0% found this document useful (0 votes)
51 views7 pages

Copy of PL-EnG-001 Task Training I - Revised As of Sep 2022

The Practical Logbook outlines the training program for newly hired Assistant Engineers in the A/C Systems Engineering section, detailing the structure, scope, and estimated duration of the training. It includes sections for personnel data, training tasks, and completion signatures from trainees, coaches, and assessors. The logbook serves as a record of skill development and is essential for quality checks and archiving after training completion.

Uploaded by

youngzu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views7 pages

Copy of PL-EnG-001 Task Training I - Revised As of Sep 2022

The Practical Logbook outlines the training program for newly hired Assistant Engineers in the A/C Systems Engineering section, detailing the structure, scope, and estimated duration of the training. It includes sections for personnel data, training tasks, and completion signatures from trainees, coaches, and assessors. The logbook serves as a record of skill development and is essential for quality checks and archiving after training completion.

Uploaded by

youngzu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Practical Logbook Control No.

: PL-ENG-001

Org. Date: 12-April- 2019


A/C Systems Engineering Section Task Training I Rev. No: 03
Rev. Date: 20-Sep-2022
Personnel data of trainee
1. Full Name of the Trainee: ___________________________

2. ID No.: __________
3. Position assigned: ______________________
4. Dep’t/Cost Center assigned: ________/__________

Personnel data of coach (max. 2):


1. Full name of the Coach : _____________________________
ID No.: _________
2. Full name of the Coach : _____________________________
ID No.: _________

Time data: Mark and sign completion entries


Estimated duration:__________________ Date PL received: ______________________ Yes No
Date of issuance:________________ 1) Quality check performed
Start date: ___________ 2) Training entered into IT system
End date: ____________ 3) PL scanned and archived
Actual duration: _____________________ 4) Original filed in his/her Personal file
5) Hard copy given to trainee

Full Name (Filled by HR Dev't and Admin-MRO ) ID Position Signature Date

1. Introduction

This Practical logbook provides the basic Training required for Assistant Engineer under all teams in A/c Systems Engineering section. It is structured to guide the trainee to have a recorded, fast
tracked and complete skill development.

2. Scope of performance:
This PL training is designed for a newly Joining Assistant Engineer to give an overview of how the overall aviation industry business processes are organized , and to familiarize in particular 'what'
why'and 'how' to discharge the responsibility as a professional she/he has joined. Once the employee has completed this PL,she/he will be ready to assist in handling some practical assignments
in A/C Systems Engineering team.

3. Estimated training period


This Logbook shall take an estimated duration of 45 to 60 Days. While carrying out this PL the trainee should spend enough time with the assigned coach on each items of the PL requirements until
adequate information, knowledge and skill are attained.

4.Signature:
All performed training have to be signed by trainee and trainer/Coach.
The signature must be done with handwritten signature in black or blue ink.
5. Completion of the logbook:
Entries in the checklist are made by 3 person:
5.1. The trainee

Certain pages require the name and signature of the trainee. This is primarily for traceability and identification purposes, particularly when logbook pages are separated from the logbook and used in isolation.
5.2. The Coach
The coach has to sign to confirm that the training for Assistant Engineers in the A/C Systems Engineering section is completed.
5.3. The Assessor

When confirming entries, assessors shall write his name and sign, and also quote their position within the organization on behalf of which the assessment has been carried out.

After completion of the training for Assistant Engineers in A/C Systems Engineering section, send the completed practical logbook to the coordinator of training and qualification. There the logbook shall be checked for quality and
record archiving shall be done. Then the original logbook shall be returned to the trainee.
Date Signature of Signature of
Item Programs Duration Trainer/ Coach performed Trainee Trainer or Coach Remark

1 Assigning a Coach and introduction Half day Team Leader


2
Introduction to Aviation (Aviation Basics)
Design & Production Organization
Basic of CAMO & AMO Function One Day Assigned Coach
Air operator (AOC) & Commercial services
Airport

International, regional and local Civil Aviation


Authorities/Organization/Association
*ICAO, IOSA and IATA
One Day Assigned Coach
*EASA, FAA, Transport Canada Civil Aviation (TCCA), Civil Aviation Administration of
China(CAAC)
*ETCAA

Aviation Terminologies
- Hangar, A-check, C-check, D-Check
- runway, Control tower, Takeoff, Cargo, Airways/Route, Airport
One Day Assigned Coach
- Landig Gear, Fuselage, Stall, Nose, Tail
- Flight Compartement (cockpit), Wing, Autopilot,Thrust
- etc
3
ET-Vision,Mission,values &Organizational structure
ET Vision, Mission and Values
Ethiopian Aviation Group
ET-MRO Organizational Structure & Function One Day Assigned Coach
ET-AEP Organizational Structure & Function
ET-ASE Organizational Structure & Function
Basics of ACE

4 Visiting Major ET Departments Assigned Coach

MRO HR & Finance


Engineering QA
MRO QA & Safety
A/C Power Plant Systems Engineering Team Five Days
Base Maintenance Planning & Record Control
MP & TC Engineeing & Documentation
BMT Technical support

Base Maintenance (All Hangars)


Cabin and Structure shops
Line Maintenance, MCC & Line maintenance Planning
Five Days
Component Eng'g
'Component Shops
'Engine shop & 'Engine tech support

Product supply Chain Management


- Tactical Purchase BMT
- General Purchase
- Warehouse and Inventory Management A/C Parts
- Warehouse and Inventory Management Non A/C Parts, surplus Admin
- Tactical Purchase LMT & CMT Five Days
- Strategic Sourcing, Technical
- Strategic Sourcing, Non Technical
- Group Logistics Mangement
- Inventory Control and Audit
- Warranty and Contract Management

MRO Customer Support


MRO Sales Manager
Two Days
Simulator
Other sections that need to be visited
5 Maintenance & Engineering IT System Familiarization Ten Days Assigned Coach
Maintenix
Portal
Tool Box
Outlook
Basic computer utilization & Ms office usage (word, excel, MS project etc)
Ms Teams
Skype for Business
Servers
Company Manuals & TPM locations
Manufacturer Websites (MBF, Airbus World, iFly Bombardier/De havilland, Collins
Aerospace, Honeywell, GE, RR, etc)
6 Over veiew on CAMO (A/C Engineering & Planning), Documents & Related
Assigned Coach `
function Familiarization
How to keep A/C Continuous Airworthiness
Regulatory Body Documents (AD, AC, AMOC, mandates) Two days
Manufacturers Documents (SB, SL/MT, FTD/TFU, ISAR)
Aircraft/Component/Engine Maintenance Documents
- AMM
- AIPC
- CMM
Two days
- WDM
- SSM
- SRM
- SWPM

Operation Documents
- FCOM
- AFM
Two days
- DDG
- MEL
- CDL
7 Ten days Assigned Coach
ASE Basic Activities (Just let the coachee to know list of ASE Responsibilities)
AD handling
SB handling
SL handling
Technical Notices (MSL) to Maintenance and Flt Ops
Regulatory Body requirement compliance
DFDR/CVR Data Analysis
ECM Report
DACS
MRR Preparation
RRR Preparation (Reliability study)
​Reliability Control Program
Cabin/IFE/ Avionics Modification Projects, STC
BFE customization (Seats, Galley, IFE, Galley Inserts, etc)
Airplane Loadable Software Handling
A/C weight and Balance Control
Operational and performance document preparation (AHM560, Trim sheet, loading
Instruction manual, LOPA, EEL, Seat Map)
A/C configuration management
Technical support to diiferent sections
Maintaning ACE
EO Preparation
8 -Environmental Awareness, Safety & Security half day Assigned Coach
- Create awareness about the requirements to get into MRO premises
- Create awareness about the safety measures an individual should take when
visiting Hangars & line maintenance
- Let the coachee to know about breakfast & meal options
9 List of Trainings (Let the coachee to know the list of Trainings and why they are half day Assigned Coach
important)
Regulatory Bodies Mandatory Trainings
Individual Development/Skill
10 Three Days Assigned Coach

Personal Development
10.1 Communication Skill
- Active listening
- Public speaking and presentation
- Writing skills
- Verbal and non-verbal communication
- Negotiation
- Persuasion
- Leadership
- Teamwork
- Empathy
- Compassion
- Patience
- Diplomacy
- Emotional Intelligence
10.2 Intellectual Curiosity
- Problem-solving
- Creativity
- Critical thinking
- Innovation
- Brainstorming
- Research
10.3 Openness to Feedback
- Adaptability
- Collaboration
- Self-awareness
- Resilience
- Cooperation
- Respectfulness
- Flexibility
- Managing your emotions
- Humility

Aviation Safety/security
HR Policies & company culture, specifically Engineering culture
- Flexibility
- punctuality
- etc
Briefing/Alerting the positive/negative impact activities performed by the Engineer in
11 ETH operation Half day Assigned Coach/Mgr ASE

Assessment Record
The trainee must work through the PL list correctly before the assessment record is done. The assessment record confirms the completion of the practical logbook and the successful passing of the practical assessment.

Date of
Signature of
Item No. Description of Task assessment
assessor

Describe the overall business stake holders and their role of different aviation industry stakeholders with
1
examples relating with Ethiopian experience.

Demonstrate understanding ET-Vision 2035, Ethiopian Organizational structure and ACE tools relating to
2
your job assignment.

3 Demonstrate understanding and your role as a System Engineer on AD/SB ahndlinga nd EO preparations

Demonstrate understanding on ASE section Basic Activities and products some practical Examples you
4
worked on.

1. Practical Logbook 3. Method of working Yes No


1.1. Check That the PL is correct and completely Yes No 3.1 Work correctly performed according to documents
filled out and policy and procedure (TPM/MOE/MPM/MCM/RSM/QCM)

4. Correct Documentation Yes No


2. Demonstration Yes No
5.1 Correct documentation of Documment References
2 .1. Demonstration of the assessment /Letters
record in the right way 5.3. Correct entry of all data/Document into the system

Yes No
ASSESSMENT PASSED SUCCESSFULLY
The assessment is passed if all criteria are fulfilled.

Name of Trainee Signature

Name of coach Signature

Name of assessor Signature


Write reason(s) for non-fulfillment of criteria.

You might also like