System Drawings

The document outlines electrical installation guidelines, including layout drawing reviews, color coding for circuits, and conduit specifications. It emphasizes the contractor's responsibilities for equipment layouts, circuit breaker modifications, and proper installation practices. Additionally, it details requirements for cable protection, grounding, and maintenance of minimum distances between systems.

Uploaded by

ahmed7737758
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views11 pages

System Drawings

The document outlines electrical installation guidelines, including layout drawing reviews, color coding for circuits, and conduit specifications. It emphasizes the contractor's responsibilities for equipment layouts, circuit breaker modifications, and proper installation practices. Additionally, it details requirements for cable protection, grounding, and maintenance of minimum distances between systems.

Uploaded by

ahmed7737758
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

1 2 3 4 5 6

REMARKS:

1- The layout drawings do not illustrate all 7- The color coding for a four-wire circuit is as panel schedules.
A systems, items, or accessories included in the follows: 14- Maintain a minimum separation distance of A

scope of electrical works. These drawings One black 300mm between low-current systems and
must be reviewed in conjunction with all One red low-voltage power cables.
relevant specialist drawings and specifications. One blue 15- The maximum filling ratio for power and
2- Do not scale directly from the layout One yellow communication conduits in site work is as
drawings. Work must adhere to architectural or 8- Any conductor intended for grounding follows:
electrical details unless otherwise authorized. purposes shall be green with a yellow stripe. - For power cables: Minimum diameter of
3- All equipment layouts provided are In the absence of specific indications in the 50mm, with a maximum conduit capacity of
provisional. The contractor shall finalize the drawings or specifications, installations shall 40%.
layout based on construction/shop drawings be executed to the satisfaction of the PAH - For low-current systems: Minimum diameter
and ensure coordination with other trades. Engineer. of 50mm, with a maximum conduit capacity of
4- The sizes of conduits and/or cable trays are 9- For the exact quantity, type, and location of 40%.
generally not shown on the drawings. The electrical outlets, refer to the interior design 16- Circuit breakers with a frame rating above
B contractor shall select the appropriate sizes in documents. 100A must feature adjustable thermal overload B

accordance with the Bill of Quantities (BOQ), 10- The contractor is responsible for modifying settings.
applicable regulations, and standards, the number of circuit breakers, their ratings, 17- The distance between earth pits shall be at
considering the number and size of the and wiring configurations as per manufacturer least double the length of the earthing rod.
conductors involved. data without incurring additional costs.
5- Perforated cable trays shall be securely 11- Unless otherwise specified, the minimum
fixed and properly covered. They must not be conduit size for exterior installations is 25mm in
directly mounted onto the roof slab. diameter or as indicated in the panel schedule.
6- Earth continuity conductors are not explicitly 12- The contractor shall provide compatible
indicated in the drawings but shall be included plug-ins for all specialized outlets.
with all circuits as per specifications, 13- For Ground-Fault Circuit Interrupters
regulations, and standards. (GFCI), refer to the plans and

C C

1 2 3 4 5 6
c
1 2 3 4 5 6

A A

WELL HEAD

B VALVES CHAMBER B

TO TANK
L = 1508 m
H = 10 m EXISTING PIPE SIZE "3

C C

1 2 3 4 5 6
c
B
A

c
1
1

Tension Wire Tension Wire


191

382

2000

2
2

3
3

13,8

4
4

4,8 2 4,8 2
5
5

6
6

B
A

C
1 2 3 4 5 6

Notes :
1- Minimum distance of " A " is 5 m, the location of the
pole can be adjusted according to site conditions.

