Lalitpur 660 MW Pump Specification Sheet
Lalitpur 660 MW Pump Specification Sheet
1.0 GENERAL
This Engineering Selection Sheet provides required Design and Performance Parameters for the LP
Startup Condensate Pumps for Lalitpur Super Critical TPP (3x660 MW) situated in Uttar pradesh. This
has to be read along with pump Technical Specification No:PC:TSP:LPSS: CON-PUMP:001
2.0 EQUIPMENT
2.1 The pumps covered by this specification are identified in the following table.(per boiler)
pH 8.5 – 9.6
Construction
Pump Type
Pump Model
Make
Liquid to be pumped
Specific gravity
PH
Service
Fluid Temperature, ºC
Capacity (m3/hr)
At Design Point *
Maximum Flow
Minimum Flow
At Runout Flow *
At Design Point *
Maximum Flow
Minimum Flow
At Runout Flow *
At Design Point *
Maximum Flow
Minimum Flow
At Runout Flow *
At Design Point
At Maximum Flow
Suction weld neck flange
SIZE/RATING/MATL
Discharge weld neck flange
SIZE/RATING/MATL
Impeller diameter for design conditions, mm.
CONTENTS
1.0 GENERAL
8.0 EXCEPTIONS
SPECIFIC)
1.0 GENERAL
1.1 These specifications cover the design, engineering, performance, manufacturing and
testing requirements for complete 100% capacity, centrifugal, horizontal, double suction,
pump assemblies with electric motors for the LP start up system condensate pumps.
1.1 The following terms used herein with initial capitalization, whether singular or plural
shall have the following defined meanings:
Purchaser BHEL
1.2 The specification is intended to cover all of the work. Unless expressly excluded, any and
all equipment, labor, material and services not indicated therein but which may be
necessary to complete any part of the work in a proper, substantial and workmanlike
manner shall be furnished by the Seller without additional cost to the Purchaser. Any
intended omission or exceptions to the requirements of this Specification are included in
the “EXCEPTIONS TO THE SEPCIFICATIONS” sheet.
1.3 These specifications establish the requirements for the condensate pumps and
appurtenances, as specified therein. The requirements of these specifications are the
minimum for the equipment and are to be supplemented by the Supplier’s own
requirements.
1.4 The Supplier shall comply with all of the requirements of these specifications. Approval
of any drawings and/or test results shall in no way relieve the Supplier from these
responsibilities.
2.1 BY SUPPLIER
2.1.1 It is the intent to have the Supplier provides each pump and driver
mounted on a common base plate, designed for minimum field
installation and assembly.
2.1.2 Equipment tag nos. for each pump / motor – As specified in data
sheet
2.1.3 The equipment, material and services to be supplied by the Supplier
shall consist of the following:
3
Bharat Heavy Electricals Ltd, Piping Centre, Chennai-600017
a. The scope shall include each pump unit with all equipment, such
as motors, coupling with guard, mechanical seal, seal cooling
plan, base plate companion flanges with fasteners, anchor bolts
with fasteners and auxiliaries fully assembled and wired,
requiring only connection to BHEL piping, electrical and
control systems. Final alignment will be performed during pump
installation.
b. All equipment shop tests as specified herein.
c. Expedited schedules, drawings, procedures, pump and motor
curves, test reports and other documents and information
specified herein.
d. List of commissioning/mandatory spare parts for the pumps,
motors and accessories.
2.2 EXCLUSIONS
3.1 The publications listed below form a part of these specifications as applicable.
This publication listing is intended to identify the codes and standards applicable
to the design, fabrication and erection of the condensate pumps, but may not be
all inclusive. The seller shall comply with all applicable codes and standards,
whether or not identified in this listing. The text refers to these publications by
the basic designation only. When specific requirements are stated in these
specifications conflict with those required by codes and standards listed herein,
the more stringent requirement, as interpreted by the Purchaser, shall govern.
Such conflict shall be brought to the Purchaser’s attention in writing for
disposition.
edition and revision, in force as of the date of the purchase order, of the
following codes and standards.
3.3 Additionally, the pumps shall comply with all currently applicable statutes,
regulations and safety codes in the locality where the equipment will be installed.
3.4 The seller shall indicate the standards and codes to be used and shall list all
differences.
3.5 All drawings and data sheets shall be in Metric units / SI units. All words shall be
in the English language.
4.1 General
4.1.1 The condensate pumps will be used to transfer hot condensate water
from the Flash tank Drain tank (FTDT) to the main steam turbine
condenser hotwell for reuse. Operation of the pumps will be
intermittent, used during plant start up and shut down operations, and
may be used on a more continuous basis during normal plant
5
Bharat Heavy Electricals Ltd, Piping Centre, Chennai-600017
operations. In case of one pump failure, the other pump should have
the capability to deliver the runout flow as indicated in the datasheet.
4.1.2 Each pump shall be designed for operation using the criteria
specified in Document [Link]-001 “Engineering selection sheet for
condensate pumps”.
4.2 Materials
4.2.2 Material options with pricing may be provided by the seller, along
with an explanation of the material options advantages,
disadvantages, costs and/or other benefits.
