Classroom Observation Tool
PART 1: PRE-OBSERVATION
School name School code
Name of teacher to be observed Teacher CNIC
Observer designation (circle one) AEO Head Teacher Teacher Name of observer
Date of visit Start time of visit Visit end time
PART 2: CLASSROOM OBSERVATION
Subject Social General Grade 1 2
Urdu Math LitNum English Science Islamiat
observed Studies Knowledge observed
3 4 5
Based on evidence recorded in your notes made during the observation, rank the teacher on each practice (5 is high, 1 is
1 2 3 4 5
low)
1. The teacher explicitly articulates the objectives of the lesson and relates classroom activities to the objectives.
2. The teacher's explanation of content is clear and correct.
3. The teacher makes connections that relate to students’ daily lives or other content knowledge.
4. The teacher models by enacting, thinking aloud or showing a final product expected of the students.
5. The teacher uses questions, prompts or other strategies to determine students’ level of understanding.
6. The teacher monitors most students during independent or group work.
7. The teacher adjusts teaching to the level of the students.
8. The teacher provides specific comments to help students clarify misunderstandings and understand successes.
9. The teacher asks thinking questions.
10. The teacher provides thinking tasks.
11. The teacher responds to students’ needs.
Time on Learning
1st interval 2nd interval 3rd interval
Students are engaged in a learning activity
L M H L M H L M H
(Circle one rating at each interval)
Duration of the lesson observed (circle one): Less than 20 minutes 21-30 minutes 31-40 minutes More than 40 minutes
PART 3: POST-OBSERVATION DISCUSSION
Practices to improve (select two practices)
Actionable feedback to the teacher:
Practice _____
Actionable feedback to the teacher:
Practice _____
Any other urgent observations/action required
Duration of the discussion (circle one): 10 minutes or less 11-20 minutes 21-30 minutes More than 30 minutes
Teacher signature Head Teacher signature AEO signature
and date: and date: and date: