0% found this document useful (0 votes)
897 views8 pages

Time & Work Notes

The document contains a series of mathematical problems related to time and work, focusing on how different individuals or groups can complete tasks in various timeframes. It includes multiple-choice questions with specific scenarios and calculations involving work rates and collaboration. The document also provides an answer key for the problems presented.

Uploaded by

Kartik Meena
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
897 views8 pages

Time & Work Notes

The document contains a series of mathematical problems related to time and work, focusing on how different individuals or groups can complete tasks in various timeframes. It includes multiple-choice questions with specific scenarios and calculations involving work rates and collaboration. The document also provides an answer key for the problems presented.

Uploaded by

Kartik Meena
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Join Telegram- Maths by Aditya Ranjan Time and Work - 01

1. A B 5.
A B

A and B can complete a work in 12 days and 8


days respectively. If A and B work together, then Shyam and Sundar can d o a piece of work in 16
in how many days will the work be completed? days and 24 days respectively. Shyam started the
work alone and after 10 days Sunder joined him
Group - D 14/09/2022 (Shift-02)
and both worked together till the work was
(a) 4.8 (b) 3.2 completed. What was the total time taken to
(c) 6.4 (d) 2.4 complete the work?
2. Group - D 11/10/2022 (Shift-01)
3 3
(a) 13 day/ (b) 12 day/
5 5
3 3
(c) 15 day/ (d) 10 day/
5 5
A tyre has two punctures. The first puncture alone 6. P
would have made the tyre flat in 9 min and the
Q
second alone would have done it in 6 min. If air
leaks out at a constant rate, how long will it take P Q
both the punctures together to make the tyre flat?
NTPC CBT-1 01/01/2021 (Shift-01) P can complete a work in 14 days working 6 hours
per day. Q can complete the same work in 10 days
1 1 working 8 hours per day. If both P and Q work
(a) 1 /min (b) 3 /min
2 2 together working 7 hours a day, in how many days
can they complete the work?
3 1
(c) 3 /min (d) 4 /min NTPC CBT-1 22/02/2017 (Shift-01)
5 4 (a) 8 /days (b) 10 /days
3. (c) 6 /days (d) 12 /days
7. A
B

A boy can complete a work alone in 10 days, but


with the help of his friend he can complete the A working 5 hours a day can complete a piece of
work in 6 days. In how much time can his friend work in 8 days and B working 6 hours a day can
complete the work alone? complete the same work in 10 days. In how much
Group - D 13/09/2022 (Shift-01) time will they together complete the same work
working 8 hours a day?
(a) 4 day/ (b) 15 day/
NTPC CBT-1 23/01/2021 (Shift-02)
1 (a) 6 /days (b) 3 /days
(c) 4 day/ (d) 8 day/
2 (c) 4.5 /days (d) 5 /days
4. K L 8.

K and L can do a work in 15 a nd 2 0 da ys


respectively. They work together for 5 days and Paras can complete 40% of the work in 8 days
leave. Calculate the unfinished portion of the work. while Deepti & Paras together can complete 10%
NTPC CBT-02 18/01/2017 (Shift-01) of the work in a day. Find the time taken by Deepti
5 1 alone to complete the work.
(a) (b)
12 13 NTPC CBT-02 13/06/2022 (Shift-02)
(a) 20 /days (b) 22 /days
7 1
(c) (d) (c) 21 /days (d) 23 /days
12 4
Aditya Ranjan (Excise Inspector) Selected Selection 1
Join Telegram- Maths by Aditya Ranjan Time and Work - 01

9. A, B C

Madhu and Shiny together can complete a work


A, B and C can complete a work in 20, 24 and 30 in 20 days. Shiney and Rosie together can
days respectively. If they work together, how many complete the same work in 12 days, and Rosie and
days will they take to complete the work? Madhu together can complete the same work in
Group - D 09/09/2022 (Shift-03)
15 days. In how many days will all three of them
together complete that work?
(a) 8 day/ (b) 5 day/
Group - D 23/08/2022 (Shift-03)
(c) 6 day/ (d) 7 day/
(a) 15 day/ (b) 10 day/
10. A B
(c) 12 day/ (d) 5 day/
A, B C
13.
C

