S.No.
DESCRIPTION SYMBOL
1 ENLARGER/TAPER (125X150,150x200)
2 DUAL PLATE CHECK VALVE (150 mm)
SUMP
Lvl.213.60 3 DISMANTLING JOINT (150/200mm)
2.30
6.85 4 MOTORIZED SLUICE VALVE (150/200mm)
W W W W
5 PUDDLE COLLAR (150/200 mm)
1.40 2.50 2.65 6.40
0.25
4 4
6 FLOW METER (150 mm)
7 PRESSURE SENSOR
3.53
3.53
W
1 1
8 EXPANSION BELLOWS (300 mm)
4.65
3 3 TREAD:0.20
2 2
PG PG
RISE: 0.25
0.75
7 7
4 4
PUMP BAY
12.05
3 3
Lvl.214.25 0.15
SECONDARY CONTROL
0.90
0.24
0.20
3
1.08
SCADA ROOM
Lvl.223.50
NOTES : -
DOWN
6
1. THE HEAD ROOM AT PANEL
W
9.75
0.40
0.60
VFD VFD SPACE IS 4.2M CLEAR OF
0.60
3.52
3.53
BEAMS IF ANY.
W
1.60
RS
MTC & VFD BAY
2.40
Lvl.219.00 2. MAIN PMCC SHALL BE
FRONT INSTALLED IN EXISTING
D1
SV
ELEVATION
0.60 PANEL
D D
PUMP HOUSE.
3. RCC WALLS OF DRY/WET
0.10
LOBBY LOBBY
Lvl.219.00 Lvl.223.50 SUMP AND COLUMNS ARE
2.40
2.40
D
AS PER STRUCTURAL
UP UP DESIGN.
4. DIMENSIONS OF THE
1.00 SPECIALS ARE AS PER IS
13382 : 2012 SECOND
REVISION.
1.25
0.33
GF PLAN FF PLAN
0.25
MUMTY
CLEAR HEAD
TOP ROOM 2 M TOP
ROOF THICKNESS AS PER DESIGN
3.50
RAJASTHAN URBAN SECTOR
DEVELOPMENT PROGRAM
ROOF THICKNESS AS PER DESIGN Lvl.223.20
(RUSDP)
BULK WATER SUPPLY SYSTEM
Lvl.222.00 FOR PALI
RAJASTHAN URBAN INFRASTRUCTURE
DEVELOPMENT PROJECT (RUIDP)
4.50
0.23
SHAH TECHNICAL CONSULTANT (P) LTD.
0.30
Plinth Lvl.219.00 2.57 Lvl.219.00 PL RS
VISHNU PRAKASH R PUNGLIA LTD.
0.60
FGL FGL
FRONT ELEVATION
0.25 0.33
1.50
0.40
3 1
4
Lvl.216.90 GA OF PROPOSED PUMP HOUSE MANDLI
CLEAR WATER HEAD WORKS
5.40
1.25
DRAWING NO. : CWPSM/GA SHEET NO. : 1 OF 1
4.50
SCALE : DATE :
REVISION NO. PURPOSE OF REVISION REV. DATE SIGNED BY
0.30 0.30 0.30 0.30 0.20 0.30 0.22 0.75 0.25 0.30 0.30
7 0.30
3 PG 2 8 1
3 5
4 4
PUMP
0.20
Lvl.214.25
SCALE :- ALL DIM. ARE IN MTR.S
SECTION A-A
Lvl.213.60 PURPOSE : APPROVAL
0 1 2 3 4 5
DRAWN BY CHECKED BY APPROVED