Our Ref : EW/ Q/ R001/ 0501/ 23
Date : 05/01/2023
M/s : Owner
31, Jalan Anjung 8/2,
Horizon Hills, 79100 Nusanjaya, Johor
Tel : Fax :
Attn : H/P : +65 8288 6403
RE : PROPOSED QUOTATION FOR RENOVATION WORK
Thank you for your enquiry on the above mentionel and we are pleased to append herewith our quotation for your kind
consideration and approval :-
Rate Amount
Item Description Quantity
(RM) (RM)
A) Protection, Dismantle & Clearing
1 Labour charges for dismantle & clear existing :-
Ground Floor
1.01 W3660mm X H 2440mm sliding door 1 no 200.00
1.02 W2135mm X H 2440mm sliding door 1 no 150.00
1.03 W2025mm X H 2440mm sliding door 1 no 150.00
1.04 W3000mm X H 3660mm brick's wall ( existing Powder Room ) 1 no 200.00
1.05 W3000mm X H 3660mm brick's wall ( existing Entrance ) 1 no 200.00
1.06 W1350mm X H 3660mm brick's wall ( existing Entrance ) 1 no 100.00
1.07 W1500mm X H 3660mm brick's wall ( existing Powder Room ) 1 no 100.00
1.08 W2250mm X H 3660mm brick's wall ( existing Maid Room ) 1 no 150.00
1.09 single flush door & door frame 3 nos 100.00
1.10 Main Entrance door & door frame ( keep well to reinstall ) 1 no 150.00
1.11 Overall floor & wall tile's at existing Powder Room. 250 sft 5.00 1,250.00
Option A - Toilet change tile's due to can't found existing tile's.
1.12 Overall floor & wall tile's at existing Toilet. 240 sft 5.00 1,200.00
First Floor
1.13 W3660mm X H 2440mm sliding door 1 no 200.00
1.14 W1220mm X H 1830mm casement window 1 no 100.00
1.15 W1220mm X H 3050mm brick's wall 1 no 100.00
Option B - existing r.c. roof at Master Bedroom 54 sft 10.00 540.00
2 Labour charges for clear grass, dig ground, clear mud & supply with compact
well crusher run to received new floor slab. 780 sft 20.00 15,600.00
3 Labour charges for open new door hole to received new door at existing toilet. L/sum 300.00
Protection
4 To supply & install of 3mm thick plywood on existing Car Porch. L/sum 500.00
5 To supply & install of card board on overall Ground Floor, Staircase, Walkway
to existing Master Bedroom, & Master Bedroom. L/sum 1,200.00
B) Wet Work
* Labour charges for install tile's include material supply.
Option 1 - Local Worker Installer
Option 2 - Foreign Worker Installer ( Indonesian or Vietnamese )
Option A - Toilet change tile's due to can't found existing tile's. 18,000.00
To supply 300mm X 300mm homogeneous floor tile's.
To supply 300mm X 600mm ceramic wall tile's.
Ground Floor - Overall
1 To made good overall wall after dismantle w/ plaster & skim coated finish. L/sum 1,200.00
2 To made good overall floor after dismantle w/ cement render to received new
finishing. L/sum 1,500.00
* Floor made good finishing to decide by owner for costing.
3 To made good overall plumbing at existing Powder room. L/sum 300.00
Option A - Toilet change tile's due to can't found existing tile's.
4 To made good overall plumbing at existing Toilet. L/sum 600.00
Our Ref : EW/ Q/ R001/ 0501/ 23
Date : 05/01/2023
Rate Amount
Item Description Quantity
(RM) (RM)
B) Wet Work
Ground Floor - Side Yard & Car Porch corner area
5 To cast r.c. floor slab for received new cement render. 780 sft 30.00 23,400.00
6 To render cement mix sand on new r.c. floor slab to received new finishing. 780 sft 42.00 31,120.00
7 To supply 300mm X 600mm homogeneous floor tile's.
7.01 floor tile's 780 sft 20.00 15,600.00
7.01 Skirting 195 fr 4.00 780.00
8 Labour charges for install floor tile's & skirting include material supply.
Option 1 - Local Worker Installer
8.01 floor tile's 780 sft 20.00 15,600.00
8.01 Skirting 195 sft 5.00 975.00
Option 2 - Foreign Worker Installer ( Indonesian or Vietnamese )
