Supermarket Mega Solar Power Proposal

The document presents a proposal for mega solar power generation at supermarkets by utilizing large parking lots for solar panel installation, aiming for carbon neutrality by 2050. It outlines the necessary infrastructure, including solar panels, storage batteries, and inverters, to meet the energy demands of large supermarkets. The research indicates that this approach can effectively convert power consumption to clean energy while minimizing installation costs and maximizing land use efficiency.

Uploaded by

susuwai.ssw87
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views5 pages

Supermarket Mega Solar Power Proposal

The document presents a proposal for mega solar power generation at supermarkets by utilizing large parking lots for solar panel installation, aiming for carbon neutrality by 2050. It outlines the necessary infrastructure, including solar panels, storage batteries, and inverters, to meet the energy demands of large supermarkets. The research indicates that this approach can effectively convert power consumption to clean energy while minimizing installation costs and maximizing land use efficiency.

Uploaded by

susuwai.ssw87
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

[スーパーマーケット・ソーラー Supermarket solar]

Supermarket mega solar power generation proposal:


(2050 Proposal) Enabling mega solar power generation through combined use of land

Takeretsu IWATANI1), Taiga TATSUMI2), Shinichi TAMURA2), Yoshinori NISHINO2)


1) NBL Material Co., Ltd., 2) NBL Technovator Co., Ltd.
Summary: The large supermarket consumes 4,000kw to 6,000kwh / day of electricity, while the flat parking lot

has a vast area of 500 to 1,000 cars (10,000 to 20,000 ㎡). Power generation by solar sheet of 350wh / 2 ㎡ / in

about 4 to 5 hours is about 1.5kwh / sheet / day. Then, the required number of solar panels that can generate

5,000kwh / day is about 3,333, and the required laying area is about 7,000 ㎡. That is, it is possible if a vast

parking lot is used. Assuming that capacity of the required storage battery is 48 hours, the implementation

plan will be established by setting up the 10,000kWh battery and the 500kw inverter, and if the shortage is

covered by such as the nighttime power of the electric power company.

Keywords: 2050 recommendations, complex land use, mega solar power generation, supermarkets, fallow

farmland near cities

1. Introduction the floor, and put the stanchion pipe inside to form
In order to expand the application of solar power an arched frame and fix it.
generation to carbon neutral 2050 measures to At that time, a large arched dome is formed
prevent global warming, we conducted research to by three types of metal rods with turnbuckle screws
enable mega solar power generation by combined that connect the columns, and the required amount
use of land such as large commercial facilities, of solar panels are fixed by the mounting FRP
agriculture, and factories. Here, we report the members shown in the figure. It is shown that the
expected results of applying a large arched solar required power can be obtained by combined use.
panel laying dome that uses lightweight, high- The frontage of the arch strut is about 15 to 25 m
strength FRP pipes in addition to existing buildings. for a 2-3/8" tube, and the strut pitch is about 2 m,
which fits the output of about 350 w/sheet solar
2. Solar house that enables complex land use panel length of about 2 m and width of about 1 m.
2.1 Convenience store mega solar
Fig. 1 is an expected bird's-eye view when applied
to a convenience store where tens of thousands of
stores with parking lots are open. A GPI standard
9.5m long oil well pipe is connected, and an arched
dome with a frontage of 20m covers the required
area of the parking lot and convenience store with
a solar panel, showing an example that operating
power can be obtained by private power generation.
The basic structure is to bury a 5-inch casing pipe Fig 1: Convenience store mega-solar power generation

for fixing 2-3/8 inch GPI pipe stanchions used on Allowable strength is wind speed 50 m/s and 1m of

114
GPI Journal Vol. 7, No.2 (2021)

snow, the assembly can be done by attaching the Fig. 3 shows an example of laying a mega solar
wiring inside the wiring storage duct, indoor applied to hydroponic cultivation equipment
lighting, etc. with the tapping screw of the electric (agricultural land) and industrial facilities
impact wrench. (warehouses / factories). The minimum height of
The standard convenience store setting area the dome is 7m and the minimum frontage is 14m.
is about 12 parking lots, face-to-face parking, and The maximum is 15m / 30m. This is an example of
about 200 to 300 m2, and the store site is about applying a mega solar for dome construction for the
1000 m . The maximum power generation capacity
2
purpose of storing necessary agricultural and
is about 800kwh, which can cover almost all the industrial facilities in the dome and obtaining
required power consumption. private power generation for its operation with a
2.2 Mega solar of large super market solar.
Fig. 2 shows an example of applying Mega Solar to
a large store. The large supermarket consumes