2- Perforated cable try shall be used to protect the cables


from the Panels strings to the ground surface, HDPE or
A A
PVC pipes shall be used for underground cable laying. DETAIL-B

LIGHTNING ARRESTER AC≈


Will be install in 3Meter WATER PUMP INVERTER
DC=
LIGHTNING height above PV panels
PIT FIRE EXTINGUISHER

STAND ALONE BATTERY

A
S&H D
SMOKE & HEAT DETECTOR

STAND ALONE SOLAR


STREET LIGHTING

EARTHING JUMPER
_+ _+ _+ _+ _+ _+

_+ _+ _+ _+ _+ _+

Tension Wire
EARTHING BUS BAR
143

2000
286
DC-COMBINER BOX

Tension Wire
_+ _+ _+ _+ _+ _+

_+ _+ _+ _+ _+ _+

3PH CABLE
DETAIL-C INVERTER GEN TO INV
B A B
DC =
AC≈
SINGLE PANEL 535W
CB
A
NO OF PANELS 24
NO OF STRINGS 3
LIGHTNING
PIT
LIGHTNING ARRESTER NO OF MOUNTING TYPE(1) 00
Will be install in 3Meter STRUCTURES
height above PV panels TYPE(2) 02

Notes :
1- Entrance portion of cable from outside to the SDB1

inverter room shall be protected by GI pipes .


2- Routing cables on the ground of the room shall
be protected by either GI pipes fixed properly to
the ground or underground with plastic pipes
covered with concrete.
3- Routing cables on the walls of the inverter
room shall be inside proper perforated cable tries.

C C

1 2 3 4 5 6
c
1 2 3 4 5 6

PV Modules Strings Combiner Box Hybrid Pump Inverter Submersible Pump

1x6 [Link]
SOLAR CABLE
A 12 PV 2 CABLES (RED& BLACK) A
Modules 2x15A
11 1
_+
String

4 7
AC≈
DC =
10
1x6 [Link]
SOLAR CABLE
3 SPD 6
2 CABLES (RED& BLACK)
12 PV 2x15A
2 Modules
_+

Water
String Level
Sensors
In the

8 5 Water Tank

9
12
External Electrical
B Source B

Well Code ABY-B Sn Item Size / Capacity


Sn Item Size / Capacity
6 Level Sensor Cable , mm2 3 x 1.5
1 Inverter Power, KW 21
7 Pressure SwitchCable, mm2 2 x 1.5
2 # of PV Strings 2
3 DC cable Between Arrays, mm2 6 mm2 8 Earthing Cable between PV modules, , mm2 1x6
4 DC cable From between 10 mm2 9 Earthing Cable from bus bar to earthing pit , 1 x 25
Combiner & Inverter, mm2 mm2
5 Pump AC Cable , mm2 4 X 25 mm2 10 Earthing Cable from Inverter to the Bus bar , 1 x 16
mm2
11 COMBINER DC CIRCUIT BREAKER SIZE "10kA" , A 40
C C
12 INPUT AC CIRCUIT BREAKER, A 32

1 2 3 4 5 6
c
1 2 3 4 5 6

A= combiner Box Width +20 cm


From PV panels
A string
1
1
A A

2 Perforated cable tray


combiner Box
I-Beam column
of mounting structure

140 cm
3
2

Mounting structure HDPE Pipe


3 foundation
3 2
Ground level
B B

To combiner
box
4
To pv strings

Notes :
1-The Frame shall be welded properly and 1- C channel 80x40 x 5mm To inverter
according to welding best practice 2- Angle 50x50x4mm
2- The frame shall painted by at least two
layers of anti corrosion and synthetic 3- Cable Tray size will be according to the
enamel paint. number of cables x 1.5 for future, shall be
bolted on the frame

4- Concrete foundation 30cm depth x30cm width.


Perforated Cable Tray Typical Installation
C
Combiner Box Frame Typical Installation C

1 2 3 4 5 6
c
1 2 3 4 5 6

Note:
PV Panel of 1- Shading of PV module of the street lighting
2" Holder pipe.
inside room light. lamp on the PV panels shall be avoided, so
Xref ..\..\..\..\11-Forms\Sheet D1-01 lighting [Link] distance from the post to PV modules to be
checked by contractor according to site
adjustments and conditions.
0.5 m

2- All dimensions in cm.