4.3 It is the intent to have the seller provides the pumps complete with drivers, with
each pump/motor combination mounted on a common base plate, designed for
minimum field installation and assembly.
4.4 The equipment specified herein will be installed outdoors at the site located in
India. Design data for this facility is provided in Selection sheet [Link]-001
“Site location information”.
4.5.2 The pumps will be arranged in parallel and will take suction from the
bottom of the flash tank drain tank.
[Link] The wetted parts of the pump shall be suitable for the fluid
handled by the pump (hot condensate).
7
Bharat Heavy Electricals Ltd, Piping Centre, Chennai-600017
4.7.1 Two (2) or more pumps will be aligned / piped in parallel and will
operate independently from each other.
4.7.5 The pumps shall be designed for intermittent duty and shall be
designed to accommodate the quantity of starts & stops as
recommended by the ANSI / NEMA MG-1.
4.8.2 The manufacturer shall indicate the specific speed of his design at
the best efficiency point and the specific speed limitation as imposed
by ANSI/HI.
4.8.3 Pump vibration shall not exceed the acceptable limits for centrifugal
pumps given by ANSI/HI at all discharge rates from minimum flow
to pump maximum flow (run out). The maximum net positive
8
Bharat Heavy Electricals Ltd, Piping Centre, Chennai-600017
suction head required by the pump shall be at least 1.0 meter less
than the NPSH available at the design point.
4.8.4 The pumps shall operate without vapor binding or cavitation at all
operating conditions.
4.9.3 The characteristic curves shall indicate pump performance from zero
capacity to the pump run out capacity during single pump operation
and during two pump parallel operation while switching operation
from one pump to the other.
4.9.4 Speed torque and motor performance curves shall also be submitted.
4.10 Testing
4.10.1 The seller shall perform a shop hydrostatic test and non cavitating
performance test.
for vibration and noise. The pumps shall be tested over the range
from shut off head to maximum flow. The duration of the test shall
be minimum one (1) hour. A minimum of five (5) readings,
approximately equidistant shall be taken for plotting the performance
curves.
Note: the negative tolerance on efficiency shall be limited to 2.5%
and not 5% as indicated in Indian standard 5120.
4.10.4 The hydro test pressure on the casing shall be 1.5 times maximum
discharge head or twice the differential head, whichever is higher.
Maximum discharge head is defined as the sum of the shutoff head
and the maximum suction head. The duration of the test shall be
minimum thirty (30) minutes.
4.10.5 In the event of leakage, the procedure for repairs shall be subject to
review by the Purchaser. After the repair, the pump(s) shall be
successfully hydrostatically re-tested at 1.5 times (minimum) the
shut off discharge pressure.
4.10.7 If the shop performance tests indicate the tested pump fails to meet
the guarantees stated herein, the other pump shall be shop tested in
accordance with the stated requirements specified herein.
4.10.8 Any pump not meeting the guarantees shall receive all adjustments,
repairs, additions, or replacements as required at the seller’s expense
for it to meet the guarantees.
4.10.10 Certified test reports containing all test data, pump performance
curves and head capacity curves shall be submitted by the pump
supplier to BHEL.
4.10.11 After the pumps/drivers have been installed at the site, they shall be
subjected to testing. If the site performance is found not to meet the
10
Bharat Heavy Electricals Ltd, Piping Centre, Chennai-600017
4.11 Guarantees
5.1.3 Permanently installed lifting eyes or lugs shall be provided for each
pump and motor assembly to facilitate installation and maintenance.
11
Bharat Heavy Electricals Ltd, Piping Centre, Chennai-600017
5.2 Shaft
5.2.1 The pump shaft shall be sized to transmit the power requirements of
the pump during all modes of operation without distortion or
excessive vibration.
5.2.2 The shaft shall be ground and polished over its entire length.
5.2.3 The impeller shall be firmly keyed and secured to the shaft in proper
axial position. It shall be cast in one piece, accurately machined,
finished all over and the water passages finished to the proper
contour. The impellers shall be balanced in two planes to ISO Grade
G6.3, as a minimum and comply with the vibration limits of the
hydraulic institute. In addition to static balancing, impeller and
balancing drum shall be balanced dynamically at or near operating
speed.
5.2.4 Each shaft shall be designed so that no critical speed will occur
within a 25 percent margin of the operating speed of the pump. It is
preferred that the first critical speed of the pump shall occur above
the pump operating speed.
5.3.2 Screwed, shrink, or press fits on the shafts are not acceptable
coupling attachment configurations.
5.3.3 The shaft coupling shall be sized to transmit the maximum brake
horsepower requirements of the driven equipment with a service
factor of not less than 2.
5.3.4 Shaft couplings shall be used between all drives and driven
equipment. Couplings shall be attached to driver and driven shafts
by keys. Couplings shall be of the non lubricated, all metal (stainless
steel) flexible disk type. Couplings for motors with ratings less than
250 hp shall have elastomeric elements.
5.4.2 Access shall be provided for dismantling the drive shaft coupling and
for maintenance and inspection of the pump seal. The coupling
guard shall be the removable type.