Fig.3: Solar power generation for agricultural land /


industrial relocation

Here, regarding the cost performance of the


setup cost and the amount of power generation, the
Fig.2: Mega solar power generation for big super market trial calculation research result is described for the
installation cost assuming that the case is 10,000
4,000kw to 6,000kwh/day of electricity, while the
kwh.
flat parking lot has a vast area of 500 to 1,000 cars
<< Electrical installation costs >>: The most costly
(10,000 to 20,000 ㎡). If the number of solar panels
solar power supply is the storage battery. The result
that can generate power of 5,000kwh/day is 350wh
of the empirical research was that the construction
/2 ㎡/about 4 to 5 hours, about 1.5kwh/sheet/day
of a power storage facility using a rechargeable
is about 3,333, and the required laying area is about
battery was the lowest cost. The required battery is
7,000 ㎡ are calculated. That is, it is possible if a
25 kg per kwh, and if a storage battery is used,
vast parking lot is used. Assuming that the required
25,000 kg is required for 10,000 kw. From the
storage battery is 48 hours in consideration of rainy
market price, the material cost is about @ 60 yen /
weather, a 10,000 kwh battery and a 500 kw
kg, that is, if the chemical regeneration method is
inverter can be set up. On the other hand, for safety
applied, it can be set up for about ¥ 15 million. The
reasons, the plan can be established by making an
original scrap can be sold after the rechargeable
allocation contract with the nighttime electricity of
battery stops functioning, but if it is assumed that
the electric power company.
it will be used for maintenance costs and it is
2.3 Mega solar of agricultural land / industrial
durable 1000 times, the depreciation cost will be
facility

115
GPI Journal Vol. 7, No.2 (2021)

Weight Connection Buried


Arch pipe Pipe diameter (Length 9.5m) Span Connected Height height depth Allowable load

2-3/8” 66*54 ㎜ Approx. 20 ㎏ ~20m 3pieces ~8m 1m 0.6m Wind speed 50m/s

2-7/8” 77*63 ㎜ Approx. 30 ㎏ ~20m 3pieces ~8m 1m 0.6m 100 cm of snow


With standard
3-1/2” 92*74 ㎜ Approx. 40 ㎏ ~27m 3pieces ~10m 1m 0.6m snowmelt sprinkler
¥ 1.5 / kWh. gener ation panel is set up in an arched FRP
<< Installation cost >>: The house area required structure (about 60 million yen), power wiring
to generate 10,000 kW / day (10 MW) is work, storage battery installation work, and input
approximately 12,000 m2. Assuming that a power control / output control panel installation work
(details omitted, about 75
million yen), the estimated
construction cost Is estimated
to be @ ¥ 135 million /
10000kwh / day. In other
words, with 2200 days (6
years) depreciation, the cost of
electricity conversion is
calculated to be about ¥ 6 /
kwh.
Based on the above, the
large arch-type solar house
that uses megawatt-class FRP
strut pipes is super-cheap and
can be depreciated at a cost of
about 6 yen / kWh for 6-year
depreciation with 100% solar
panel installed. It has become
clear that even with 50%
depreciation, it is possible to
construct at about 10 yen /
kWh.

3. Large arch structure using


oil well pipes
The dome structure of the
FRP tube that enables the
arched solar house is
assembled from the members
Fig 4: Structural material for arched structure with GPI pipe shown in Fig.4.

