0% found this document useful (0 votes)
1K views1 page

Sump Tank

Uploaded by

chawlaanjali18
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

Sump Tank

Uploaded by

chawlaanjali18
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

NOTES:- NOTES (CONTD.

)
300 8000 300 1) THIS DRAWING SHALL BE READ IN CONJUCTION WITH CONTRACT TERMS & CONDITIONS, CEMENT AND INTEGRAL CEMENT WATER PROOFER AND CRYSTALLINE WATER PROOFER MIXED
SPECIFICATION AND SCHEDULE OF ITEMS. AT THE RATE AS PER MANUFACTURER'S INSTRUCTIONS FOR CONCRETE.
[Link] WALL MANHOLE
(TYP.) 2) ALL DIMENSIONS ARE IN MM UNLESS NOTED OTHERWISE. (b) DAMPEN ALL SURFACES IMMEDIATELY AHEAD OF ACRYLIC CEMENTITIOUS WATERPROOFING
750X750 3) NATURAL GROUND LEVEL (NGL) ±0.00 M. APPLICATION. WHILST THE SURFACE IS STILL DAMP FROM SATURATION (S.S.D), APPLY ONE
300

4) FOR STRUCTURAL GENERAL NOTES AND STANDARD DETAIL, REFER COAT OF SIKA TOP SEAL 109 / PRIMER / BRUSH BOND / FASTFLEX / Dr FIXIT / STP / CICO
SS LADDER
#10@125C/C [Link]/HH/GH/18. PRIMER APPROX 200 gm / m, AS PER MANUFACTURER INSTRUCTION.
COWL TYPE
(TOP & BOTTOM JALI) VENTILATOR (TYP.) 5) FOUNDATION OF UG SUMP HAS BEEN DESIGNED FOR SAFE BEARING CAPACITY OF (c) ONCE TOUCH DRY, APPLY 2 COATS OF ABOVE WATER PROOF COAT ELASTIC ACRYLIC
175 THK.
COWL TYPE OVER FLOW RCC COVER SLAB
750 x 750
33 T/ SQM AT 2.50M DEPTH (MINIMUM) BELOW NGL. EXECUTIVES SHALL VERIFY SBC OF MODIFIED WATERPROOFING COATING ON THE ENTIRE AREA. SECOND COAT SHALL BE APPLIED
SECOND STAGE
VENTILATOR (TYP.) PIPE MANHOLE SOIL BEFORE LAYING FOUNDATION AND ANY VARIATION NOTICED ON ACTUAL DIGGING OF AFTER 6-8 HRS OF APPLICATION OF PREVIOUS COAT AND IN THE DIRECTION RIGHT ANGLE TO
@ 04 PLACES 300 300 FOUNDATION, THE SAME SHALL BE BROUGHT TO THE NOTICE OF THIS HQ FOR THE PREVIOUS COAT.
CONTINUITY OF STEEL REVIEW/REDESIGN.
INLET PIPE (d) APPLY SIKA FABRIC 50 / FOSROC / DR FIXIT / STP / CICO WHILST THE FIRST COAT IS WET AND

450

300
NGL ±0.00 FREE BOARD WATER LEVEL WATER LEVEL NGL ±0.00 CONSTRUCTION CONSTRUCTION JOINTS THEN APPLY SECOND COAT.
JOINT SURFACE
a) HORIZONTAL CONSTRUCTION JOINTS SHALL BE PROVIDED FOR THE WALLS WHENEVER (e) IT IS ESSENTIAL TO CURE WATERPROOF COAT IMMEDIATELY AFTER APPLICATION (MINIMUM

40
CONCRETE IS STOPPED FOR THE DAY. THE HEIGHT OF ANY LIFT SHOULD NOT EXCEED 2.0 M. 6-8 HRS DRYING) FOR A MINIMUM OF 3 TO 5 DAYS TO ENSURE FULL CEMENT HYDRATION AND
T/2 150 WIDE. PVC
WATER STOPPER
b) BEFORE STARTING THE CONCRETE OVER THIS SURFACE, THE SURFACE SHALL BE TREATED TO MINIMISE CRACKING.