A can do a job alone in 66 days. B can do it alone


in 55 days, while A, B and C working together can
complete the job in 22 days. In how many days can
C do the job alone?
NTPC CBT-02 15/06/2022 (Shift-01) Karthik and Sneha together can do a work in 25
(a) 82.5 /days (b) 85 /days days, Sneha and Madhuri together can do the same
work in 20 days. Madhuri and Karthik together can
(c) 81.5 /days (d) 84 /days do the same work in 15 days. How long will they
11. take to complete the work, if all three of them work
together? (Number of days should be rounded off
to the nearest integer)
NTPC CBT-02 17/06/2022 (Shift-01)
(a) 13 /days (b) 11 /days

Anmol can complete a piece of work in 25 days. (c) 17 /days (d) 19 /days
Together with Garima he can complete the same 14. P Q
work in 15 days. while Anmol and Aseema working Q R
together can complete the same work in 20 days.
P R
In how many days can Garima and Aseema working
together complete the same work? P
NTPC CBT-02 17/06/2022 (Shift-03) R
300
(a) /days
11 P and Q together can complete a job in 20 days. Q
and R together can complete the same job in 30
(b) 30 /days
days. P and R together can complete the same job
(c) 29 /days in 30 days. What is the respective ratio of the
number of days taken by P when completing the
250
(d) /days same job alone to the number of days taken by R
9 when completing the same job alone?
12. NTPC CBT-02 16/06/2022 (Shift-01)
(a) 1 : 2 (b) 3 : 4
(c) 2 : 3 (d) 1 : 3

ANSWER KEY
1. (a) 2. (c) 3. (b) 4. (a) 5. (a) 6. (b) 7. (b) 8. (a) 9. (a) 10. (a)

11. (a) 12. (b) 13. (a) 14. (d)

Aditya Ranjan (Excise Inspector) Selected Selection 2


Join Telegram- Maths by Aditya Ranjan Time and Work - 02

1. A B Two individuals Kuldeep and Agarkar working


C separately can reap gravest in a field in 8 and 12
hours each one after the other in which Kuldeep
C D
begins to work from 9 a.m. By what time will the
D crop be harvested?
Group-D 16/09/2007
A can complete a task alone in 8 days, while B (a) 5.30 p.m. (b) 6.30. p.m.
takes 12 days to do it by himself. Together with C
(c) 4.30 p.m. (d) 7.30. p.m.
it takes them 4 days to complete the work. If C
and D together can complete the task in 15 days, 5. A B C
then how many days will D need to complete the
task by himself?
RRB ALP & TECH 10/08/2018 (Shift-03) B A
(a) 36 (b) 40 C A

(c) 32 (d) 30
A can paint a saree in 11 days, B in 20 days and
2. A B C in 55 days, if they work independently. If A is
C assisted by B on every odd numbered day and A
'C' 'D' is assisted by C on every even numbered day till
the work is completed, then in how many days
D
can the work be completed?
Group - D 17/08/2022 (Shift-03)
A can do a work alone in 11 days while B takes 16.5
days to do it alone. It takes 5.5 days for them to (a) 8 /days (b) 18 /days
complete the work together with C. If 'C' and 'D'
work together then they can complete it in 22 (c) 12 /days (d) 9 /days
days. Then in how many days can D alone finish 6. X, Y Z
the work?
Group-D 06/12/2018 (Shift-02) Y Z X
(a) 44 /days (b) 55 /days
(c) 77 /days (d) 66 /days X, Y and Z can do a piece of work in 30 days, 45
days and 90 days respectively. In how many days
3. A B
can the work be completed if X is assisted by Y
and Z together, on every second day?
NTPC CBT-02 18/01/2017 (Shift-03)
A alone can complete a piece of work in 15 days, (a) 10 /days
while B alone can do it in 30 days, if the both of
them work on alternate days, when will the work (b) 20 /day
get completed?
(c) 15 /days
NTPC CBT-1 11/02/2021 (Shift-02)
(d) 30 /days
(a) Cannot be determined
(b) 24 /days 1
7. A 33 %
3
(c) 20 /days
B
(d) 18 /days
A, B C
4. A
B C
B, A

Aditya Ranjan (Excise Inspector) Selected Selection 1


Join Telegram- Maths by Aditya Ranjan Time and Work - 02

1 A and B can do a work in 14 days and 18 days


A can complete 33 % of a work in 10 days and respectively. A works alone for 6 days and then
3 leaves the work. Find the number of days required
B can complete one-fourth of the same work in
by B to complete the remaining work.
30 days. A, B and C together can complete the
same work in 12 days. If A works every day, and Group - D 15/09/2022 (Shift-03)
B and C help him on alternate days, in which B
4 2
helps A on the first day, then find in how many (a) 10 (b) 10
days will the work be completed? 7 7

Group - D 26/09/2022 (Shift-03)


3 5
(c) 10 (d) 10
7 7
4 1
(a) 18 /days (b) 17 /days 2
13 3 11. A B
5
2 3 1
(c) 18 /days (d) 17 /days
3 13 2
8. A A
B A, B B

1 2
C 4 A can complete of a work in 10 days. B can
2 5
1
B A complete of the work in 10 days. They worked
2
C, C together for 5 days after which A left the work.
In how many days will B complete the remaining
work?
A alone can complete a work in 10 days and B RRB ALP & TECH 23/01/2019 (Shift-03)
alone can complete the same work in 15 days. A,
B and C working together can complete the work (a) 8 (b) 10
1 (c) 9 (d) 11
in 4 days. If B does not work, while A and C
2
12. X Y
work on alternate days starting from C, then in
how many days will the work be completed?
X Y
Group - D 26/09/2022 (Shift-03) X
1 1 X and Y can complete a certain work in 45 days
(a) 13 /days (b) 13 /days
9 5 and 60 days, respectively. They started the work
2 together but X left after some days and Y alone
(c) 13 /days (d) 12 /days completed the remaining work in 39 days. For how
3
many days did X work?
9.
NTPC CBT-02 14/06/2022 (Shift-01)

(a) 9 /days (b) 10 /days


(c) 6 /days (d) 8 /days
13. A, B C

In a computer game, a builder can build a wall in A B C


10 hours while a destroyer can completely demolish B C
such a wall in 25 hours. Both builders and
C
destroyers were initially designed to work together
on level ground. But after 15 hours the destroyers B
were removed. How much time did it take to build A, B and C together can complete a task in 16
the entire wall? days. After, three of them worked together for 2
Group-D 16/09/2007 days. A left B and C contimued for 9 more days
and then B left. C complete the remaining work
(a) 16 20 (b) 16 in 6 days. If C alone can complete the entire task
in 24 days, them in how many days can B alone
(c) 17 2 (d) 18 24
complete it?
10. A B NTPC CBT-1 03/04/2021 (Shift-01)
A,
(a) 36 /days (b) 35 /days
B
(c) 30 /days (d) 32 /days

Aditya Ranjan (Excise Inspector) Selected Selection 2


Join Telegram- Maths by Aditya Ranjan Youtube:- Rankers' Gurukul

1. A and B together can do a piece of work in A vkSjB ,d fuf'pr dk;Z dks 6 ?kaVs esa dj ldrs
12 days, while A alone can complete the A, B vkSjC feydj mlh dk;Z dks iwjk
gSa vkSj
same work in 18 days. How long will B alone djus esa 4 ?kaVs dk le; ysrs gSaACvdsys
dks dk;Z
take to complete the work? iwjk djus esa fdruk le; yxsxk\
A vkSjB feydj ,d dk;Z dks 12 fnuksa esa dj ldrs SSC CGL 03/12/2022 (Shift-02)
gSa] tcfdA vdsyk mlh dk;Z dks 18 fnuksa esa iwjk dj (a) 12 hours (b) 4 hours
ldrk gSAB vdsys mlh dk;Z dks iwjk djus esa fdruk (c) 2 hours (d) 6 hours
le; ysxk\ 5. Anshu, Swati and Rajni can finish a work
in 4 days if they work together. However,