5.5 Casing
5.5.1 The pump casing, including suction connection shall be rated for the
design conditions of the pumping system. Suction and discharge
connections shall be raised faced flanged (ANSI Class 150). The
casing shall be drilled and tapped for venting and draining and
pressure connections with threaded plugs provided. Flange drilling
shall comply with the provisions of ANSI B16.5.
5.5.2 The Pump supplier shall supply one companion suction flange and
one companion discharge flange for each pump. Flanges shall be
ASME Class 150, raised face, weld neck type.
5.5.4 The pumps shall be provided with replaceable front and back wear
rings for casings. Rings utilizing threads are unacceptable.
5.5.6 The corrosion allowance for all pump pressure parts shall be a
minimum of 3 mm.
5.6 Bearings
5.6.1 Pump bearings shall be of the anti-friction type with regreasable type
bearing lubrication. Anti-friction bearings shall be designed for
AFBMA L-10 life rating of not less than 40000 hrs at the design
point. Pumps shall be provided with thrust bearings as required by
the system designed to prevent thrust loads from being imposed on
the drive motor bearings.
5.7.1 Safety guards shall be provided for protection of personnel from all
exposed moving and/or rotating machine elements. Each guard shall
be fabricated from 20 gauge sheet steel and designed for easy
installation and removal. Necessary supports and accessories shall
be furnished with each guard. Safety guards for horizontal shafts,
shaft couplings etc shall be an OSHA approved design.
5.7.2 Miscellaneous trim: All piping and valves required for seal or
stuffing box injection water, air vent valves, oil level indicators,
grease lubricators and other miscellaneous accessories shall be
furnished by the pump manufacturer. All wetted parts (valve, tubing
etc) shall equal or exceed the corrosion characteristics of the casing
materials.
5.8 Driver
5.8.1 Each pump shall be supplied with one electric motor each. The type
of electric motor shall be specified in the Technical data sheet
5.8.2 The rating of the pump driver shall be the larger of the following:
5.8.6 Electric motors shall be selected so that their rating will not be
exceeded by the brake horsepower of the pump over its entire
operating range.
5.8.7 Pump supplier shall complete the Motor data sheet in BHEL format
and also indicate rated current, locked rotor current and space heater
power.
5.9 Welding
5.9.5 When weld joint details are specified by the design documents, they
shall be prepared in accordance with the design documents.
5.10.1 Pump supplier shall provide a common fabricated steel base plate for
the pumps and drivers.
5.10.2 Base plate shall be sufficiently rigid to allow shipment with the
driver, mounted without the occurrence of any distortion to the base
plate.
5.10.3 Base plates shall be fabricated steel with integral drip lip or drip pan
and threaded drain connection and shall be designed to provide
common support and maintain proper alignment of the pump and the
motor.
5.11.1 Pumps shall run smooth without noise and vibration. Noise level
produced individually or collectively (pump and motor) shall not
exceed 85 dB (A) measured at a distance of 1.5 meters from the
outline of equipment source in any direction.
5.12 Marking
a. Name of supplier/manufacturer
5.12.5 Name plates shall be 1/16” to 1.8” (2 mm to 4 mm) thick. The size
of nameplates shall be a minimum of ¾” by 3 inches and include the
tag numbers above. The text shall be sized as large as possible with
size constraints.
5.13.1 The Pump supplier shall submit a list of all recommended spare
parts. The list is to be based on requirements for normal continuous
operation of the pumps and motors as specified in these
specifications.
5.13.2 The Pump supplier shall submit a recommended spare parts list with
prices for both a three (3) and a five (5) year interval. Spare parts list
shall indicate a summary of the criticality of the various parts relative
to the expected life of the part before failure based on the supplier’s
experience. Spare parts list shall contain all drawing reference
numbers, item numbers, part numbers, a/or catalog numbers
necessary to identify spare parts.
5.13.3 The pump supplier shall quote price separately for mandatory spares
list (if applicable).
17
Bharat Heavy Electricals Ltd, Piping Centre, Chennai-600017
6.1 General
6.2.4 Pump and driver with static and dynamic loads, details of fixing,
grouting and all base plate anchor bolt hole locations.
6.2.5 Cross section drawing of the pump with complete part list, materials
of construction and relevant standards for each part.
6.2.6 Pump performance curves flow rate versus head, break kilowatts,
efficiency, NPSHR from zero flow to maximum flow and torque-
speed curve.
18
Bharat Heavy Electricals Ltd, Piping Centre, Chennai-600017
8.0 EXCEPTIONS
8.3 Any exception / deviation listed and agreed by the purchaser shall become agreed
modification to the specification for that particular contract.
