0% found this document useful (0 votes)
88 views1 page

Jan Bill Home

The document is an electricity consumer bill from Gujranwala Electric Power Company for the month of January 2025. It details the consumer's connection date, tariff, meter readings, and charges, totaling 7,076 PKR due by January 23, 2025. The bill also includes information on outstanding amounts and payment options.

Uploaded by

haroongamergrw
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
88 views1 page

Jan Bill Home

The document is an electricity consumer bill from Gujranwala Electric Power Company for the month of January 2025. It details the consumer's connection date, tariff, meter readings, and charges, totaling 7,076 PKR due by January 23, 2025. The bill also includes information on outstanding amounts and payment options.

Uploaded by

haroongamergrw
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

GUJRANWALA ELECTRIC POWER COMPANY GEPCO GST No.

25-00-2716-002-82

YOUR BETTER SERVICE - OUR PRIDE ELECTRICITY CONSUMER BILL www.gepco.com.pk

CONNECTION DATE CONNECTED LOAD ED@ BILL MONTH READING DATE (Pro-Rata) ISSUE DATE DUE DATE

07 MAR 22 1.5% JAN 25 08 JAN 25 14 JAN 25 23 JAN 25

CONSUMER ID TARIFF LOAD OLD A/C NUMBER DIVISION DIVISION - III

1124019976 A-1a(01) 2 SUB DIVISION KHIALI

REFERENCE NO LOCK AGE No of ACs UN-BILL-AGE FEEDER NAME 112211 MANDIALA MEER SAHKARAN

05 12133 1251977 R Web Generated Bill


MONTH UNITS BILL PAYMENT

Jan24 62 2215 0
Feb24 143 7969 7969
NAME & ADDRESS
REHANA KOUSAR Mar24 SS 0 648 0
M.KHALID Say No To Corruption
Apr24 LS 98 2941 2941
ALFLAH CITY
May24 158 2262 0
Jun24 201 10942 10942
Jul24 297 13416 14482
Aug24 246 8512 0
PREVIOUS PRESENT Sep24 EX 248 17128 9112
METER NO MF UNITS STATUS
READING READING
Oct24 EX 240 19925 19925
Pro-Rata Consumption
S-P 1658597 5666 5842 1 176 Nov24 EX 193 8124 8124
Outstanding
units : 29 Dec24 EX 104 4349 4349

GEPCO CHARGES GOVT CHARGES TOTAL CHARGES


UNITS CONSUMED 176 ELECTRICITY DUTY 80 ARREAR/AGE 0
COST OF ELECTRICITY 5292 TV FEE 35 CURRENT BILL 7076
METER RENT BILL ADJUSTMENT
GST 1074
Fix Charges
INSTALLEMENT
SERVICE RENT INCOME TAX
FUEL PRICE SUBSIDIES 0
EXTRA TAX
ADJUSTMENT
F.C SURCHARGE 568.48 FURTHER TAX
PAYABLE WITHIN DUE DATE 7076
L.P.SURCHARGE 295 589
QTR TARRIF ADJ/DMC 26.67 RETAILER STAX Till 27-JAN-25 After 27-JAN-25
PAYABLE AFTER DUE DATE 7371 7665
TOTAL 5887.15
Pro-Rata based Present Reading instead of
Recorded
BILL CALCULATION GST ON FPA
ED ON FPA
FURTHER TAX ON FPA
S.TAX ON FPA `
GOP Tariff x Units IT ON FPA
30.0700 X 176 ET ON FPA
-----------------------------
TOTAL TAXES ON FPA

TOTAL 1189 For Complaints Please Use:


"NEPRA ASAAN APPROACH"
DEFFERRED AMOUNT (Mobile App)
OUTSTANDING INST. SDO #
AMOUNT 055-4285112 /03183992133 For complaints dial: 118 /SMS:
XEN # 8118
PROG. GST PAID F-Y PROG. IT PAID F-Y
055-4218871

GUJRANWALA ELECTRIC POWER COMPANY - ELECTRICITY BILL NO


CONSUMER BILL 1

YOUR BETTER SERVICE - OUR PRIDE CONSUMER ID 1124019976

www.gepco.com.pk BANK
STAMP

JAN 25 - 05 12133 1251977 - 000007076 - 23 JAN 25 - 000007371 - 270125 - 6

BILL MONTH DUE DATE REFERENCE NO PAYABLE WITHIN DUE DATE 7076

Till 27-JAN-25 After 27-JAN-25


JAN 25 23 JAN 25 05 12133 1251977 R PAYABLE AFTER DUE DATE
7371 7665

You might also like