r
SSC CHSL 24/05/2022 (Shift-02)
Anshu alone will take 9 days to complete

si
(a) 6 Days (b) 12 Days the work, and Swati alone will complete
(c) 24 Days (d) 36 Days the work in 12 days. How many days will
2.
an by
Three persons P, Q and R can do a job
separately in 10 days, 20 days and 60 days,
Rajni alone take to complete the work?
v a'kq] Lokfr vkSj jtuh ,d lkFk dke djrs gq, fdlh

n
respectively. If they work together, then what dke dks 4 fnuksa esa iwjk dj ldrh gSaA gkyk¡fd va'kq
is the time taken to complete the job? dks vdsys dke dks iwjk djus esa 9 fnu dk le;

ja
r hu O;fDrP, Q vkSjR ,d dk;Z dks vyx&vyx yxsxk] vkSj Lokfr vdsys bl dke dks 12 fnuksa esa
R s
Øe'k% 10 fnu] 20 fnu vkSj 60 fnu esa iwjk dj iwjk dj ysxhA jtuh dks vdsys dke dks iwjk djus
a th

ldrs gSaA ;fn os ,d lkFk dk;Z djrs gSa] rks dk;Z eas fdrus fnu dk le; yxsxk\
dks iwjk djus esa fdruk le; yxsxk\ SSC CGL 09/12/2022 (Shift- 01)
(a) 18 (b) 12
DP Head Constable 12/10/2022 (Shift-01) (c) 24 (d) 16
ty a

(a) 8 days (b) 5 days 6. Raghav and Aditya can complete a work in
(c) 6 days (d) 10 days 3 days. Aditya and Ishaan can complete the
di M

3. S alone can do a piece of work in 14 days. same work in 4 days. Ishaan and Raghav
T alone can do the same work in 21 days. can complete it in 6 days. How many days
U alone can do the same work in 28 days. will it take for Raghav, Aditya and Ishaan,
Working together, in how many days will
combined together, to complete the same
they complete the work?
amount of work?
S vdsyk ,d dk;Z dks 14 fnuksa esa iwjk dj ldrk gSA jk?kovkSj vkfnR; ,d dke dks 3 fnu eas iwjk dj ldrs
T vdsyk mlh dk;Z dks 21 fnuksa esa dj iwjk ldrk gSAgSaA] vfnR; vkSj bZ'kku mlh dke dks 4 fnu esa iwjk dj
U vdsyk mlh dk;Z dks 28 fnuksa eas iwjk dj ldrk gSAldrs gSaA bZ'kku vkSj jk?ko bls 6 fnu esa iwjk dj ldrs
,d lkFk dk;Z djrs gq,] os ml dk;Z dks fdrus fnuksa gSaA jk?ko] vkfnR; vkSj bZ'kku dks ,d lkFk feykdj mlh
eas iwjk dj ysaxs\ dke dks iwwjk djus esa fdrus fnu yxsaxs\
A

SSC MTS 20/07/2022 (Shift- 2) SSC CHSL 07/06/2022 (Shift-01)


4 2
84 77 (a) 2 (b) 3
(a) days (b) days 5 3
13 13
3 2
(c) 3 (d) 2
71 87 4 3
(c) days (d) days 7. A and B can together complete a piece of
13 13
work in 18 days. B and C can together
4. A and B can do a certain work in 6 hours, complete the same work in 24 days and A
and A, B and C together take 4 hours to and C can together complete it in 36 days.
do the same. How long will it take for C In how many days can A, B and C, working
alone to accomplish the task? together, complete this piece of work?

