velocity is an optional but often used indication of the average amount of product backlog turned in to
product increment during a sprint by scrum team
we can use historical data to predict the velocity and if the team is old and technology is known
1.First step is estimate the product backlog-total estimate for product backlog is around 200
we need to identify the tasks for the reference story and how many hours it will take for the task to
completed.we can ujse Fibonacci series .Anything over 8 hours we need to break it further
4.Find the team capacity-how many hours bthe team will contribute to the project
check with team on their available hours with non essential tasks
1.What are the key components of well written user story and why they are important for agile
development project.A well-written user story in an Agile project typically includes the user's role, the
desired outcome (what), and the value the user gets from it (why), along with acceptance criteria. These
components are crucial because they ensure a user-centric approach, guide development, and facilitate
communication and collaboration among team members and stakeholders. 4c of us
1.context,card,converstion,confirmation
The name of the larger feature or epic that encompasses the story.
A concrete and validated design artifact from which the story can be derived (if applicable). The design
artifact visually represents a concrete idea for the solution, like a wireframe. It has been validated by
stakeholders (see more on that below). It provides the team with a shared understanding of the story’s
context and serves as a starting point to derive the story Card, Conversation, and Confirmation. Note
that more than one story could potentially be derived from the same design artifact.
2.Card-as an admin I want to view all the reports in Report tab.as an admin I should be able to edit
master pages
Converstion-order by functionality
4.Confirmation(Verification) or Acceptance criteria
Invest criteria
The INVEST criteria are a set of guidelines used to ensure user stories in Agile development are well-
defined and can be effectively managed. The acronym INVEST stands for Independent, Negotiable,
Valuable, Estimable, Small, and Testable.
“V” aluable (or vertical)-how valuable from the end user presecpive
“T” estable (in principle, even if there isn’t a test for it yet)
DOD-code merge
SonarQ-
unit testing
code review
performance testing
2.When estimating for the project task what are the most effective methods for new teams vs
experienced one
one estmation technique is not applicable to all teams.Based on the maturity of the team
in case of new team since they are not familiar with Sp will start asking them to put in hours .After 3 or 4
sprints the team will be in apposition to work on estimation,then we can introduce t shirt sizing or
fibonaci series,then after 3 to 4 sprints we can introduce the sp
based on simpler story like 1 sp we can estimate the remaining stories based on Fibonacci series
I believe that the sprint retrospective is the most important event in Scrum, and I also believe that it is a
great opportunity for the scrum master or agile coach to connect with the team in a meaningful way that
leads to improvement.
Sprint Retrospective:
This event is valued because it provides a dedicated time for the Scrum Team to reflect on the previous
sprint, identify areas for improvement, and plan actions to enhance future sprints. The retrospective
fosters a culture of continuous improvement and allows the team to collectively address challenges and
celebrate successes.
The sprint retrospective is possibly the most valuable event that the Agile world has within it, an event
where the team come together and evaluate what is working, what needs work, where and how the
team can improve in the next sprint.
Kaizen is a philosophy of continuous improvement through learning and adapting based on what we
have learned. The sprint retrospective is the opportunity we have to get just that little bit better, each
sprint, and continuously evolve into a far more effective, creative, and collaborative team.
Sprint Planning:
While important, Sprint Planning can be more challenging. It requires the team to carefully select and
estimate the work they will undertake during the sprint, ensuring that they understand the sprint goal
and the tasks necessary to achieve it. Effective collaboration and realistic task estimation are crucial for a
successful sprint.
5.Conflict management
The seven steps in conflict resolution involve: acknowledging the problem, gathering information,
clarifying the source of the conflict, having a meeting to discuss the situation, developing a plan to
resolve the issue, evaluating the progress of the plan, and identifying takeaways for future conflicts.
Acknowledge the Problem: Recognize that a conflict exists and that it needs to be addressed.
Gather Information: Collect relevant details about the conflict, including what happened, who was
involved, and how different parties perceive the situation.
Clarify the Source: Pinpoint the root cause of the conflict to understand the underlying issues.
Have a Meeting: Facilitate a discussion where all parties involved can express their perspectives and
understand each other's viewpoints.
Develop a Plan: Brainstorm potential solutions and collaboratively choose a plan that addresses the
conflict's root cause and benefits all parties involved.
Evaluate Progress: Regularly assess how the plan is working and make adjustments as needed.
Identify Takeaways: Reflect on the conflict resolution process to identify lessons learned and improve
future conflict management strategies.