2100
FS1 FS1 WITH WATER RESISTANT RUBBERISED (EPOXY) BONDING AGENT. OVER THIS 50 MM THK. (f) APPLY A PROTECTION LAYER OF 12-15 MM THICK PLASTER MADE OF 1:4 CEMENT SAND
6000

2575
#12@125 c/c CONCRETE WITH 8MM DOWN AGGREGATE WITH CEMENT CONTENT 360 KG/CUM SHALL BE
SUCTION PIPE MORTAR ADMIXED WITH INTEGRAL WATERPROOFING COMPOUND SIKACIM / FOSROC /
300 HAUNCH #12@125 c/c FIRST STAGE
#12@125 c/c POURED AND FURTHER CONCRETING CONTINUED. [Link] / STP / CICO CONFIRMING TO IS:2645 OVER THE APPLIED WATERPROOFING COATING
#12@125 c/c
#12@125 c/c WALL c) WHEN THE RCC BOTTOM SLAB ARE CAST, THE SIDE WALL STRETCHES STANDING OVER THEM AND BROADCAST WITH QUARTZ SAND TO FORM MECHANICAL KEY.
#12@125 c/c

300
300 (T) THICKNESS ALSO SHALL BE CAST ALONG WITH THE BASE SLAB IN ONE OPERATION UPTO A MINIMUM (g) DURING CONSTRUCTION OF THE UG SUMP, ALL CONSTRUCTION JOINTS SHALL BE PLACED
#16@300 c/c

450
A A HEIGHT OF 350 MM ABOVE THE TOP OF THE BASE SLAB WITH HORIZONTAL CONSTRUCTION WITH SIKA SWELL A 2010 SWELLABLE WATERBAR FIXED USING HYDROSWELLING PU SEALANT
1- #16 300 HORIZONTAL JOINT PROVIDED AS SHOWN IN DETAILS. SIKA SWELL S2 / FOSROC / STP / Dr FIXIT.
7) WATER PROOFING OF UG WATER SUMP (h) PIPE PENETRATION THROUGH THE RCC SLAB OR WALLS MUST BE SEALED USING SIKAGARD
INLET PIPE
CONSTRUCTION 7.1 GENERAL
BASE SLAB 694 F (l) / FOSROC / STP / Dr FIXIT / CICO, AROUND THE PERIMETER OF THE PIPE.
CUT-OUT OF
SUCTION PIPE 100 600 300
#12@125 c/c 300 600 100 JOINT IN SIDE WALL (TYP) IN ORDER TO PROVIDE A COMPLETE WATERTIGHT SYSTEM, THE CONCRETE STRUCTURE AND (i) INTERSECTION OF BASE SLAB WITH WALL MUST BE PROVIDED WITH A 50 MM FILLET USING
#12@125 c/c #16@1000 C/C THE WATERPROOFING ARE CLOSELY LINKED. THUS THE INTEGRITY AND FINAL QUALITY OF SIKA LATEX MODIFIED MORTAR WITH A BONDING COAT OF SIKA LATEX MODIFIED / FOSROC /
OVER FLOW CHAIR BAR
PIPE
100 THK. P.C.C. M15
(TYPICAL) 300 THE CONCRETE DURABILITY AND WATER TIGHTNESS OF THE WATERPROOFING SYSTEM, CAN STP / Dr FIXIT BY INJECTION
30
0 ONLY BE ASSURED IF THE CONTRACTOR TAKES OVER FULL RESPONSIBILITY FOR THE ENTIRE (j) ANY SURFACE DEFECTS, SUCH CRACKS, SURFACE HONEYCOMBING DEPRESSIONS, ETC.,
300

SECTION - A-A STRUCTURAL CONCRETE AND WATERPROOFING WORKS. THE CONTRACTOR SHALL ASSIGN SHALL BE REPAIRED USING LOW VISCOSITY, SOLVENT FREE EPOXY RESIN SYSTEM, SIKADUR
ONE MANUFACTURER FOR THE SUPPLY OF ALL NECESSARY MATERIALS FOR THESE 53 UF / FOSROC / STP / Dr FIXIT BY INJECTION GROUTING OR ONE COMPONENT REPAIR
UG SUMP TOP LEVEL PLAN 450 ASSOCIATED WORKS, INCLUDING ANY DURABILITY ENHANCING ADMIXTURES FOR THE MORTAR AS THE CASE MAY BE.
SUCTION PIPE ℄ CONCRETE, AND ONE EXPERIENCED WATERPROOFING SUBCONTRACTOR FOR THE (k) ON EXTERIOR SURFACES OF THE WALLS, TWO COATS OF 2 PACK ACRYLIC POLYMER MODIFIED
#12@125 c/c
1000 HORIZONTAL REINF. 450x450 C C APPLICATION OF THE ENTIRE WATERPROOFING SYSTEM. CEMENTATIOUS WATERPROOFING COATING SYSTEM AS GIVEN IN PARA (b) TO (f) OF 7.3.2
EXTRA REINF. MATERIALS AND METHOD OF APPLICATION SHALL BE FOLLOWED OF ONLY ONE ABOVE.
10000 1000 VERTICAL REINF.
AS PER
℄ MANUFACTURER AFTER APPROVAL BY THE GE (EXECUTIVE AGENCY). QUANTITY OF THE 8) TESTING OF UG SUMP

