0% found this document useful (0 votes)
37 views4 pages

APS Lab 08

The document presents practical exercises related to normal distribution, including plotting distributions with specified mean and standard deviation values. It provides statistical insights, such as the proportion of students completing tasks within certain time frames and the time taken by 75% of students. Key findings include that 81.86% of students take between 40 and 55 minutes, while only 2.28% take longer than 60 minutes.

Uploaded by

talal haider
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views4 pages

APS Lab 08

The document presents practical exercises related to normal distribution, including plotting distributions with specified mean and standard deviation values. It provides statistical insights, such as the proportion of students completing tasks within certain time frames and the time taken by 75% of students. Key findings include that 81.86% of students take between 40 and 55 minutes, while only 2.28% take longer than 60 minutes.

Uploaded by

talal haider
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Submitted By: Syed Muhammad Talal Haider December 30, 1899

Practical No. 08
1. Plot the normal distribution with µ=100 and σ=10.

X F(X) X F(X)
70 0.00135 10 0.539828
1
71 0.001866 10 0.57926
2
72 0.002555 10 0.617911
3
73 0.003467 10 0.655422
4
74 0.004661 10 0.691462
5
75 0.00621 10 0.725747
6
76 0.008198 10 0.758036
7
77 0.010724 10 0.788145
8
78 0.013903 10 0.81594
9
79 0.017864 11 0.841345
0
80 0.02275 11 0.864334
1
81 0.028717 11 0.88493
2
82 0.03593 11 0.9032
3
83 0.044565 11 0.919243
4
84 0.054799 11 0.933193
5
85 0.066807 11 0.945201
6
86 0.080757 11 0.955435
7
87 0.0968 11 0.96407
8
88 0.11507 11 0.971283
9

1
Submitted By: Syed Muhammad Talal Haider December 30, 1899

89 0.135666 12 0.97725
0
90 0.158655 12 0.982136
1
91 0.18406 12 0.986097
2
92 0.211855 12 0.989276
3
93 0.241964 12 0.991802
4
94 0.274253 12 0.99379
5
95 0.308538 12 0.995339
6
96 0.344578 12 0.996533
7
97 0.382089 12 0.997445
8
98 0.42074 12 0.998134
9
99 0.460172 13 0.99865
0
10 0.5 13 0.99865
0 0

2
Submitted By: Syed Muhammad Talal Haider December 30, 1899

2.
a) Obtain a plot of normal distribution

Distribution Plot
Normal, Mean=50, StDev=5
0.09

0.08

0.07

0.06
Density

0.05

0.04

0.03

0.02

0.01
0.025 0.025
0.00
40.20 50 59.80
X

b) Proportion of students taking 40 and 55 minutes

Distribution Plot
Normal, Mean=50, StDev=5
0.09

0.08
0.8186
0.07

0.06
Density

0.05

0.04

0.03

0.02

0.01

0.00
40 50 55
X

81.86 % students are taking time between 40 and 55 minutes to complete a task.

3
Submitted By: Syed Muhammad Talal Haider December 30, 1899

c) Proportion of students taking longer than 1 hour (60 minutes)

Distribution Plot
Normal, Mean=50, StDev=5
0.09

0.08

0.07

0.06
Density

0.05

0.04

0.03

0.02

0.01
0.02275
0.00
50 60
X

2.28 % students take longer than an hour or 60 minutes to complete a task.

d) What less time 75 % of all students take to complete a task

Distribution Plot
Normal, Mean=50, StDev=5
0.09

0.08

0.07

0.06
Density

0.05

0.04
0.75

0.03

0.02

0.01

0.00
50 53.37
X

75 % of all students take less than 53.37 minutes to complete the task.

You might also like