DOCUMENT NO:ESS-002
DOCUMENT TITLE : ENGINEERING SPECIFICATION SHEET FOR MOUDA(2 X 660 MW)
1.0 GENERAL
This Engineering Selection Sheet provides required Design and Performance Parameters for the LP
Startup Condensate Pumps for Mouda Super Critical TPP (2x660 MW) situated in Mouda Tehsil,
Nagpur district, Maharashtra state. This has to be read along with pump Technical Specification No: PC:
TSP: LPSS: CON-PUMP: 002
2.0 EQUIPMENT
2.1 The pumps covered by this specification are identified in the following table.(per boiler)
pH 6.8 – 7.2
Construction
Pump Type
Pump Model
Make
Liquid to be pumped
Specific gravity
PH
Service
Fluid Temperature, ºC
Capacity (m3/hr)
At Design Point *
Maximum Flow
Minimum Flow
At Runout Flow *
At Design Point *
Maximum Flow
Minimum Flow
At Runout Flow *
At Design Point *
Maximum Flow
Minimum Flow
At Runout Flow *
At Design Point
At Maximum Flow
Suction weld neck flange
SIZE/RATING/MATL
Discharge weld neck flange
SIZE/RATING/MATL
CONTENTS
1.0 GENERAL
2.0 SCOPE OF SUPPLY
3.0 APPLICABLE CODES & STANDARDS
4.0 DESIGN REQUIREMENTS
5.0 EQUIPMENT REQUIREMENTS
6.0 DRAWING REQUIREMENTS
7.0 PAINTING AND SHIPPING REQUIREMENTS
8.0 EXCEPTIONS
1.0 GENERAL
1.1 These specifications cover the design, engineering, performance, manufacturing and
testing requirements for complete 100% capacity, centrifugal, horizontal, double suction,
pump assemblies with electric motors for the LP start up system condensate pumps.
1.1 The following terms used herein with initial capitalization, whether singular or plural
shall have the following defined meanings:
Purchaser BHEL
1.2 The specification is intended to cover all of the work. Unless expressly excluded, any and
all equipment, labor, material and services not indicated therein but which may be
necessary to complete any part of the work in a proper, substantial and workmanlike
manner shall be furnished by the Seller without additional cost to the Purchaser. Any
intended omission or exceptions to the requirements of this Specification are included in
the “EXCEPTIONS TO THE SEPCIFICATIONS” sheet.
1.3 These specifications establish the requirements for the condensate pumps and
appurtenances, as specified therein. The requirements of these specifications are the
minimum for the equipment and are to be supplemented by the Supplier’s own
requirements.
1.4 The Supplier shall comply with all of the requirements of these specifications. Approval
of any drawings and/or test results shall in no way relieve the Supplier from these
responsibilities.
1.5 All documents, drawings and attachments shall be submitted to the Purchaser using SI-
Metric Units and the English language.
2.1 BY SUPPLIER
2.1.1 It is the intent to have the Supplier provides each pump and driver
mounted on a common base plate, designed for minimum field
installation and assembly.
3
Bharat Heavy Electricals Ltd, Piping Centre, Chennai-600017
2.1.2 Equipment tag nos. for each pump / motor – As specified in data
sheet
2.1.3 The equipment, material and services to be supplied by the Supplier
shall consist of the following:
a. The scope shall include each pump unit with all equipment, such
as motors, coupling with guard, mechanical seal, seal cooling
plan, base plate companion flanges with fasteners, anchor bolts
with fasteners and auxiliaries fully assembled and wired,
requiring only connection to BHEL piping, electrical and
control systems. Final alignment will be performed during pump
installation.
b. All equipment shop tests as specified herein.
c. Expedited schedules, drawings, procedures, pump and motor
curves, test reports and other documents and information
specified herein.
d. List of commissioning/mandatory spare parts for the pumps,
motors and accessories.
e. Insulation-if required to meet noise requirements.
f. One lot of any (unused) special tools required for installation and
maintenance, if required.
2.2 EXCLUSIONS
3.1 The publications listed below form a part of these specifications as applicable.
This publication listing is intended to identify the codes and standards applicable
to the design, fabrication and erection of the condensate pumps, but may not be
all inclusive. The seller shall comply with all applicable codes and standards,
whether or not identified in this listing. The text refers to these publications by
the basic designation only. When specific requirements are stated in these
4
Bharat Heavy Electricals Ltd, Piping Centre, Chennai-600017
specifications conflict with those required by codes and standards listed herein,
the more stringent requirement, as interpreted by the Purchaser, shall govern.
Such conflict shall be brought to the Purchaser’s attention in writing for
disposition.
3.3 Additionally, the pumps shall comply with all currently applicable statutes,
regulations and safety codes in the locality where the equipment will be installed.
3.4 The seller shall indicate the standards and codes to be used and shall list all
differences.
3.5 All drawings and data sheets shall be in Metric units / SI units. All words shall be
in the English language.
5
Bharat Heavy Electricals Ltd, Piping Centre, Chennai-600017
4.1 General
4.1.1 The condensate pumps will be used to transfer hot condensate water
from the Flash tank Drain tank (FTDT) to the main steam turbine
condenser hotwell for reuse. Operation of the pumps will be
intermittent, used during plant start up and shut down operations, and
may be used on a more continuous basis during normal plant
operations. In case of one pump failure, the other pump should have
the capability to deliver the runout flow as indicated in the datasheet.