450
9800 ARCH. DRG. REFER SECTION
300
300 A-A MATERIAL WILL BE STRICTLY AS PER THE MANUFACTURER’S RECOMMENDATION THE UG SUMP SHALL BE TESTED AGAINST LEAKAGE/SEEPAGE AS PER IS:3370. ANY
100 600 300 8000 300 600 100 IRRESPECTIVE OF WHAT IS SPECIFIED HERE IN BELOW WITHOUT ANY FINANCIAL ADJUSTMENT.

1000
LEAKAGE/SEEPAGE SHALL BE RECTIFIED THROUGH GROUTING. IT IS DETRIMENTAL TO KEEP

300

300
VERTICAL REINF.

450
7.2 MATERIALS
100

THE WATER RETAINING STRUCTURES DRY, AS IT MAY LEAD TO FORMATION OF CRACKS. SO IT

1000
300 HORIZONTAL REINF.

450
7.2.1GENERAL REQUIREMENTS IS IMPERATIVE THAT BEFORE CURING OF LAST CAST PORTION OF SUMP IS COMPLETED,

300
HAUNCH BARS 3-#10
#10@150 c/c THE WATERPROOFING MATERIALS SHALL BE FROM A SINGLE MANUFACTURER LONG-TERM WATER ARRANGEMENT FOR TESTING THE UG WATER SHALL BE KEPT READY AT SITE, SO THAT

100
VERTICAL REINF. PLAN ENGAGED IN MANUFACTURING WATERPROOFING HAVING AN EXPERTISE RECORD OF AT LEAST TESTING CAN BE COMMENCED IMMEDIATELY. THE RATE OF FILLING OF WATER IN
300 600

3-#10
HORIZONTAL REINF.
VERTICAL REINF. 20 YEARS IN WATERPROOFING. UNDERGROUND SUMP SHALL BE 300 MM DEPTH PER DAY AND THE TESTING OF SUMP FOR
REFER SECTION TYPICAL DETAIL OF SPLASH STONE ALL COMPONENTS AND ELEMENTS, WHICH ARE NEEDED TO MAKE THE STRUCTURE
HORIZONTAL REINF. A-A WATER TIGHTNESS SHALL BE AS PER IS: 6494.
100 450 450 100
ON RCC PEDESTAL
300

WATERTIGHT, SHALL BE PROVEN TO WORK TOGETHER. THERE SHALL BE A SINGLE SOURCE 9) ALL PRECAUTIONS NECESSARY FOR DEWATERING SHALL BE TAKEN INCASE HIGH WATER
300 #12@125 c/c NOTE :- CL OF SPLASH STONE & PEDESTAL SHALL BE @ OF RESPONSIBILITY AND PERFORMANCE OF THE PRODUCTS. TABLE IS MET WITH.
HAUNCH
[Link] MAIN ELEMENTS OF THE WATERPROOFING SYSTEM 10) THE PIPES AND SPECIAL FIXTURES SHOULD BE FIXED IN POSITION BEFORE CONCRETING
(TYP.) TYPICAL CORNER REINF. DETAIL OF WALL SECTION - B-B LOCATION OF INLET PIPE (TO BE DECIDED BY GE
THE WATERPROOFING SYSTEM SHALL COMPRISE OF THE FOLLOWING: OPERATION SO THAT THESE ARE BUILT IN AT THE TIME OF CONSTRUCTION. THESE SPECIALS
BEFORE CASTING OF BASE SLAB)
PE