M10x50 Concrete bolt

15°
A A

2.5 inch Hot Dip Galvanized


3.5mm Thickness

200x200x5 mm
base plate.
Roof of
Well room 12 mm dia x 300 mm
Anchor bolt

20
400
60
PV Panel of room lighting typical installation 3 14 on both
directions

8 mm @ 15 cm
1 12'' pipe, t=2mm Lamp
B 60 B

Pole Concrete Foundation Details

concrete bolt
M6x50 150

pipe clamp
1 12'' , t=2mm

150
Room Wall 14

20
t= 6mm
Base Plate Detail
20

C
DETAIL - A DETAIL - B C

1 2 3 4 5 6
c
1 2 3 4 5 6

A A

40 cm

25 Cm
100 cm

60 Cm
40 cm

30 Cm
90mm

250mm 60mm

100mm

B B
1.2m

5 Cm
2" PVC PIPE SCH 40

EARTH PIT DETAILS SECTION A-A

C C

1 2 3 4 5 6
c
1 2 3 4 5 6

Clearance shall be maintained 1


between the pipe and the concrete wall
0.15 m
ELEVATED
Water

0.6 m
Tank

0.3 m
2

A 3 A

32 m

0.1
solar
pumping
inverter
controller
1- C.S cover, Min. plate thickness Min 1.2 m
DC AIR VENT VALVE
Min. Stright 3 mm, angle of the frame
distance
AC
ISOLATION BALL VALVE
= 5 x pipe Dia. 50x50x5mm shall be painted with
Pipe Clamp Support on
at least two layers, anti corrosion concrete block for holding
Min. Stright distance

0.6 m
PRESSURE SWITCH
= 3 x pipe Dia. and ename the movment of the pipe
PRESSURE GAUGE
2- cover shall be sloped to avoid (refer to detail A)
water [Link] PVC pipe,
¾ inch in the lower level.
3-15 cm solid concrete block 0000000

Wall shall be plastered and


painted from internal and external
surfaces
Ground . A
level
A= Spacing between the
RISER PIPES pipe support and the
B B
Notes : concrete chamber

26 m
CABLE CLAMPS A max. = 2m
Length of the chamber will be adjusted according
to the dimensions of the valves, connections and Pipe Clamp
SENSORS ADDITIONAL VERTICAL fitting so the valve shall be positioned with
IN-LINE CHECK VALVE
enough space for removing and reinstallation
during maintenance.
SUBMERSIBLE
MOTOR CABLE
60
8m

3 14 on both
PUMP directions
Ø 6"
8 mm @ 15 cm

60
Note:
PUMP MOTOR The contractor is required to check the needed
number and spacing of the auxiliary check Detail A
valves based on the manufacturer's equirements Pipe Support Concrete block
for the actual manufacturer that will be approved
for installation
C C
VALVE CHAMBER AND SUPPORTS DETAILS

1 2 3 4 5 6
c
1 2 3 4 5 6

50
50 5

20°
A A

2
2

140 cm
1
INVERTER 3
2 1

3
2

B B

4
FRONT-VIEW From Combiner Box

SIDE-VIEW
1- C channel 80x40 x 5mm To pump
Notes :
1-The Frame shall be welded properly and 2- Angle 50x50x4mm
4- Concrete foundation 30cm depth x30cm width.
according to welding best practice 3- Cable Tray size will be according to the
2- The frame shall painted by at least two number of cables x 1.5 for future, shall be 5- 1mm Plate shall be Fixed with Bolts
layers of anti corrosion and synthetic bolted on the frame
enamel paint.

Inverter Frame Typical Installation

C
DETAIL - C C

1 2 3 4 5 6
c
B
A

c
Tension Wire Tension Wire

1
1

2
2

3
3

4
4

.3m
5
5

.3m

.1m
1m
2m
1m

6
6

2m 2m 2m
6m
B
A