4.1.2 Each pump shall be designed for operation using the criteria
specified in Document [Link]-002 “Engineering selection sheet for
condensate pumps”.
4.2 Materials
4.2.2 Material options with pricing may be provided by the seller, along
with an explanation of the material options advantages,
disadvantages, costs and/or other benefits.
4.3 It is the intent to have the seller provides the pumps complete with drivers, with
each pump/motor combination mounted on a common base plate, designed for
minimum field installation and assembly.
4.4 The equipment specified herein will be installed outdoors at the site located in
India. Design data for this facility is provided in Selection sheet [Link]-002
“Site location information”.
4.5.2 The pumps will be arranged in parallel and will take suction from the
bottom of the flash tank drain tank.
4.5.4 Assembly and dismantling of each pump with the drive motor shall
be possible without disturbing the grouting base plate or alignment.
[Link] The wetted parts of the pump shall be suitable for the fluid
handled by the pump (hot condensate).
4.7.1 Two (2) or more pumps will be aligned / piped in parallel and will
operate independently from each other.
4.7.2 Normal operation will utilize one (1) pump providing rated capacity
with the remaining pump on standby. In case of high level in the
FTDT the second pump will start. Control and monitoring will be
done by a remote distributed control system. (DCS)
4.7.6 The pumps shall be designed for intermittent duty and shall be
designed to accommodate the quantity of starts & stops as
recommended by the ANSI / NEMA MG-1.
4.8.2 At the best efficiency flow condition, the impeller design shall not
exceed the specific speed limitation given by ANSI/HI. The
manufacturer shall indicate the specific speed of his design at the
best efficiency point and the specific speed limitation as imposed by
ANSI/HI.
4.8.3 Pump vibration shall not exceed the acceptable limits for centrifugal
pumps given by ANSI/HI at all discharge rates from minimum flow
to pump maximum flow (run out). The maximum net positive
suction head required by the pump shall be at least 1.0 meter less
than the NPSH available at the design point.
4.8.4 The pumps shall operate without vapor binding or cavitations at all
operating conditions.
4.8.6 The pumps shall be capable of starting with discharge valve fully
open and closed condition.
4.8.8 Assembly and dismantling of each pump with drive motor shall be
possible without disturbing the grouting base plate or alignment.
4.9.3 The characteristic curves shall indicate pump performance from zero
capacity to the pump run out capacity during single pump operation
and during two pump parallel operation while switching operation
from one pump to the other.
4.9.4 Speed torque and motor performance curves shall also be submitted.
4.10 Testing
4.10.1 The seller shall perform a shop hydrostatic test and non cavitating
performance test. These tests shall be in accordance with the Test
Code of the Hydraulic Institute Standards.
4.10.4 The hydro test pressure on the casing shall be 1.5 times maximum
discharge head or twice the differential head, whichever is higher.
Maximum discharge head is defined as the sum of the shutoff head
and the maximum suction head. The duration of the test shall be
minimum thirty (30) minutes.
10
Bharat Heavy Electricals Ltd, Piping Centre, Chennai-600017
4.10.5 In the event of leakage, the procedure for repairs shall be subject to
review by the Purchaser. After the repair, the pump(s) shall be
successfully hydrostatically re-tested at 1.5 times (minimum) the
shut off discharge pressure.
4.10.7 If the shop performance tests indicate the tested pump fails to meet
the guarantees stated herein, the other pump shall be shop tested in
accordance with the stated requirements specified herein.
4.10.8 Any pump not meeting the guarantees shall receive all adjustments,
repairs, additions, or replacements as required at the seller’s expense
for it to meet the guarantees.
4.10.10 Certified test reports containing all test data, pump performance
curves and head capacity curves shall be submitted by the pump
supplier to BHEL.
4.10.11 After the pumps/drivers have been installed at the site, they shall be
subjected to testing. If the site performance is found not to meet the
requirements regarding vibration and noise as specified the
equipment shall be rectified or replaced by the vendor at no extra
cost to the purchaser.
4.11 Guarantees
5.1.3 Permanently installed lifting eyes or lugs shall be provided for each
pump and motor assembly to facilitate installation and maintenance.
5.2 Shaft
5.2.1 The pump shaft shall be sized to transmit the power requirements of
the pump during all modes of operation without distortion or
excessive vibration.
5.2.2 The shaft shall be ground and polished over its entire length and
shall be adequately sized to withstand all stresses from rotor weight,
hydraulic loads, vibration and torques coming in during operation.
12
Bharat Heavy Electricals Ltd, Piping Centre, Chennai-600017
5.2.3 Each shaft shall be designed so that no critical speed will occur
within a 25 percent margin of the operating speed of the pump. It is
preferred that the first critical speed of the pump shall occur above
the pump operating speed.
5.3.1 The coupling for connecting the pump to the drive motor shall be of
sufficient length to permit installation of the mechanical seal without
disturbing the driver.
5.3.2 The coupling shall be easily removed for equipment inspection or
maintenance.
5.3.3 Screwed, shrink, or press fits on the shafts are not acceptable
coupling attachment configurations.