TO ENROLL TOPPER CHOICE " MATHS VOD BATCH" DOWNLOAD "RG VIKRAMJEET" APP
Join Telegram- Maths by Aditya Ranjan Youtube:- Rankers' Gurukul

A vkSjB feydj ,d dke dks 18 fnuksa esa iwjk dj 2 1


ldrs gS] B vkSjC feydj mlh dke dks 24 fnuksa esa (a) 1
4
(b) 1
4
iwjk dj ldrs gSa vkSj
A vkSjC feydj bls 36 fnuksa
eas iwjk dj ldrs gSaA
A, B vkSjC rhuksa feydj bl 5 7
(c) 1 (d) 2
dke dks fdrus fnuksa eas iwjk dj ldrs gSa\ 8 4
SSC MTS 05/07/2022 (Shift- 3)
11. P and Q can complete a task in 30 days.
(a) 19 (b) 16 Q and R can do the identical task in 24
(c) 20 (d) 14 days, while R and P can complete it in
8. P and Q can complete a project in 15 days 20 days. They began working together, but
and 10 days, respectively. They started after 10 days, Q and R left. How long will
doing the work together, but after 2 days, it take P to complete the remaining task?
Q had to leave and P alone completed the
remaining work. In how many days was the vkSj Q feydj fdlh dke dks 30 fnuksa esa iwjk
P
whole work completed? dj ldrs gSaAQ vkSj R mlh dke dks 24 fnuksa esa

r
P vkSj Q ,d ifj;kstuk dks Øe'k% 15 fnukas vkSj dj ldrs gSa] tcfd R vkSjP mls 20 fnuksa esa iwjk
10 fnuksa esa iwjk dj ldrs gSaA mUgksaus ,d lkFk dj
dkeldrs gSaA mUgksaus ,d lkFk feydj dke djuk

si
'kq: fd;k] ysfdu 2 fnuksa ds cknQ dks NksM+uk 'kq: fd;k] ysfdu 10 fnu ckn] Q vkSj R us dke
iM+k vkSj
an by
P us vdsys 'ks"k dke iwjk fd;kA iwjk NksM+ fn;kA
dke fdrus fnuksa esa lekIr gqvk\ ysxk\
P 'ks"k dke dks fdrus fnuksa esa iwjk dj

n
SSC CGL 01/12/2022 (Shift- 01)
DP Head Constable 13/10/2022 (Shift-01)
(a) 11

ja (b) 12
R s
(c) 13 (d) 10 (a) 14 days (b) 17 days
9. Pawan can do a piece of work in 32 days. (c) 18 days (d) 21 days
a th

He worked for 8 days and left the work.


12. A can do a piece of work in 120 days and
Thereafter Sandeep finished the remaining
B can do it in 150 days. They work
work in 27 days. In how many days can
together for 20 days. Then, B leaves and
ty a

Pawan and Sandeep together do the whole


A alone continues the work. 12 days after
work?
that C joins A and the work is completed
iou ,d dk;Z dks 32 fnuksa esa dj ldrk gSA mlus 8
di M

in 48 days more. In how many days can


fnu dk;Z fd;k vkSj NksM+ fn;kA blds ckn lanhi us C do it, if he works alone?
'ks"k dk;Z dks 27 fnuksa esa iwjk fd;kA iou vkSj lanhi
A ,d dk;Z dks 120 fnuksa esa dj ldrk gS vkSj
B
feydj iwjs dk;Z dks fdrus fnuksa esa dj ldrs gSa\
mls 150 fnuksa esa dj ldrk gSA os 20 fnuksa rd
SSC CGL 13/12/2022 (Shift-04)
,d lkFk dk;Z djrs gSaA fiQj
B pyk tkrk gS vkSj
(a) 16
16
days (b) 16
13
days A vdsyk dk;Z tkjh j•rk gSA mlds 12 fnu ckn
17 17
C, A ls tqM+ tkrk gS vkSj dk;Z 48 vkSj fnuksa esa
15 14 iwjk gks tkrk gSA
C fdrus fnuksa esa dk;Z dj ldrk
(c) 16 days (d) 16 days
17 17 gS] ;fn og vdsys dk;Z djrk gS\
A

