Weekly Progress Report
Weekly Progress Report
100.00%
2.00 Construction of culverts 76.00 No's 76.00 No's 0.00 No's 76.00 No's Completed
100.00%
100.00%
3.00 Construction of retaining walls 343 Rm 343 Rm 0 Rm 343 Rm Completed
100.00%
4.00 Construction of Minor Bridges 2.00 No's 0.00 No's 0.00 No's 0.00 No's 0.00% Not Yet Started
100.00%
8.00 Cement Concrete Pavement 41.00 Km 4.00 Km 0.20 Km 4.20 Km 10.24% Under Progress
100.00%
10.00 Masonary Lined Drain 11.820 Km 5.000 Km 0.665 Km 5.67 Km Under Progress
47.93%
100.00%
11.00 Road furniture 41.00 Km 0.00 Km 0.00 Km 0.00 Km Not Yet Started
0.00%
100.00%
Page 1 of 6
Construction of Bamboo Link Road from Lengpui to Saiphal Bamboo Plantation (41 Km) under PM-DevINE
Weekly Progress Report for the week
Achevemnet
This week
upto previous
Qty as per Cumulative progress
Sl/No Item Discreptions week Progress Chart Remark's
Agreement Achievment
Dt: 30/12/24 Dt: 05/01/25
Km/Nos/Rm Km/Nos/Rm Work Done CA Scope
100.00%
100.00%
1.00 Earthwork upto top of the Subgrade 41 Km 41 Km 41 Km 0 Km Completed
100.00%
2.00 Gravel Soil Agg. Base 7.145 Km 7.145 Km 7.145 Km 0 Km 100.00%
Completed
100.00%
3.00 WBM For Pavement 27 Km 27 Km 27 Km 0 Km 100.00%
Completed
0.00%
4.00 WBM For Shoulder 41 Km 0.00 Km 0.00 Km 0 Km Under Progress
100.00%
10.24%
5.00 Cement Concrete Pavement 41.00 Km 4.20 Km 4.00 Km 0.20 Km Under Progress
100.00%
100.00%
6.00 Hume Pipe Culvert Type-I 40 No's 40 Km 40 No's 0 No's Completed
100.00%
100.00%
7.00 Hume Pipe Culvert Type-II 17 No's 17 Km 17 No's 0 No's Completed
100.00%
10.00 Minor Bridge 2 No's 0 Km 0 No's 0 No's 0.00% Not Yet Started
100.00%
Page 2 of 6
Work Done CA Scope Item Description
41 Km 41 Km
7.145 Km 7.145 Km
27 Km 27 Km
0 Km 41 Km
4.20 Km 41 Km
40 No's 40 No's
₹ 60,000,000.00
₹ 0.00
₹ 120,000,000.00
₹ 180,000,000.00
₹ 240,000,000.00
0 No's 2 No's
Page 3 of 6
tion Betwwen 14.00 - 41.00)
Column EQ
Unlined Drain
40 Rm 40 Rm
Nidhi Creative Infrastructure Private Limited
Road furniture
0 No's 41 No's
5665 Rm 11820 Rm
Construction of Bamboo Link Road from Lengpui to Saiphal Bamboo Plantation (41 Km) under PM-DevINE
28886 Rm 28886 Rm
Up to Date: 05/01/25
Qty As Per
Work Done Agreement Item Description
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
27 Km 27 Km WBM Pavement
33.59%
7 No's 7 No's RCC S.C Ty-II
Balance Work
MNB
Page 4 of 6
0 No's 2 No's
R/w Ty-I
209 Rm 209 Rm
66.41%
Work Done
Cumulative Physical Progress%
R/w Ty-II
94 Rm 94 Rm
Detailed Physical Progress Bar Chart
R/w Ty-III
40 Rm 40 Rm
Nidhi Creative Infrastructure Private Limited
Road Sianage
0 Each 356 Each
KM Stone
0 No's 41 No's
Boundary Pillar
0 Each 410 Each
M. linede Drain
5665 Rm 11820 Rm
Sr. Executive Engineer, PWD.,
M. Unlinede Drain
28886 Rm 28886 Rm
National Highway Division-I, Aizawl.
Construction of Bamboo Link Road from Lengpui to Saiphal Bamboo Plantation (41 Km) under PM-DevINE
Up to Date: 05/01/25
Sr. Sub-Divisionasl Officier, PWD.,
National Highway Division-I, Aizawl.
Page 5 of 6
Construction of Bamboo Link Road from Lengpui to Saiphal Bamboo Plantation (41 Km) under PM-DevINE
Detailed Scope of Work, Physical Progress by Component & Work Done
Value of
Weightage in Weightage
Planned in scope % Physical physical
Component percent to Item Description by Work Done upto
(as per work scope) progress progress
the contract component
(7*4)
Quantity
% Quantity Unit Unit
1 2 3 4 5 6 7 8
A-Widening and strengthening of
Road works including culverts, widening and repair of
existing road
1. Earthwork up to top of sub-grade 6.42 41.00 Km 41.00 Km 100.00 6.42
89.41%
28.58 - -
Wing wall and return wall) 1.00 No
2.29%
Page 6 of 6