5.3.4 The shaft coupling shall be sized to transmit the maximum brake
horsepower requirements of the driven equipment with a service
factor of not less than 2.
5.3.5 Shaft couplings shall be used between all drives and driven
equipment. Couplings shall be attached to driver and driven shafts
by keys. Couplings shall be of the non lubricated, all metal (stainless
steel) flexible disk type. Couplings for motors with ratings less than
250 hp shall have elastomeric elements.
5.4.2 Access shall be provided for dismantling the drive shaft coupling and
for maintenance and inspection of the pump seal. The coupling
guard shall be the removable type.
5.4.5 Renewable type fine finished shaft sleeves shall be provided at the
stuffing boxes/mechanical seals. Length of the shaft sleeves must
extend beyond the outer faces of gland packing of the seal and plates
so as to distinguish between the leakage between shaft and shaft
sleeve and that past the seals/gland.
5.4.6 Shaft sleeves shall be fastened to the shaft to prevent any leakage or
loosening. Shaft and shaft sleeve assembly should ensure concentric
rotation.
5.5 Casing
5.5.1 The pump casing, including suction connection shall be rated for the
design conditions of the pumping system. Suction and discharge
connections shall be raised faced flanged (ANSI Class 150). The
casing shall be drilled and tapped for venting and draining and
pressure connections with threaded plugs provided. Flange drilling
shall comply with the provisions of ANSI B16.5.
5.5.2 The Pump supplier shall supply one companion suction flange and
one companion discharge flange for each pump. Flanges shall be
ASME Class 150, raised face, weld neck type.
5.5.4 The pumps shall be provided with replaceable front and back wear
rings for casings. Rings utilizing threads are unacceptable.
14
Bharat Heavy Electricals Ltd, Piping Centre, Chennai-600017
5.5.6 The corrosion allowance for all pump pressure parts shall be a
minimum of 3 mm.
5.6 Bearings
5.6.1 Pump bearings shall be of the anti-friction type with regreasable type
bearing lubrication. Anti-friction bearings shall be designed for
AFBMA L-10 life rating of not less than 40000 hrs at the design
point. Pumps shall be provided with thrust bearings as required by
the system designed to prevent thrust loads from being imposed on
the drive motor bearings.
5.7.1 Safety guards shall be provided for protection of personnel from all
exposed moving and/or rotating machine elements. Each guard shall
be fabricated from 20 gauge sheet steel and designed for easy
installation and removal. Necessary supports and accessories shall
be furnished with each guard. Safety guards for horizontal shafts,
shaft couplings etc shall be an OSHA approved design.
5.7.2 Miscellaneous trim: All piping and valves required for seal or
stuffing box injection water, air vent valves, oil level indicators,
grease lubricators and other miscellaneous accessories shall be
furnished by the pump manufacturer. All wetted parts (valve, tubing
etc) shall equal or exceed the corrosion characteristics of the casing
materials.
5.8 Driver
5.8.1 Each pump shall be supplied with one electric motor each. The type
of electric motor shall be specified in the Technical data sheet
5.8.2 The rating of the pump driver shall be the larger of the following:
5.8.6 Electric motors shall be selected so that their rating will not be
exceeded by the brake horsepower of the pump over its entire
operating range.
5.8.7 Pump supplier shall complete the Motor data sheet in BHEL format
and also indicate rated current, locked rotor current and space heater
power.
5.9 Welding
5.9.5 When weld joint details are specified by the design documents, they
shall be prepared in accordance with the design documents.
5.10.1 Pump supplier shall provide a common fabricated steel base plate for
the pumps and drivers. Base plates shall be designed to adequately
support the equipment under all conditions and reaction forces.
5.10.2 Base plate shall be sufficiently rigid to allow shipment with the
driver, mounted without the occurrence of any distortion to the base
plate.
5.10.3 Base plates shall be fabricated steel with integral drip lip or drip pan
and threaded drain connection and shall be designed to provide
common support and maintain proper alignment of the pump and the
motor.
5.11 Impellers
5.11.1 The impeller shall be firmly keyed and secured to the shaft in proper
axial position. It shall be cast in one piece, accurately machined,
finished all over and the water passages finished to the proper
contour. The impellers shall be dynamically balanced, either
separately or as part of the shaft assembly.
5.11.2 Impeller shall be closed, semi-closed or open type and designed in
conformance with detailed analysis of the condensate being pumped.
5.11.3 The impeller shall be secured to the shaft, and shall be retained
against circumferential movement by keying, pining, or lock rings.
5.13.1 Pumps shall run smooth without noise and vibration. Noise level
produced individually or collectively (pump and motor) shall not
exceed 85 dB (A) measured at a distance of 1.5 meters from the
outline of equipment source in any direction.
5.14 Marking
a. Name of supplier/manufacturer
18
Bharat Heavy Electricals Ltd, Piping Centre, Chennai-600017
5.14.5 Name plates shall be 1/16” to 1.8” (2 mm to 4 mm) thick. The size
of nameplates shall be a minimum of ¾” by 3 inches and include the
tag numbers above. The text shall be sized as large as possible with
size constraints.
