VRF System Installtion Basic

The document outlines the basic installation process for a VRF (Variable Refrigerant Flow) system, detailing steps such as load calculation, model selection, and the installation of indoor and outdoor units. It emphasizes the importance of proper materials, electrical wiring, and insulation, as well as specific guidelines for refrigerant piping and drainage. Additionally, it includes safety measures and installation standards to ensure effective and efficient operation of the VRF system.

Uploaded by

John NDULA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
312 views23 pages

VRF System Installtion Basic

The document outlines the basic installation process for a VRF (Variable Refrigerant Flow) system, detailing steps such as load calculation, model selection, and the installation of indoor and outdoor units. It emphasizes the importance of proper materials, electrical wiring, and insulation, as well as specific guidelines for refrigerant piping and drainage. Additionally, it includes safety measures and installation standards to ensure effective and efficient operation of the VRF system.

Uploaded by

John NDULA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

VRF system Installation Basic

Strat up
Vacuuming
Sleeve work
Power cable Address setting
Air duct Install IDU
Sleeve Control work
work
Sealing test Hanger
Outdoor unit foundation
Drain water Charging
Refrigerant piping refrigerant
work Tray work leak test
Electrical
wiring Leakage test
FixPiping
piping on
work wall Communication wire
Anchor work
VRF system Standard installation Circuit breaker
(Fix vertical piping) Sealing/Vacuum
LGMV
installation basic work Piping work /Refrigerant chargingCopper pipeStart up
Duct process
Drain Find installation
work (Fix horizontal piping) Electrical
location power
Load Tray work
calculation Refrigerant calculation
Model selection Insulation material Install ODU
ODU foundation Auto addressing
Piping design
Electrical wiring Outdoor unit
Piping cover foundation

Drain pipe Drain work Installation


information
Refrigerant tray
Final report
VRF system installation process

Drawing Design Preparing Installation 선 배관 공사 Work


Installation Indoor Unit Installation
• Load calculation • Copper pipe material • Refrigerant piping work • IDU Location / Space
• Model selection • Drain pipe material • Drain piping work • Hole for service
• Piping design • Insulation material • Electrical work • Control device
• Drainage pipe • Communication wire spec. • Communication & Control
• Air duct • Power cable spec. work
• IDU/ODU Installation • Duct work
• Circuit Breaker & Device
location & SVC • Pipes Cover, Tray installation
• Pipe Sleeve
• Electricity
• Control System

Outdoor Unit Installation Start up Completion


• Start up process & Preparation • Real Name stickers
• ODU foundation of
concrete /H-beam • Electrical power • Refrigerant pipe lines
• Fix ODU information
• IDU/ODU Address setting
• Refrigerant Tray • Final Report
• Leakage Test • Start up (Operate with LGMV)
• Vacuuming
• ODU Space Drainage
• Refrigerant calculation
to add
• Charging Refrigerant

VRF System Installation Basic Copyright 2015@LG Electronics / AE Company All Rights Reserved
1. Outdoor unit foundation

Use anti-vibration materials(cushion pad) fully to prevent transferred noise and vibration

(C)

(B)

A) Concrete support
(A)
B) H-beam support
C) Put cushion pad between the outdoor unit support
and ground support for the vibration protection in wide area.
D) The corner part must be fixed firmly. Other support for the installation
may be bent. Use M10 anchor bolt.

VRF System Installation Basic Copyright 2015@LG Electronics / AE Company All Rights Reserved
1. Tray work

Less than 3 outdoor units Multiple outdoor units

At least 50mm

Power cable
Refrigerant
pipe

Communication line

Power Communi- Refrigerant pipe


cable cation cable

At least 200mm

20-50mm

20-50mm

※ Cautions
A) Power section and communication section shall be installed with vertical or horizontal interval inside tray.
B) Pipe cover and tray shall be installed at height of min. 200 mm above the floor.
C) Pipe cover shall be of structure of opening/closing, and look tidy.
D) Pipe cover and tray materials shall be those free from corrosion.
E) Pipe cover and tray materials shall be those free from corrosion.