6.utilised ur knowledge certificate in helping the removing the impediments or achieving the goals
7.How the team respects u as scrum master and what behaviours is required for good scrum master
A team will respect you as a Scrum Master by observing your actions and behavior, which should reflect
strong leadership, servant leadership principles, and a commitment to the team's success. Key behaviors
include fostering a safe and trusting environment, helping the team understand boundaries, providing
praise and support, and knowing when to break the rules, all while promoting a culture of respect and
open communication.
Respectful Communication:
Listen actively to team members' ideas and concerns, and provide constructive feedback without being
dismissive, according to Advance Agility.
Ensure the team feels comfortable sharing their thoughts and concerns without fear of judgment or
repercussions, according to tryScrum.
Be open and honest about the project's goals, progress, and challenges, and encourage open
communication within the team.
Leading by Example:
Demonstrate the Scrum values (courage, focus, commitment, respect, openness) in your own behavior
and actions.
Empower the team to make decisions and take ownership of their work, while still providing guidance
and support when needed.
Prioritize the team's needs and well-being over your own, and help them to develop their skills and
capabilities, according to Scrum.org.
Removing Impediments:
Actively identify and remove obstacles that are hindering the team's progress, such as organizational
roadblocks or internal conflicts.
Facilitating Collaboration:
Help the team to collaborate effectively, by facilitating meetings, resolving conflicts, and promoting a
culture of teamwork. Coaching and Mentoring:Provide guidance and support to the team members,
helping them to develop their skills and grow professionally, according to Agilemania.
Focusing on the Team's Success:
Celebrate the team's successes and provide constructive feedback to help them learn and grow,
according to Mountain Goat Software.
Strong Communication and Facilitation Skills:Be able to communicate effectively with the team and
stakeholders, and facilitate meetings and discussions.
Leadership and Influence:Be able to influence others without using authority, and inspire the team to
achieve their goals, according to Medium.
Deep Understanding of Scrum:Have a strong understanding of Scrum principles and practices, and be
able to apply them effectively in the team's work.
Problem-Solving and Decision-Making:Be able to identify and solve problems, and make decisions that
are in the best interest of the team.
Feature teams and component teams are two different approaches to organizing development teams,
each with its own strengths and weaknesses. Feature teams are cross-functional and cross-component,
focusing on delivering complete end-to-end features from the product backlog. Component teams, on
the other hand, specialize in building and maintaining specific components or subsystems that can be
used by multiple features
Key Differences:
Feature
Focus
Scope
Ownership
Component-Individual component team owns the design and implementation of their component
Value Delivery
Feature-Faster delivery of end-user value
Learning
Communication
Compoenent-Less need for communication with other teams, as long as the component is well-defined
When the focus is on delivering end-to-end value and meeting customer needs.
When teams need to learn about different parts of the product and collaborate effectively.
When there is a need for reusable components that can be used by multiple features.
When the system architecture is complex and requires specialized teams for different components.
When there is a need for expert development and maintenance of specific technologies or services.
In summary:
Feature teams focus on delivering complete features, while component teams focus on building reusable
components.
Feature teams are better for organizations that prioritize end-user value and rapid delivery.
Component teams are better for organizations that have complex systems and need specialized expertise
in specific technologies.
A hybrid approach, using both feature and component teams, can be effective in many organizations.
Fun
Item: We love going to work, and have great fun working together
Facilitation tips:
What did you enjoy most about your work?What has been the most boring part of work for you
lately?How could we make work more fun / less boring?
Facilitation tips:What kind of task did we learn the least / the most?How much time do we take each day
to study?Which knowledge should be spread more widely in our team?
3.Support
Facilitation tips: In which situations did we get stuck due to a lack of support?
What support have we given others (within our team and beyond)?
4.Organization
Mission
Item: We know exactly why we are here, and we are really excited about it.
Which questions about our common goals have remained unclear to us?
What makes our mission exciting for us? What is still missing to make it exciting?
5. Delivering
Value
Item: We deliver great stuff! We’re proud of it and our stakeholders are really happy.
Facilitation tips:
Which topics did not bring the hoped-for benefit? Are there any patterns?
6.Suitable process
Facilitation tips:
7.Speed
Item: We get stuff done really quickly. No waiting, no delays.
Facilitation tips:
8.Tech quality
Item: We’re proud of the quality of our code! It is clean, easy to read, and has great test coverage.