10. A, B and C can separately do a work in 6, DP Head Constable14/10/2022 (Shift-02)


10 and 15 days respectively. They started
to work together but C left after 2 days. (a) 280 days (b) 320 days
In how many days will the remaining work (c) 240 days (d) 270 days
be finished?
13. Aarif, Arun and Abraham can do a work
A, B vkSj C vyx&vyx ,d dke dks Øe'k% 6] in 12, 20 and 24 days, respectively. They
10 vkSj 15 fnuksa esa dj ldrs gSaA os ,d lkFk dke all begin together. Aarif leaves the work
djuk 'kq: djrs gSa ysfduC, 2 fnuksa ds ckn dke 1 day, Arun 3 days and Abraham 4 days
NksM+ nsrk gSA 'ks"k dk;Z fdrus fnuksa esa iwjk gksxk\
before its completion. In how many days
SSC CGL 09/12/2022 (Shift- 04) is the work finished?

TO ENROLL TOPPER CHOICE " MATHS VOD BATCH" DOWNLOAD "RG VIKRAMJEET" APP
Join Telegram- Maths by Aditya Ranjan Youtube:- Rankers' Gurukul

vkfjiQ] v#.k vksj vczkge ,d dk;Z dks Øe'k% A, B vkSjC ,d dk;Z dks Øe'k% 10] 20 vkSj 30
12] 20 vkSj 24 fnuksa esa iwjk dj ldrs gSaA os lc fnuksa esa dj ldrs gSaA ;fn izR;sd rhljs
B vkSj
fnu C
,d lkFk dk;Z 'kq: djrs gSaA dk;Z iwjk gksus ls 1mldh enn djrs gSa] rks A bl dk;Z dks fdrus fnuksa esa
fnu igys vkfjiQ] 3 fnu igys v#.k vkSj 4 fnu dj ldrk gS\
igys vczkge dk;Z NksM+ nsrk gSA dk;Z fdrus fnuksa SSC MTS 25/07/2022 (Shift-03)
esa lekIr gksrk gS
SSC CGL 12/12/2022 (Shift-04) 5
(a) 9 days (b) 8 days
11
(a) 8 (b) 10
(c) 11 (d) 9 2 5
(c) 8 days (d) 6 days
14. A and B working separately can complete 11 11
a piece of work in 10 and 16 days,
17. A, B and C can do a piece of work in 20
respectively. If they work for a day
days, 40 days and 60 days respectively.
alternately, with A beginning the work, in

r
starting with B In the work done, A takes
how many day(s) will the work be
the help of B and C on alternate days, then

si
completed? in how many days the work will be
A vkSjB vyx&vyx dk;Z djrs gq, ,d dk;Z dks completed?

an by
Øe'k% 10 vkSj 16 fnuksa esa iwjk dj ldrs gSaA ;fnA, B vkSj C ,d dk;Z dks Øe'k% 20 fnu] 40
os ,d fnu ds fy, ckjh&ckjh ls dk;Z djrs gSa]

n
A fnu vkSj 60 fnu esa iwjk dj ldrs gSaA
B ls 'kq:
}kjk dk;Z'kq: djus ds lkFk] dk;Z fdrus fnu@fnuksa djrs gq, dk;Z esaA, ,dkarj fnu ij] B vkSj C
esa iwjk gksxk\
ja dh lgk;rk ysrk gS] rks dk;Z dks fdrus fnuksa esa
R s
SSC CGL 03/12/2022 (Shift- 04) iwjk fd;k tk,xk\
a th

DP Head Constable 13/10/2022 (Shift- 02)