VRF System Installation Basic Copyright 2015@LG Electronics / AE Company All Rights Reserved
Case study

1 2 3

4 5

VRF System Installation Basic Copyright 2015@LG Electronics / AE Company All Rights Reserved
2. Anchor work

Criteria Image Explanation Anchor Insert nut

Set anchor
Vibration load (dynamic load) occurs at the
indoor unit instead of the fixed load.
Indoor Therefore, the set anchor needs to be
unit installed, to enhance stability.
M10 (3/8”)

Supporting refrigerant pipes Within 1.5m

As only internal load exists in the 1.5m


Set anchor Wedge anchor Strong anchor PVC insert

Refrigerant refrigerant pipe fixing part, the set


piping anchor, PVC insert nut, wedge anchor,
and strong anchor need to be installed.

M10 (3/8”) M10 (3/8”) M10 (3/8”) M10 (3/8”)

Supporting drain pipes Within 1.0m ~ 1.2m


1.2m
As only internal load exists in the drain
fixing part, the set anchor, PVC insert nut,
Drain wedge anchor, and strong anchor need to
be installed.

M10 (3/8”) M10 (3/8”) M10 (3/8”) M10 (3/8”)

VRF System Installation Basic Copyright 2015@LG Electronics / AE Company All Rights Reserved
2. Refrigerant pipe and insulation material

Copper pipes Insulation material

Phosphorus deoxidized copper pipe EPDM(Ethylene Propylene Dianne Monomer)


(Cu : 99.9%, P : 0.015~0.04) NBR(Acrylonitrile Butadiene Rubber )

Pipe Cooling area Non-cooling area


Diameter Tolerance Type Normal Specific Normal
Soft Hard Specific
(mm) area area area
6.35
Over 9 t Over 9 t Over 9 t Over 9 t
Liquid 9.52
line
Over 12.7 Over 13 t Over 13 t Over 13 t Over 13 t

9.52
12.5
15.88
Over 13 t
19.05 19 t Over 19 t
22.22
Gas
Don't use 25.4 Over 25 t
line
soft pipes. 28.58
31.75
34.9 Over 19 t
Over 25 t Over 25 t
38.1
44.45

VRF System Installation Basic Copyright 2015@LG Electronics / AE Company All Rights Reserved
2. Refrigerant pipe and Y branch work

Distribute pipe supporting (mm)


300mm

300 300 (A)


(B) (C)
Between elbow
and elbow

More than More than More than


500mm 500mm 500mm
300
More than
500mm
300mm 300mm

Horizontal installation Vertical installation


Position seen from B
Horizontal plane

Do not trap

A. The outdoor unit side Vertically Vertically


B. The branch tube or indoor unit side downward upward

VRF System Installation Basic Copyright 2015@LG Electronics / AE Company All Rights Reserved
Case study

1 2 3

20mm 40mm

4 5

45◦
90◦

VRF System Installation Basic Copyright 2015@LG Electronics / AE Company All Rights Reserved
2. Refrigerant pipe work

▶ Cautions for copper pipe welding


Flow nitrogen (about 0.02MPa, 0.2kg/㎠) into the pipe during welding, so that the welding part is
not oxidized.
Pressure
controller
(A) Welding part Copper pipe
1/4 (B)
Nitrogen

High pressure
Taping hose
Nitrogen

Correct method Incorrect method


◆ Standard nitrogen use method ◆ Passing through nitrogen during welding only

Welding without using a gauge (oxygen


Welding using a gauge (remove oxygen inside is not removed due to instant flow)
Welding Welding
the pipe with minute flow) (Tar is created due to nitrogen locking
part
(No tar is created, owing to a continous flow) after welding) part

- Use the gauge to keep the nitrogen pressure stable.


- Pour nitrogen sufficiently before welding, and stop
pouring when the pipe cools down completely.

VRF System Installation Basic Copyright 2015@LG Electronics / AE Company All Rights Reserved
2. Drain work

Air Vent
Vent
The air vent should be installed for smooth drainage.
Down-slop 1/50~1/100
Down-slop 1/50~1/100
1) The air vent should be higher than the height of the pump head
2) Installation is prohibited in the toilet and kitchen exhaust area.
3) A screen should be attached at the end of the drain pipe
to prevent bugs in the ceiling
Max. 700mm

PVC elbow Down-slope 1/50~1/100


Max 300mm
Max 700mm

PVC

Flexible drain
Flexible drain hose
hose
(Accessory)
(Accessory)

Common drain pipe

VRF System Installation Basic Copyright 2015@LG Electronics / AE Company All Rights Reserved
2. Insulation work

Refrigerant pipe : Use EPDM and finish up with the dedicated EPDM tape.

Refrigerant pipe Insulation material EPDM glue EPDM tape


(EPDM)

Drain pipe : Apply drain insulator with fire retardant PE material, and wind a silver foil tape around the
insulator joint part and finish up with a finishing tape.