Facilitation tips:
How quickly did the newest team member become familiar with the code base?
9.Easy releasing
Facilitation tips:
When was the last time something went wrong with a release?
What is the biggest pain point in our release process right now?
What's an improvement to our release process that we'd all be excited for?
Set up a team, select topics and then simply send the survey to your team. With the survey in
Echometer, team members can easily submit their anonymous ratings for the Spotify Health Check as
well as open feedback.
Once the feedback from the team is complete, you can start the online retrospective. All team members
can connect live online and work together interactively.
For all items, past results (if any) are displayed for comparison as well as food for thought, which makes
it easy to start a conversation. The reflections can be recorded in the comments.
After the retrospective, the results from the team health check are then visible to all team members in
retrospect on the team's dashboard.
Key Performance Indicators (KPIs) in Agile Scrum help teams measure progress, identify issues, and make
improvements. Some key metrics include velocity, sprint burndown, cycle time, throughput, and escaped
defects. These KPIs are used to track team performance, predict future performance, and make data-
driven decisions.
Velocity: Measures the amount of work a team can complete during a single sprint.
Sprint Burndown: A visual representation of work left versus time, showing the team's progress on a
sprint.
Cycle Time: Measures the time it takes for a task to move from start to finish.
Throughput: Measures the number of tasks a team completes within a specific time frame.
Escaped Defects: Measures the number of defects or issues that were missed during testing and found in
production.
Lead Time: Measures the time it takes for a task to move from request to completion.
Work in Progress (WIP): Tracks the number of tasks a team is currently working on.
Sprint Goal Success Rate: Tracks the effectiveness of a Scrum team in achieving its goals.
Cumulative Flow Diagram (CFD): Visualizes the flow of work through the different stages of the
development process.
Release Frequency: Measures how often new releases are delivered to users.
By tracking these KPIs, agile teams can gain valuable insights into their performance, identify areas for
improvement, and ultimately deliver more valuable products.
A user story is a crucial factor in any Agile project’s progress. Scrum teams have a certain number of user
stories to consider in any one sprint. A KPI to track here is how many user stories have been completed
in full, how many are left to focus on, and whether any have been carried over.
In Scrum, no user stories should be automatically rolled over to the next sprint if the team has failed to
complete them in the current sprint. Any undone work should join the backlog, where it may or may not
be planned into a future sprint ahead of time. If your Scrum team has a lot of unfinished user stories,
this is a sign that things need to change.
If your Scrum team is in charge of migrating your product to production and launch, release cycle times
are a good example of a KPI to measure. Release cycles in Scrum and Agile should typically be kept short
— often only to a couple of months, with each iteration in this cycle kept to between a week and a
month. If your release cycles are dragging on past deadlines, it may be time to reconsider your
workloads.
Customer happiness
The customer’s satisfaction should always be a top priority for any Scrum team. This is the main focus of
any Agile project — if the customer isn’t happy with the result, then the project cannot be considered
successful.
There are a number of ways to measure customer happiness. These can include (where applicable):
Renewals
Response time
Product quality
The quality of the final product is also of the utmost importance to a Scrum team. Depending on the
nature of the product, a Scrum team may look at the following to determine its quality:
Defect data
Functionality
Stability
Complexity
Team happiness
Just as your customer’s happiness is important, so too should your team’s happiness. Your Scrum team
should be able to work consistently to a high standard, with minimal staff turnover or complaints. If this
is not the case, it may be time to look at the factors affecting your team’s happiness levels.
Are they burnt out because the pace of work is unsustainable? Are they feeling ignored or unappreciated
by management? Are they able to freely pitch ideas for improvement, or is creativity stifled? Are they
being properly compensated for their work? These are issues that need to be addressed sooner rather
than later for a successful outcome.
Are scrum metrics KPIs?
Although the terms “metric” and “KPI (key performance indicator)” are often used interchangeably, they
are not the same concept. Metrics are units of measurement that evaluate the KPIs. On the other hand,
KPIs are metrics with a set, time-bound goal. Product teams can use scrum metrics to set KPIs. For agile
product teams, KPIs should demonstrate how well the team satisfies customer and market needs and
supports company goals.
The story completion rate is the ratio of actual stories completed to the number of stories the team
committed to. Product teams commit to stories during sprint planning and review the number of stories
completed during the sprint review. If a team commits to 10 stories during sprint planning and delivers 8
by sprint review, their story completion ratio is 80%.