5.15.1 The Pump supplier shall submit a list of all recommended spare
parts. The list is to be based on requirements for normal continuous
operation of the pumps and motors as specified in these
specifications.
5.15.2 The Pump supplier shall submit a recommended spare parts list with
prices for both a three (3) and a five (5) year interval. Spare parts list
shall indicate a summary of the criticality of the various parts relative
to the expected life of the part before failure based on the supplier’s
experience. Spare parts list shall contain all drawing reference
numbers, item numbers, part numbers, a / or catalog numbers
necessary to identify spare parts.
19
Bharat Heavy Electricals Ltd, Piping Centre, Chennai-600017
5.15.3 The pump supplier shall quote price separately for mandatory spares
list (if applicable).
6.1 General
6.2.4 Pump and driver with static and dynamic loads, details of fixing,
grouting and all base plate anchor bolt hole locations.
6.2.5 Cross section drawing of the pump with complete part list, materials
of construction and relevant standards for each part.
20
Bharat Heavy Electricals Ltd, Piping Centre, Chennai-600017
6.2.6 Pump performance curves flow rate versus head, break kilowatts,
efficiency, NPSHR from zero flow to maximum flow and torque-
speed curve.
8.0 EXCEPTIONS
8.3 Any exception / deviation listed and agreed by the purchaser shall become agreed
modification to the specification for that particular contract.
Bharat Heavy Electricals Limited
Piping Centre Chennai-17
ENGINEERING DEPARTMENT
09
08
07
06
05
04
03
ENGINEERING DEPARTMENT
1.0 SCOPE
1.1 This standards specifies the requirement of HT & LT MOTORS for use in
Utility/Captive Power Plants.
3.0 TYPE
ENGINEERING DEPARTMENT
6.1 Supply change over conditions : Motor shall be designed to withstand the
Voltage and torque stresses corresponding
to 150% of the rated voltage, during
change over of buses.
ENGINEERING DEPARTMENT
Starting current of DC motors shall be limited to 200% of the rated current with
starting resistors.
Locked rotor with 2.5 seconds more 5 seconds more Ten (10) percent
stand time at than the starting than the starting more than the
highest permissible time time starting time.
voltage
Note: Where above requirements are not met, speed switches shall be mounted
on motor shaft, with prior consent of purchaser.
11 CONTROL
ENGINEERING DEPARTMENT
ENGINEERING DEPARTMENT
16 CONSTRUCTIONAL FEATURES
DC Motors
(b) Insulation for HT motors : Non hygroscopic, preferably epoxy
impregnated type. Class – F.
ENGINEERING DEPARTMENT
18 BEARINGS
18.3 Forced oil lubrication oil pumps : Two (2) numbers, each rated for100%
requirement. In case of failure of the forced
lubricated system, ring oil system shall
provide sufficient lubrication for coasting
down of motor along with driven
equipments.
18.5 Bearing sump accessories : Drain plug, Filling hole and oil level
indicator.
Bharat Heavy Electricals Limited
Piping Centre Chennai-17
ENGINEERING DEPARTMENT
18.7 Instrumentation (for HT motors) : Dial type thermometer with adjustable alarm
Contact & Resistance Temperature
Detectors. (RTD) for each bearing.
19.1 Air to air heat exchangers : For motors rated above 1000 KW, dial type
02 thermo meter with adjustable alarm
contacts shall be provided to measure
primary air inlet and outlet temperature.
19.2 Air to water heat exchanger : Cooler tubes of stainless steel 304 or
70/30 brass.
: Flow switch to be provided.
: Water leakage detector to be provided.
: Pipe flange connections, drain cock, air
release plug etc. shall be external to motor.
19.3 Hydraulic Pressure withstand : 1.5 times the maximum working pressure or
3.5 bar (g) whichever is higher.
ENGINEERING DEPARTMENT
ENGINEERING DEPARTMENT
XLPE insulated
XLPE insulated
ENGINEERING DEPARTMENT
24.0 PAINT & FINISH : Minimum one coat of primer and two coats
of finished enamel paint. Paint shade – 692
for indoors. 631 for outdoors.
02 * Details will be confirmed to successful
bidder
26.1 All materials, components and equipments covered under this specification shall
be procured. manufactured, erected, commissioned and tested as per a
comprehensive quality assurance program to be approved by the owner. A
complete quality plan shall be furnished for the motor rated above 50 KW. All
welding and brazing operation shall be carried out as per approved welding and
brazing procedure and by qualified welder/brazers.
26.2 The bidder shall also furnish copies of the reference documents/plant
standards/acceptance norms/ test and inspection procedure etc. for Owner’s
review/approval. In these approved quality plans, Owner shall identify customer
hold points(CHP), which shall be carried out in the presence of the Owner’s
representative and beyond which work shall not proceed with out the consent of
Owner’s representative in writing.
26.3 Owner reserves the right to witness any of the tests and verify the documents of
the contractor and his sub contractor. No materials/equipments shall be dispatched
from the manufacturer’s works before the same is duly cleared for dispatch by the
Owner.
