0% found this document useful (0 votes)
130 views12 pages

Slope Protection Plan for Adit Portal

The document outlines the work description and quantities for a slope protection project near the intake adit portal of NTPC Barrage Tapovan. It includes tasks such as surface scaling, installation of wire rope nets, and excavation, along with a work plan detailing the execution timeline for June 2024. The Bill of Quantities (BoQ) lists executed and balance quantities for various tasks, indicating progress and remaining work.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
130 views12 pages

Slope Protection Plan for Adit Portal

The document outlines the work description and quantities for a slope protection project near the intake adit portal of NTPC Barrage Tapovan. It includes tasks such as surface scaling, installation of wire rope nets, and excavation, along with a work plan detailing the execution timeline for June 2024. The Bill of Quantities (BoQ) lists executed and balance quantities for various tasks, indicating progress and remaining work.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

[Link].

5
6

7
PROJECT N

Work Description Unit

Surface loose scaling with remova of shrubs as per site


requirement Sqm
Providing aidth aying galvanized steel wire rope net made
of 9.0 mm diameter wire with aperture size
0.30m*0.30m of 5.0 m width Sqm

Supply and installation of secondary mesh (Mesh size


50*50mm , mesh wire dia of 2.4 mm, lacing wire dia of
2.2mm Sqm

SDRA of 8.0 m length with 38/19mm diameter @1.7m c/c,


bearing plate size 200*200*10mm
Nos.

Supply and installation of RCC precast size


0.15*0.15*2.0m of M15 grade concrete for anchoring the
rope net Cum
Excavation of soft soil/sofidth ck present on top of
cutting,a top trench of 1.0m depth and 0.6m width
Cum

Supply and Installation of M10 concreting for embedding


the concrete precast slab inside the trench for 0.3 m Cum
depth
WORKPLAN Month June
PROJECT NAME: Slope protection work near intake ad

BoQ Executed Quantity Balance Quantity


upto 25/05/24

910 185 725

1625 0 1625

1625 0 1625

562 58 504

0.84 0 0.84
22.16 0 22.16

6.65 0 6.65
AN Month June-24
k near intake adit portal NTPC Barrage Tapovan
Week 1 Week 2
(27th May- 02nd June) (3rd June-9th June)

250 225

50 60
age Tapovan
Week 3 Week 4
(10th June-16th june) (17th Jun- 23rd June)

250

60 60
10
Week 5
(24th June- 30th June)

300

300

60

0.84
12.16

6.65