiliary Transformers
(2Nos)
50 KM Completed 3x600Sqmm MV Cable pulling termination from Main 115kv GIS to
Equipment Load LIKE ERO1 (hot mill substation, RHF, FINISHING LINE, ERO2, and 13.8kv
utility substations.
Erection and primary secondary cable pulling testing glanding termination for hot mill
substation 13.8kv/480,3500kva,oil type Onan/Onaf transformer(6 no’s) ,5000Amps, PCC
panels (6 Nos),1 3.8/.460kv,2000kva,try type AN transformer(6nos),3000 amps lighting PCC
for finishing line, hot mill, maintenance crane) (3nos) auxiliary transformers13.8/.480kv,250
KVA, AN, try type(2 no’s),CAT make 2 MVA Emergency diesel generator. (Kirloskar ABB)
13.8kv/480v, 1500 KVA try type transformers 2 no’s, 2500kva transformer 2nos, main
incomer PMCC drive panels (ABB make) PMCC, main drive & motor control Centre.
Solar run test for 2.5kw Conveyor roller motors, (1500Nos),175kw, 125kw, 115kw
Equipment shifting motor(50Nos), 215kw charging table main motors(20Nos), hydraulic
stations, Gress stations, (Siemens make) 250kva cutting saw (3 no’s) drilling saw, resizing,
straightening saw machine (4 no’s)
Feb 2009-Feb 2011
Company :Gulf petrochemical services and Trading L.L.C , Oman
Position: construction Electrical supervisor
Prepare material request manpower request and getting approval from project manager
Prepare daily weekly progress report to project manager & E&I manager
Prepare single line Three-line Diagram Design of LV MDB, SMDBS, DBS, for temporary
facilities management. And getting approved from OXY, PDO, Oman Electricity.
Physical selection of cable tray & trench & Rigid Flexible PVC conduit steel conduit&
fittings.
cable pulled 33kv (ELswedy& bahra make) 3x75 & 1xc 1000sqmm /100Km
Conduct HI pot & INR, continuity of 33kv cable as per standard with safety manner
Inspection of(33kv SF6 switch gear 2 MVA 1 MVA Transformers
Testing of grounding system with grid without grid As per IEC.
Lighting pole arrangement JB installation as per IEC and NEMA, IP 66.
Walkthrough with PDO, OXY, Oman electricity for final hand over &Pre-Energization.
Project 1: 33kv Expansion project for Marmul and Thulailath Client: PDO
Our scope of including construction and pre-commissioning of 33kv substation such as
Installation of outdoor 33kv switch rack, lightning arrestor, (Siemens make) 33kv circuit
breaker ,auto reclose, recloser controller, 33kv/.220KV V.T transformer, 13.8kv NER,13.8 kv
capacitor banks, (Siemens make) 33/13.8/6.6kv,6.6/.440KV transformers, SF6 circuit
breakers, Siemens make 13.8kv,6.6kv indoor switchgears, MCC, Schneider makes LV
panels,(borri make) battery bank, ups, bypass & distribution panels, fire alarm panels.
1x1000 sqmm U.G Cable pulling Glanding testing termination for 6.6kv water injection
pump and shipping pumps.
Project2: Safah and Wati Latham 33/0.440kv OHLT Power distribution
Client: oxy, Oman
Erection Energization of outdoor 33kv switch yard, transformers yards,33kv (45KM)
overhead line WORK such as installation of wooden poles, pin type insulator ACSR
conductors’ gay grip 33v Abs witches with HR Fuse /disconnect switches handles, Steel
supports, lightning arrestor, (Siemens make) 33kv auto recloser and Recloser controller,
pole mounted 33kv/220/110v.V. T, CT Auxiliary
transformers, 33/.440kv, 1000kva, 1200kva (volt Amps) Transformers, 1200amps LV 440V
switch gears, 400A Distribution boards, 150 Amps sub distribution boards, 150A, 63A, 32
Amps lighting panels.
Area lighting pole arrangements.
Aug 2006-Dec2009
Project: 132kv/11kv Business Bay substation, DEWA, Dubai.
Construction Electrical supervisor with ETA, Dubai
Work as site supervisor responsible for construction of 132kv substation such as various
Equipment
Installation of (Siemens) make 132/11kv 50mva power transformers), surge arresters,132kv
GIS, LCC production relay panels, Metering panels, (Siemens)11kv switch gear AC, DC
panels AC,11KV Capacitor banks, NER,11kv RMU (schinder make) (11kv/440v) Auxiliary
transformers (2nos), Battery charger unit. AC, DC, 150watts HI bay, 2x38watts luminaires
lighting fixture, Exit, Emergency lights, outdoor lighting, 20Amps Indoor convince socket
63Amps outdoor welding socket, 100Amps disconnect switches, parking bounty wall
lighting, Water drain pump, oil drain pump, fire alarm, HVAC.
Fabrication of cable trays conduit support
Personal Details
Passport No-P2864485, Expire-17/12/2026/
Nationality–Indian D.O.B- 09/01/1984,
Driving License (Saudi) Expire-05-02-2026,
Language known: ENGLISH, HINDI, Arabic, Tamil(Native), Malayalam