8.01 floor tile's 780 sft 5.00 3,900.00
8.01 Skirting 195 sft 4.00 780.00
Ground Floor - New Entrace
9 To fabricate new brick's wall w/ plaster both side & skim coated finish c/w
lintol for new window & door. 183 sft 15.00 2,745.00
10 To install existing Main Entrance door & door frame. L/sum 200.00
11 To render cement mix sand on new r.c. floor slab to received new finishing. L/sum 500.00
12 To supply 600mm X 600mm homogeneous floor tile's.
12.01 floor tile's 49 sft 5.00 245.00
12.01 Skirting 16 sft 4.00 64.00
13 Labour charges for install floor tile's & skirting include material supply.
Option 1 - Local Worker Installer
13.01 floor tile's L/sum 500.00
13.02 Skirting L/sum 100.00
Option 2 - Foreign Worker Installer ( Indonesian or Vietnamese )
13.01 floor tile's L/sum 350.00
13.02 Skirting L/sum 80.00
Ground Floor - Existing Powder Room
14 To supply & apply skim coated on existing wall after dismantle wall tile's 175 sft 6.50 1,137.50
15 To render cement mix sand on new r.c. floor slab to received new finishing. L/sum 500.00
16 To supply 600mm X 600mm homogeneous floor tile's.
16.01 floor tile's 52 sft 5.00 260.00
16.01 Skirting 18 sft 4.00 72.00
17 Labour charges for install floor tile's & skirting include material supply.
Option 1 - Local Worker Installer
17.01 floor tile's L/sum 600.00
17.01 Skirting L/sum 150.00
Option 2 - Foreign Worker Installer ( Indonesian or Vietnamese )
17.01 floor tile's L/sum 450.00
17.01 Skirting L/sum 100.00
Ground Floor - Existing Toilet
18 To fabricate new brick's wall w/ plaster both side & skim coated finish to
sealed existing door hole. L/sum 500.00
20 To supply 300mm X 600mm ceramic wall tile's. 21 sft 5.00 105.00
21 Labour charges for install wall tile's include material supply.
Option 1 - Local Worker Installer L/sum 300.00
Option 2 - Foreign Worker Installer ( Indonesian or Vietnamese ) L/sum 250.00
Option A - Toilet change tile's due to can't found existing tile's.
20 To supply 300mm X 300mm homogeneous floor tile's. 26 sft 5.00 130.00
21 To supply 300mm X 600mm ceramic wall tile's. 208 sft 5.00 1,040.00
Our Ref : EW/ Q/ R001/ 0501/ 23
Date : 05/01/2023
Rate Amount
Item Description Quantity
(RM) (RM)
B) Wet Work
Ground Floor - Existing Toilet
22 Labour charges for install wall tile's include material supply.
Option 1 - Local Worker Installer
22.01 floor tile's 26 sft 8.00 208.00
22.01 wall tile's 208 sft 25.00 5,200.00
Option 2 - Foreign Worker Installer ( Indonesian or Vietnamese )
22.01 floor tile's 26 sft 5.00 130.00
22.01 wall tile's 208 sft 15.00 3,120.00
First Floor - Master Bedroom
23 To cast r.c. beam for new brick's wall. 10 sft 15.00 150.00
24 To fabricate new brick's wall w/ plaster both side & skim coated finish.
sealed existing door hole. 285 sft 15.00 4,275.00
Option B - existing r.c. roof at Master Bedroom
25 To cast r.c. roof at Master Bedroom. 132 sft 40.00 5,280.00
C) M & E ( Rate Only )
1 To supply & install of :-
1.01 lighting point c/w cable & switch. 120.00
1.02 13A socket point c/w cable & socket. 155.00
1.03 wall light/fan/exaust fan point c/w cable & switch/socket. 200.00
1.04 20A socket/air cond/heater point c/w cable & switch/socket. 300.00
1.05 telefon point c/w cable & port. 200.00
1.06 Cat 5e network point c/w cable & port. 250.00
1.07 Cat 6 network point c/w cable & port. 350.00
1.08 fibre optic cable only. 550.00
D) Plaster Ceiling
1 To supply & install of :-
1.01 flat board 1 sft 3.80
1.02 L box ( drop & curtain pelmet ) 1 fr 12.50
1.03 lighting pelmet 1 fr 16.50
1.04 access/main hole 1 no 100.00
E) Door & Window
1 To supply & install of white powder coated aluminium frame w/ 5mm thick 15,000.00
glasses :-
Ground Floor - New Entrace
1.01 L-shape 600mm + 600mm X H1950mm casement w/ fixed panel window 1 no 900.00 900.00
First Floor - Master Bedroom
1.02 L-shape 600mm + 1800mm X H1950mm casement w/ fixed panel
window 1 no 1,820.00 1,820.00
F) Painting Work
1 To supply & apply of wall sealer on new wall.
2 To supply & apply of emulsion paint on new wall as base & ceiling as finishing.
3 To supply & apply of vinyl paint on overall internal wall as finishing. 28,000.00
4 To supply & apply of weather proof paint on overall external wall as finishing.
Notice :-
*Item not in list will consider as V.O.
*Material supply in our rate only.
Total Amoun w/ Option 1 : 212,864.30
Deposit :
Nett Total :
Our Ref : EW/ Q/ R001/ 0501/ 23
Date : 05/01/2023
We hope the above quotation will meet with your requirements and looking forward to your early confirmation by signing
below and return duplicate copy your company acceptance.
Mode of Payment : 30% deposit upon confirmation.
: 30% claim on work in progress.
: 40% claim upon completion of installation.
EASTERN WORLD ( M ) SDN. BHD. I / We representative for the company hereby
acknowledge and agree to the above
Rex
Rex ( Designer ) Signature & Company Stamp