1 1
(a) 10 (b) 12
4 4 (a) 15 (b) 18
ty a

(c) 12 (d) 20
1 1
(c) 1 (d) 18. Ruchi, Khushi and Teju can do a piece of
di M

4 4
work in 30, 40 and 60 days respectively.
15. A can do a piece of work in 24 days in B In how many days can Ruchi do the work,
can do it in 80 days. B works alone for 2 if she is assisted by both Khushi and Teju
days and A works alone on the 3rd day. on every third day?
This process continues till the work is
completed. In how many days will the work #fp] [kq'kh vkSj rstw ,d dk;Z dks Øe'k% 30] 40
be completed? vkSj 60 fnu esa iwjk dj ldrs gSaA ;fn [kq'kh vkSj
rstw nksuksa gj rhljs fnu #fp dh lgk;rk djrs gSa]
A fdlh dke dks 24 fnu esa dj ldrk gS vkSjB
rks #fp fdrus fnu esa dk;Z iwjk dj ldrh gS\
bls 80 fnu esa dj ldrk gSAB nks fnu vdsys
dk;Z djrk gS vkSjA rhljs fnu vdsys dk;Z djrk SSC CGL 03/12/2022 (Shift-01)
A

gSA ;g izfØ;k dke iwjk gksus rd pyrh gSA dk;Z 550


fdrus fnu esa iwjk gksxk\ (a)
12
days

SSC CHSL 25/05/2022 (Shift- 01)


85
(a) 42 (b) 45 (b) days
4
(c) 48 (d) 44
71
16. A, B and C can do a piece of work in 10, (c) days
2
20 and 30 days, respectively. In how many
days can A do the work if he is assisted by 360
(d) days
B and C on every third day? 17

TO ENROLL TOPPER CHOICE " MATHS VOD BATCH" DOWNLOAD "RG VIKRAMJEET" APP
Join Telegram- Maths by Aditya Ranjan Youtube:- Rankers' Gurukul

19. A, B and C can do a piece of work in 18 20. A, B and C can do a piece of work in 11
days, 24 days and 36 days, respectively. days, 20 days and 55 days respectively.
On the first day A is assisted by B, and If B works daily and is supported by A and
on the second day C assists A. This 2-day C on alternate days beginning with A, then
cycle is repeated starting with A and B, in how many days will the work be
till the work gets completed. How long (in finished?
days) would it take to complete the work? A, B vkSj C ,d dke Øe'k% 11 fnu] 20 fnu
A, B vkSjC ,d dke dks Øe'k% 18 fnu] 24 fnu vkSj 55 fnu esa iwjk dj ldrs gSaAB;fn izfrfnu
vkSj 36 fnu esa iwjk dj ldrs gSaA igysB,fnu A dk;Z djrk gS vkSj
A ls 'kq: djrs gq, ,dkarj fnuksa
dh lgk;rk djrk gS] vkSj nwljs fnu
C, A dh lgk;rk esa mldhA vkSjC }kjk lgk;rk dh tkrh gS] rks
djrk gSA ;g 2&fnolh; pØ A vkSjB ls 'kq: gksdj dke fdrus fnuksa esa lekIr gks tk,xk\
dke iwjk gksus rd nksgjk;k tkrk gSA dke dks iwjks SSC CGL 06/12/2022 (Shift-01)
gksus esa fdruk le; (fnuksa esa) yxsxk\
1
DP Head Constable 17/10/2022 (Shift-01) (a) 10 (b) 9

r
3
(a) 12 (b) 10 (c) 12 (d) 8

si
(c) 11 (d) 13

an by
n
Answer Key

ja
R s
1.(d) 2.(c) 3.(a) 4.(a) 5.(a) 6.(d) 7.(b) 8.(b) 9.(a) 10.(b)
a th

11.(c) 12.(c) 13.(a) 14.(b) 15.(b) 16.(c) 17.(a) 18.(b) 19.(c) 20.(b)
ty a
di M
A

TO ENROLL TOPPER CHOICE " MATHS VOD BATCH" DOWNLOAD "RG VIKRAMJEET" APP