The document outlines a designed plan for industrial engineering and management focusing on sampling plans with normal inspection. It includes details such as lot sizes, inspection levels, acceptance and rejection numbers, and sample sizes for both single and double sampling plans. Additionally, it presents an observation table for coding and practical questions related to the experiment.

Uploaded by

prince19068
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
412 views2 pages

Prac 11

The document outlines a designed plan for industrial engineering and management focusing on sampling plans with normal inspection. It includes details such as lot sizes, inspection levels, acceptance and rejection numbers, and sample sizes for both single and double sampling plans. Additionally, it presents an observation table for coding and practical questions related to the experiment.

Uploaded by

prince19068
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Industrial Engineering and

Management (4361901)
Designed Plan:
SINGLE
SR. NO.
SAMPLING PLAN WITH DOUBLE SAMPLING PLAN WITH
NORMAL INSPECION NORMAL INSPECTION
1
Lot Size N= TO) CO
2 Lot Size N=
3
Inspection Level =
AQL = Inspection Level = TI
4. AQL =
Code letter =
Code Level =
5
Sample size, n = 13 Sample size, n1 = 3
n2 = |3
6
Acceptance number, a= Acceptance number, a1=
7.
Rejection number, r= Rejection number, r1 =
a2=4
3
r2 =
Observation Table:
Coding of icosahedrons.
1st digit- Red- Shelf
2nd digit - Green - number
Column number
3rd digit - Blue - Raw
number.
LOT NUMBER-1
LOT NUMBER -2
R S
1ST 2ND 3RD R.
DIGIT A OR R 1ST 2ND 3RD
DIGIT DIGIT N DIGIT A OR R
DIGIT DIGIT
3 2
2 1
A 2
A
A
2 R
2
A
oot ) A L A
A 2. A
2 R 2 2 A
A
10
54 | Page 6 2
Industrial Engineering and Management (4361901)

2 6 12
2
13 13

A
2
16 A
2 R
2

24 2 A
12 3 A
23
2U
25 9 A
26

K. Conclúsion:
L
Practical related Questions:
1. 'State the
method you have adopted in this experiment to
number. generate random
2. If you intend to
3. Define
follow
general inspection level five what will be
the code letter?
a. Acceptance Sampling.
b. AQ
C.
Acceptance number
d. Rejection number
4. State the factors
affecting the sample plan.
(omchustm
Jajn
knoledye
55 |Page ’'Bmplig plum clbout Pellecung thgs