PVC drain pipe Insulation materials Foil tape Vinyl tape


(PE – more than 8t)

VRF System Installation Basic Copyright 2015@LG Electronics / AE Company All Rights Reserved
2. Connection of indoor unit

(A) Insulating the joint part of the indoor unit piping


Insulation for Insulating material for pipe (accessory)
fitting(Accessory) (Use the one over 120℃ heat proof.)

Clamp(Accessory) Be sure to overlap with the insulating material for pipe

Be sure there is no gap to press the lagging materials tightly.

(B) Insulating the joint part of the drain connection part


Insulating material for drain hose (Thickness over 8 mm)

Flexible drain hose


PVC pipe (Ø32)
(Insulation)

Glue the joint

Do not use any adhesive (It needs to be removed for drain inspection and repair)

Be sure there is no gap.

VRF System Installation Basic Copyright 2015@LG Electronics / AE Company All Rights Reserved
Case study

1 2 3

4 5

VRF System Installation Basic Copyright 2015@LG Electronics / AE Company All Rights Reserved
3. Hanging indoor unit

Tighten the nut and bolt to


prevent the unit from falling

(A) Hanging bolt location (B) Insert the set anchor

Ceiling

Connecting nut

Suspension bolt

Ceiling board

(C) Prepare suspension bolt and parts (C) Hanging indoor unit

VRF System Installation Basic Copyright 2015@LG Electronics / AE Company All Rights Reserved
3. Installation of decoration panel

Is the indoor unit front panel installed in a horizontal position? Inspection hole should be
install near by the indoor unit.

Leak

Leak from the texture side.

Stains are created.

Water is condensed.
[Standard]
Is there any gap between the front panel and ceiling texture side?

The front panel should be fixed, so that


[Standard]
no gap is created from the texture side.

VRF System Installation Basic Copyright 2015@LG Electronics / AE Company All Rights Reserved
Case study

1 2 3

4 5 6

VRF System Installation Basic Copyright 2015@LG Electronics / AE Company All Rights Reserved
4. Electrical wiring : Power and communication cable

1. Communication line specification : between outdoor unit and indoor unit, and outdoor unit master and slave
Type: VCTF-SB 1.25 ㎟ or wider (shield line)
Insulating materials : PVC (maximum allowable temperature: 60℃)
Maximum distance for communication: Shorter than 1000 m

2. Remote controller line


Type: 3-line cable

3. Central controller
Wire cross-
Item Wire type
sectional area
ACP & AC Manager 2 lines (2-line shield line/20line cable) Over 1.25mm2

AC Smart 2 lines (2-line shield line/20line cable) Over 1.25mm2

Simple central control 4 lines (2-line shield line/20line cable) Over 1.25mm2 VCTF-SB

4. Separation distance between the communication line and power line


The system can malfunction due to the interference signal caused by the combination of the electrostatic and electromagnetic field generation effect.

Separation
Current capacity of the power line *Caution
distance
- Do not insert the power lien and communication
Power line and communication
Internal equipment 50mm or more line into the same transmission line.
line of the indoor and outdoor unit
10A 300mm or more - Do not bind the power line and communication
Other facility power lines 50A 500mm or more line together.
(Over 100V) 100A 1,000mm or more - If distortion continues in the power supply
100A over 1,500mm or more
waveform, increase the separation distance.
It is assumed that the length of parallel cables is up to 100m.

VRF System Installation Basic Copyright 2015@LG Electronics / AE Company All Rights Reserved
4. Connection diagram of power and communication lines

(A)

(B)

VRF System Installation Basic Copyright 2015@LG Electronics / AE Company All Rights Reserved
4. Communication wiring between outdoor unit

1) Communication line Connect in pairs (A → A and B → B)


2) GND is the "-" terminal for outdoor unit dry contact. (not grounding)
3) Insert all wires into the wire pipe.

[External PCB]

VRF System Installation Basic Copyright 2015@LG Electronics / AE Company All Rights Reserved
4. Communication wiring between outdoor and indoor unit

A B [IDU PCB]

(A)
1) Communication line Connect in pairs (A → A and B → B)
2) GND is the "-" terminal for outdoor unit dry contact. (not grounding)
3) Insert all wires into the wire pipe.

[ODU External PCB]

VRF System Installation Basic Copyright 2015@LG Electronics / AE Company All Rights Reserved