0% found this document useful (0 votes)
92 views1 page

NTPC 02

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
92 views1 page

NTPC 02

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Authorized Exclusive Dealer

AIRCONDITIONING SYSTEMS R S COOLING APPLIANCES

RSCA/NTPC-COS-/0032/2023-24
Date: 23/March/2025

To,
The AGM (EED)
NTPC Bongaigaon Thermal Power Project
Salakati (P), Kokrajhar-783369
BTAD (Assam)

Sub: - Time Extension for period of Six (6) Months.

Name of Work: DESIGN, SUPPLY, ERECTION, TESTING, COMMISSIONING AND AMC OF


PACKAGE AC SYSTEM FOR AUDITORIUM BUILDING OF NTPC BONGAIGAON
TOWNSHIP

Purchase Order No.: 5500041215-035-1041 Date: 31.08.2022

Dear Sir
This is for your information that our duct fabrication work and placing of the Package
machine at the plant room were complete, but unable to complete the erection of the
balance ducting works as per the design approved due to the false ceiling and front is not
clear from Civil till today.

On my last visit at site it’s was assured by the civil that they will able to clear the “False
ceiling” by 25th Feb 2025 This Contract was awarded on 31st Aug-2022 for period of
6months, however due to non-ability of front from civil, our contract has been delayed for
more than 2years, due to this we had incurred huge loss, since the materials rates &
labour charges had increases in this 30months.

We also like to inform you that due to delay of this project, we had also notice many thief
in this building, in such situation ,we are not in the position to do the “Cooper Pipe line”
works because we fear that cooper might get stolen during commission stage, Sine we are
incurring huge loss due to delay in a contract, so we are not in the position to bare the
financial loss for thief of copper & others costly items, hence we request you to arrange
proper security in form of guards or Lockable door to move inside the area.

As per previous E.O.T site has to handed over as on 31. March.2025, but in such scenario,
I’m not sure that we will be able to complete the works before six months from today.

Therefore, we request you to kindly make the extension for the period of another six
Months without “L.D” as because front is not clear by civil.

Thanking you,
For, R.S.Cooling Appliances

Sanjay Kumar Basu


+919864044329.

Guwahati Office: Agartala Office: Kolkata Office:


1st Floor, H/no: -6, B.P. Road, Suhagpur. 20 T.G. Road, Ramnagar, No.6, Lodh Bhawan B-22 Rajdanga, Nabapally Kasba Haltu
Rehabari, Guwahati- 781008 Near 1st Crossing, Agartala – 799001, Tripura (W) Kolkata-700 107, West-Bengal
Ph- 0361-2735-575, +91 9435833617 Tel.: (381-2330310) 9706002355 Ph. 033-4803-4484, 9147102141
E-mail: [email protected] Mob.: 94851 61347, 98640 44329 +91 9864044329, 9706002355
E-mail: [email protected] E-mail: [email protected]
Showroom: Near Ulubari flyover, G.S. Road
Ulubari, Guwahati-781007
Tel.: 0361-2635377, 98640 44329,97060 02355
E-mail: [email protected]

You might also like