(INTERNAL TANKING / SUMP) SHOULD BE PROVIDED WITH PUDDLE COLLARS FOR PROPER GRIP WITH CONCRETE.
O
SL

A A i. 2-PACK ACRYLIC CEMENTITIOUS WATERPROOFING COATING SYSTEM SIKA TOP SEAL 109 OF 11) ALL EXPOSED IRON AND STEEL WORK SHALL BE PAINTED WITH TWO COATS OF ALUMINIUM
AIR VENT PIPE 150 Ø 300 LONG TO BE PLACED SIKA / BRUSH BOND RFX OF FOSROC / FASTFLEX OF Dr FIXIT / STP / CICO. PAINT OVER A SHOP COAT OF RED OXIDE ZINC CHROMATE PRIMER. STEEL LADDER IN SIDE THE
IN POSITION WHEN CONCRETING OF ii. GLASS FABRIC REINFORCEMENT SIKA FABRIC 50 / Dr FIXIT / FOSROC / STP / CICO. TANK SHALL BE PAINTED WITH APPROVED DRINKING WATER PAINT.
10THK. 'D1' DIA MS FLANGE SLAB IS CARRIED OUT. THE MOUTH OF PIPES iii. JOINT TREATMENT SWELLABLE WATERBAR SIKA SWELL A 2010 & SIKA SWELL S2 / 12) THE POSITION OF INLET / OUTLET PIPE SHOWN ARE TENTATIVE. THE EXACT POSITION SHALL
450 x 450 x 40 MM THK. 'D' NB PIPE SHALL BE COVERED WITH MOSQUITO PROOF Dr FIXIT / FOSROC / STP / CICO. BE DECIDED BY THE ENGINEER-IN-CHARGE.
SPLASH STONE (GRANITE) 6 iv. ACCESSORIES AS RECOMMENDED BY THE MANUFACTURER. 13) ELECTRONIC TYPE WATER LEVEL INDICATOR IS DEEMED TO BE INCLUDED IN LUMPSUM RATE.
8000

7800

6000

OVER RCC PEDESTAL


[Link].1 PROPERTIES OF ELASTIC LIQUID APPLIED, CRACK BRIDGING 2-PACK ACRYLIC POLYMER 14) CLEAR COVER SHALL BE MAINTAINED FOR ALL RCC MEMBERS AS MENTIONED BELOW.
C.I COWL (AS SPE.)
2-#8 TIES TOP OF BASE SLAB MODIFIED CEMENTITIOUS WATERPROOFING COATING SYSTEM SHOULD MEET FOLLOWING
150 VENTILATOR a) BASE SLAB ----- 75 MM b) COLUMN ----- 45 MM
MOSQUITO JALI STANDARD.
COVER SLAB c) RCC WALL ----- 45 MM d) BEAM ----- 45 MM

40
300 3-#10 PERFORMANCE PROPERTY TEST METHODS e) RCC SLAB ----- 45 MM
WATER PERMEABILITY, MEASURED AS VOLUME OF WATER COLLECTED IS: 2645
150 150 100 15) PIPE PIECE OF SUITABLE DIA SHALL BE FIXED IN RCC WALL AT THE TIME OF CASTING.
IN ml VS. UNCOATED
SECTION C-C 6 THK X 100 WIDE X 75HT

75
PE

ELONGATION AT BREAK ASTM D 2370 WELDED TO NEAREST REINFORCEMENT AS SHOWN. PIPE SHALL BE CONNECTED
O

SUCTION PIPE HOLD FAST WELDED


SL

300 10 THK. PULLOUT BOND STRENGTH (CONCRETE FAILURE) WITH SLUICE VALVE AT TOP OF UG SUMP COVER SLAB.
B B WITH VENT PIPE ISO 4624
TENSILE STRENGTH (AFTER 28 DAYS EXPOSURE) ASTM D 2370 16) THE POSITION OF INLET, OUTLET, OVER FLOW & SUCTION PIPE SHOWN ARE TENTATIVE.
PUDDLE FLANGE DETAIL TYP. COWL TYPE VENTILATOR ACCELERATED WEATHERING, 500 HOURS IS 101 THE EXACT POSITION SHALL BE DECIDED BY ENGINEER-IN-CHARGE.
300

NOTE :- (DIA 'D' & 'D1' SHALL BE AS PER SLANT-SHEAR BOND STRENGTH FIP 5.15
CLIENT:-
600 300

INLET & OVERFLOW PIPE DIA)