116
GPI Journal Vol. 7, No.2 (2021)

The basis of the arch structure is utilizing the


characteristics of the flexibility of the FRP pipe 4. Mega solar power generation is possible by
(allowable elongation 1%). By forming the shape of combined use of land
a curved beam with four types of pull rods It was clarified that megawatt power can be
(crossbars) and the standard strut span, a large obtained by constructing a composite roof with a
dome with an arched structure is created. The large arched dome in the upper space with the
column FRP pipe is used without processing. maximum area of power required for existing
Therefore, the necessary members other than the facilities in Japan, which has a small land area.
FRP pipe used create the orthogonal fulcrum This shows that solar power generation by
function of the strut pipe by the frame common combined use of land is possible, and at the same
band shown in the figure. Here, M12 is used for all time, it shows that space utilization such as parking
bolts and nuts used in common. For parallel lots and space utilization proposals for the entire
fulcrums, use ⑳ frame band free joints. Build the site are effective. It was also clarified that the
necessary FRP pipe support structure with the 7 amount of power that can be generated by this
types of members in ⑲. Here, the applicable pipe combined use is comparable to the power
types are the three types of arch pipes 2-3/8“, 2- consumption required for convenience stores and
7/8”, 3-1/2” shown above, and the pipe type is large supermarkets in commercial facilities, and
selected according to the size of the frontage (span). that the necessary parking space used in
Furthermore, there are 7 types of required commercial facilities can be used. Furthermore, the
structure construction members, and ⑱ frame setup cost was within the purchase cost from the
common band differs depending on the applicable electric power company, and it was shown that all
pipe type. ⑲ 3 types of crossbar length are also the equipment could be constructed.
changed by changing the frontage. Furthermore, in the construction work shown
Here, the size of the solar panel mounting in Fig. 5, since the FRP columns are lightweight, it
FRP member shown in the figure of Fig. 1 also is easy to set up on the upper part of the existing
differs depending on the pipe type. building. It is also possible to set up a transparent

Fig 5: Arched solar house construction work using GPI pipe

117
GPI Journal Vol. 7, No.2 (2021)

plate. “Development and research of large FRP arched


greenhouse”, GPI Journal, Vol.7, no.2, pp.75-82,
5. Conclusion 2021.
As a researcher who is familiar with FRP oil well 3)Takeretsu IWATANI, Akio YONEZAWA, Taiga
pipes, in order to contribute to the national goal of TATSUMI, Shinichi TAMURA, Yoshinori
2050 carbon neutral, it is environmentally friendly, NISHINO, “Performance confirmation test of
and with amortizable funds for electricity usage, arched FRP vinyl house”, GPI Journal, Vol.7, no2,
consumption necessary for business establishments pp.96-100, 2021.
with parking lots such as commercial facilities to 4 ) Yukiharu Hayano, Takeretsu Iwatani, Taiga
operate. As a result of conducting basic research Tatsumi, Shinichi Tamura, Yoshinori Nishino,
that enables all electricity to be generated by solar “Research on large greenhouses using GPI
power generation, high-energy-consuming standard tubes”, 1st GUBS, National Conference
commercial facilities such as convenience stores of Society, 20-4, 2020.11.29
and large supermarkets have vast parking lots for http://www.nbl-

operational purposes. By using this land in technovator.jp/NBL_Tech/paper/ArchHouse2020.pdf

combination, it was found that it is possible to 5 ) Tomohiro Tabata, Takeretsu Iwatani, Taiga
transfer the power consumption of the 2050 target Tatsumi, Shinichi Tamura, Yoshinori Nishino,
to clean energy by solar power generation. “Research on arched solar house using GPI
Furthermore, by adopting a large arch-type dome standard FRP tube”, 1st GUBS Society National
structure with a strong GPI oil well pipe as a Convention, 20-5, 2020.11.29 20-5、2020.11.29
support, which requires a small installation area http://www.nbl-

and low cost, it is no longer necessary to purchase technovator.jp/NBL_Tech/paper/ArchHouseSolar2020.pdf

electricity for sale, which was necessary until now,


and it is possible to reduce costs.
These basic research results have discovered
that applications to mountainous areas, sea and
lake surfaces, and light-receiving surfaces where
sunlight shines, such as the roofs of current
buildings, need to be evaluated as energy resources.
We hope that the results of this research will serve
as a reference for some of the 2050 national goals.

References generally relate


1) GPI Standards:
http://gpi-pipe.org/
https://www.jstage.jst.go.jp/browse/gpijournal
https://www.jstage.jst.go.jp/browse/gpijournal/7/0/_contents/

2) Takeretsu IWATANI, Yoshinori NISHINO,