26.4 All the sub vendors proposed by the Contractor for procurement of major bought
out items including raw materials, semi- finished components shall be subject to
Owner’s approval.
26.5 The Contractor shall carry out an inspection and testing program during
manufacture in his works, and that of his sub- contractor’s to ensure the
mechanical accuracy of components, compliance with drawings, conformance to
functional and performance requirements, identity and acceptability of all
materials,parts and equipments. He shall carry out all tests/ inspection required to
Bharat Heavy Electricals Limited
Piping Centre Chennai-17
ENGINEERING DEPARTMENT
26.6 Quality audit/ surveillance/ approval of the results of the test and inspection will
not, however, exclude the right of the Owner to reject the equipment if it does not
comply with the specification when erected or does not give complete satisfaction
in service and the above shall in no way limit the liabilities, and responsibilities of
the contractor in ensuring complete conformance of the materials / equipments
supplied to relevant specification, standard, data sheets, drawing etc.
26.7 Indicating tests/checks to be carried out for the motors rated above 50 KW during
manufacturing are to be listed by manufacturer.
27.0 TESTS
(a) All motors shall be subjected to routine tests. All LT motors shall be of type
tested quality. For each type and rating of HT motor, type tests, shall be
carried out.
(b) The tests shall be carried out as per applicable standards including all
special tests. The list of routine tests and type tests are given below:
(c) Insulation resistance test for winding, space heater and RTD
ENGINEERING DEPARTMENT
(e) High voltage test on windings, space heater and RTD followed by insulation
resistance test.
(g) Locked rotor test (For all the ratings of motors as per IS 4029)
(k) Degree of protection test for IP 54 & IP 55 enclosure (It shall not be
possible to insert a feeler gauge of 0.1 mm thick in the enclosure or flange
faces)
(n) Polarization index measurement (The PI value with 2.5 KV shall be not less
than 2.0)
(d) Full load test to determine efficiency, power factor and slip. 02
ENGINEERING DEPARTMENT
(g) Degree of protection test for the enclosure followed by IR, HV and no load
run test.
(h) Fault level withstand test for terminal box. (For breaker controlled motors
only).
(j) No load saturation and loss curves (up to approximately 115% of rated
voltage)
(k) Surge withstand test for main insulation on a sample coil after placing it in
stator
Core with at least five impulses on 1.2/50 micro sec. Wave at test voltages
indicated in Annexure – A
(l) Surge withstand test for inter turn insulation on each type of motor coil
with at least five impulses of 0.3/3 micro sec. At test voltages indicated in
Annexure–A This test shall be followed by one minute power frequency
high voltage test on turn to turn insulation after cutting the coil and
bringing out turns suitably. The test voltage shall be mutually agreed upon.
27.4 When tests to determine the break away starting current of cage induction motors
are taken at reduced voltage, due allowance shall be made for the effect of
saturation and the estimated value of break away starting current at rated voltage
shall be given on all test certificates.
Bharat Heavy Electricals Limited
Piping Centre Chennai-17
ENGINEERING DEPARTMENT
27.5 DC motors shall be subjected to all routine and type tests as per IS :4722. In
addition following tests shall be carried out.
(a) Noise level measurement as type test.
Commissioning checks should be carried out as per IS: 900 and other relevant
standards.
ENGINEERING DEPARTMENT
ANNEXURE - A
-
3.0 Fault Level 40 kA rms for 1 40 kA rms for 1 45 kA rms for 1
02
sec sec sec
4.0 Minimum starting 75% (for more 85% (for up to 80% (for more
voltage available than 4000 KW) 1000 KW) 80% than 110 KW)
80% (> 1500 (> 1000 KW & up 85% (for up to 190 V
KW & up to to 1500 KW 90% 110 KW)
4000 KW) (for coal mill
motor of < 1000
KW)
ENGINEERING DEPARTMENT
a) Fault withstand level 750 MVA 150/250 MVA 31 MVA (for >
for 0.12 sec. 125 KW)
b) Clearance between 130 mm 70/110 mm* 12.5 mm 02 10mm
bare live parts.
c) Clearance between 120 mm 60/100 mm* 12.5 mm 02
10 mm
bare live parts & earth
Bharat Heavy Electricals Limited
Piping Centre Chennai-17
ENGINEERING DEPARTMENT
ANNEXURE – B
Bidder’s name :
1 GENERAL
(i) Manufacturer
ENGINEERING DEPARTMENT
a) 100% voltage
b) 85% voltage
(xv) Torques at
a) Starting (Kg-metre)
b) Pull up (Kg-metre)
ENGINEERING DEPARTMENT
a) Stator leads
b) Space heater
c) Temperature detector
a) Number
b) Location
a) Driving end
(xxiii) Weight of
ENGINEERING DEPARTMENT
ANNEXURE – C
Bidder’s name :
1 GENERAL
(i) Manufacturer
ENGINEERING DEPARTMENT
(xi) Current at
b) Rated load
c) Commutator material
b) Make
a) Number
b) Location
ANNEXURE-B
MANDATORY SPARES
DESCRIPTION QTY