[Link] HIGH RANGE WATER REDUCER – SUPER PLASTICIZER COMPOUND LIKE CICO-PLASTO
SUPER / SIKAPLAST / SIKAMENT / FOSROC / STP / Dr FIXIT CONFORMING TO IS: 9103. EXECUTIVE ENGINEER
HAUNCH BARS [Link] INTEGRAL WATER PROOFER (CHLORIDE FREE) CONPLAST X 421 / SIKACIM / FOSROC /

300
300 #10@150 c/c Dr. FIXIT CONFORMING IS:2645 BHUBANESWAR-II,
100

450 X 450 X 300


SUMP
[Link] WALL
(TYP.)
MAN HOLE [Link] CRYSTALLINE WATER PROOFER FOR CONCRETE VIZ SIKA 101 H / FOSROC / STP / Dr FIXIT. CPWD BHUBANESWAR

300
750X750 7.2.2 ALL THE CONSTRUCTION CHEMICALS SHALL BE OBTAINED FROM SIKA, FOSROC,
3-#10 PIDILITE / CICO / STP / KRISHNA CONCHEM. CHEMICALS OF ONLY ONE MANUFACTURE SHALL ARCHITECT:-
BE USED.
UG SUMP BOTTOM LEVEL (BASE SLAB) PLAN 7.3 WORKMANSHIP
ARCHITECT OFFICE BHAWAN,
300 WATER PROOFING TREATMENT TO UG SUMP SHALL BE CARRIED OUT ALL AS SPECIFIED HERE- PLOT NO: 188/ 623-624,
2-12 # EXTRA AT IN-AFTER IN STRICT CONFORMITY WITH APPLICATION INSTRUCTIONS, METHOD STATEMENTS POKHARIPUT,
TOP AND BOTTOM TYPICAL DETAIL OF HAUNCH TESTING PROCEDURES AND QUALITY CONTROL PROCESS OF THE MANUFACTURER.
2000 LONG (TYP)
7.3.1 BASE SLAB BHUBANESWAR- 751020
BHUBANESWAR TEL: 0674 - 2352956
(a) TWO COATS OF 2 PACK ACRYLIC POLYMER MODIFIED CEMENTATIOUS WATERPROOFING
REINF. DETAIL OF CUTOUT SPECIAL NOTES :- COATING SYSTEM SHALL BE APPLIED OVER PCC M15 100 MM THICK SUB BASE CONCRETE
1. TO AVOID LIFTING OF BASE SLAB DURING CONSTRUCTION DUE TO BUOYANCY, ENSURE SURFACE FINISHED SMOOTH TO ACT AS A PROTECTION TO RCC BASE SLAB AGAINST PROJECT:-
IN RCC SLAB (TYP.) GROUND WATER TABLE (G.W.T) IS KEPT BELOW BASE SLAB LEVEL TILL THE TOP AGGRESSIVE CONDITIONS OR AS RECOMMENDED BY THE MANUFACTURE. THIS COATING
SLAB IS CAST. SHALL BE PROTECTED BY CEMENT MORTAR (1:4) SCREED 50 MM THICK TO SAFEGUARD HOLIDAY HOME FOR CENTRAL
12X3 FI STRAP
2. BACKFILLING SHALL BE DONE ONLY AFTER CASTING OF TOP RCC SLAB AND WATER PROOF AGAINST DAMAGE FROM REINFORCEMENT. GOVERNMENT EMPLOYEES
WELDED TO FI 10 Ø HOLE FOR TEST. (b) THE RCC SLAB SHALL THEN BE CAST USING M 30 (DESIGN MIX) CONCRETE, INTEGRATED AT RAIRANGPUR, ODISHA
LOCKING ARRANGEMENT 3. UNTIL THE TOP SLAB IS CAST, SUMP SHALL BE KEPT EMPTY. WITH HIGH RANGE WATER REDUCING ADMIXTURE AT THE RATE OF 150 ml PER 50 KG BAG OF
HINGE VERTICAL 25X3 FI HOLD FAST
PCC CURB WELDED TO FI HOLD FAST CEMENT OR AS RECOMMENDED BY THE MANUFACTURES AND INTEGRAL CEMENT WATER BUILDING:-
1:1.5:3 PROOF AND CRYSTALLINE WATERPROOFING POWDER MIXED AT THE RATE AS PER
25x25x3 MS ANGLE FRAME & 5TH MANUFACTURER’S INSTRUCTIONS FOR CONCRETE CONFORMING TO IS.
75

75

MS COVER PLATE WELDED (c) DAMPEN ALL SURFACES IMMEDIATELY AHEAD OF ACRYLIC CEMENTITIOUS WATERPROOFING GUEST HOUSE
100 100 APPLICATION. WHILST THE SURFACE IS STILL DAMP FROM SATURATION (S.S.D), APPLY ONE

25MM DIA SS PIPE


HOLD FAST 20X3 FLAT COAT OF SIKA TOP SEAL 109 / BRUSH BOND FOSROC / FASTFLEX Dr FIXIT / STP / CICO DRAWING TITLE:-
3.1MM THK. 150 LONG BENT TO PRIMER APPROX 200 gm / m, AS PER MANUFACTURER INSTRUCTION.
SHAPE AND WELDED (d) ONCE TOUCH DRY, APPLY 2 COATS OF ABOVE WATER PROOF COAT ELASTIC ACRYLIC
25MM DIA SS PIPE TO ANGLE FRAME @3OO c/c MODIFIED WATERPROOFING COATING ON THE ENTIRE AREA. SECOND COAT SHALL BE APPLIED 100000 LITERS UNDERGROUND SUMP TANK
3.1MM THK.
50MM DIA SS PIPE 50 750 50 AFTER 6-8 HRS OF APPLICATION OF PREVIOUS COAT AND IN THE DIRECTION RIGHT ANGLE TO
3.1MM THK. RCC WALL THE PREVIOUS COAT. THE WATERPROOFING COATING SHOULD BE TAKEN TO A HEIGHT OF DATE SCALE REV.
CHECKED & VETTED
DETAIL OF MAN HOLE COVER NTS
250 (TYP.)

MINIMUM 200 MM ABOVE THE FINISHED FLOOR LEVEL ON THE VERTICAL SURFACE.
50MM DIA SS PIPE R1
50MM DIA SS PIPE 3.1MM THK. (e) APPLY SIKA FABRIC 50 / FOSROC / Dr FIXIT / STP / CICO WHILST THE FIRST COAT IS WET AND
3.1MM THK. THEN APPLY SECOND COAT. DEALT BY DESIGNED BY CHECKED BY
AT 1500 C/C
(f) IT IS ESSENTIAL TO CURE WATERPROOF COAT IMMEDIATELY AFTER APPLICATION (MINIMUM
6-8 HRS DRYING) FOR A MINIMUM OF 3 TO 5 DAYS TO ENSURE FULL CEMENT HYDRATION AND
SCHEDULE OF RCC SLAB TO MINIMISE CRACKING.
150MM DIA SS PLATE [Link]. STR/HH/01
NOMENCLATURE

150MM DIA SS PLATE 300 10MM THK. FIXED WITH (g) APPLY A PROTECTION LAYER OF 12-15 MM THICK PLASTER MADE OF 1:4 CEMENT SAND
10MM THK. FIXED WITH EXPANSION BOLT BOTTOM REINFORCEMENT EXTRA REINFORCEMENT DIST. REIN AT TOP MORTAR ADMIXED WITH INTEGRAL WATERPROOFING COMPOUND SIKACIM / FOSROC / Dr.
EXPANSION BOLT 600
CONT./ NON- CONT.
AT TOP (SUPPORT/END) FIXIT / STP / CICO CONFIRMING TO IS: 2645, OVER THE APPLIED WATERPROOFING COATING STRUCTURAL CONSULTANT
THICKNESS

END AND BROADCAST WITH QUARTZ SAND TO FORM MECHANICAL KEY.


SHORT SPAN LONG SPAN SHORT SPAN LONG SPAN REMARKS 7.3.2 WALLS
SPACING (a) THE RCC WALLS SHALL THEN BE CAST WITH M-30 DESIGN MIX CONCRETE INTEGRATED
RCC BASE SLAB RCC BASE SLAB DIA SPACING DIA SPACING DIA SPACING DIA SPACING DIA
C/C WITH HIGH RANGE WATER REDUCING ADMIXTURE AT THE RATE OF 150 ml PER 50 Kg BAG OF
C/C C/C C/C C/C
SECTION ELEVATION
FLOOR SLAB
TYPICAL DETAIL OF SS LADDER
FS1 175 AS PER DETAIL (REFER SECTION A-A) TWO-WAY SLAB A SQUARE STRUCTURAL