In software product development, technical debt refers to the work that builds up when developers
implement quick, short-term solutions instead of working through better, more labor-intensive solutions.
Technical debt is the cost of slapping a band-aid on a product to make a quick fix or complete an MVP.
Technical debt can be measured using a debt index. You can calculate the debt index by dividing the total
technical debt by another metric that represents the full scale of the project or system. For example, you
can calculate the debt index by dividing the total technical debt (estimated hours of work or story points)
by the codebase size (measured by lines of code). The resulting ratio approximates a scaled picture of
the remaining technical debt.
3. Velocity
Velocity is one of the most important metrics in product management. Velocity represents the
consistency of the teams’ estimates over time.
Actual velocity is the sum of units (often story points) delivered in a sprint and is calculated as the
number of delivered units divided by the total number of sprints.
For example, if a team delivers 15 story points in 1 sprint, their actual velocity is 15.
If a team delivers 100 story points in 4 sprints, their actual velocity is 25.
For example, if a team estimates they will complete 45 story points in 3 sprints, their expected velocity is
15.
Actual velocity isn’t a measure of productivity; it simply represents an average unit of completion based
on past data. Actual velocity may change due to outside factors like holidays, team changes, and
technical issues. For this reason, teams should use actual velocity as a planning tool. Over time, actual
velocity can be compared to estimated velocity to see how team output differs against expectations.
4. Burndown
Sprint burndown helps teams measure the work remaining during the sprint’s execution. Sprint
burndown is a visual representation, usually a line chart over time, that represents the rate at which the
team completes work compared to how much work still needs to be done. On a burndown chart, the x-
axis represents time increments, while the y-axis represents the number of tasks yet to be completed.
5. Escaped Defects
The number of escaped defects helps product teams evaluate the quality of their product. This metric
shows how many bugs, or defects, “escaped” testing and were experienced by users in production. In an
ideal world, scrum teams can thoroughly test stories to avoid escaped defects. In reality, sometimes bugs
get deployed to production.
Defect density, which measures the number of defects per software size, such as lines of code, can also
help teams understand their product quality.
Tracking the number of escaped defects and defect density over time can help your team understand the
quality of releases and whether that quality improves or degrades over time.
Sprint goals are one—to two-sentence statements that outline the goals of a sprint. They are an optional
part of the scrum framework, but tracking this metric over time provides insight into whether teams
meet their goals. If a team consistently misses goals, this data can help them investigate whether their
goals are realistic. Furthermore, it can help them identify roadblocks to goal success.
7. Workload Distribution
A strong product team is essential to creating a strong product. Monitoring workload distribution helps
ensure that all team members take on what they can handle. Some team members may be overworked
without visibility into workload distribution, while others may be underutilized. Ultimately, both issues
can contribute to low employee satisfaction.
Product teams may use workload distribution as a proxy variable for productivity, which can create stress
for employees. When tracking workload over time, product teams should take care to create an
environment of trust and psychological safety.
8. Team Satisfaction
Team satisfaction is a significant component of a successful scrum team. If your team members don’t feel
that their needs are met and aren’t enthusiastic about their work, then no process or methodology can
fix your team’s problems. Checking in on workload, work/life balance, happiness, and motivation helps
you gather data on your team’s satisfaction and shows that you care about your team as people.
While there are several ways to measure customer satisfaction, Net Promoter Score (NPS) is among the
most common. NPS measures whether users would recommend the product to others. Strong,
consistent NPS scores mean the product team delivers valuable products to customers.
began working as a software engineer seven years ago for an eCommerce company. I worked mostly on
brand development projects for small to mid-size companies. Our teams followed a Scrum model loosely,
and after researching Scrum in detail I felt there were significant improvement opportunities worth
exploring.
I pursued my Scrum Master Certification three years ago and worked with three of our teams to tighten
our estimation, analysis, development, testing, and implementation processes. The changes we made
resulted in an average velocity increase of 22% and we are currently working to implement similar
changes across the board.
I am pursuing a position within a larger enterprise at this time because I would like to take my skills to
the next level. I am interested in a position that will allow me to collaborate regularly with other scrum
masters and/or in a scaled agile framework setting.
2.Thank you for this opportunity. I’m an enthusiastic and dedicated Scrum Master with a passion for agile
methodologies and fostering high-performing teams. My journey in the world of Scrum began several
years ago and since then, I’ve had the privilege of working with various cross-functional teams in
different industries, which has bolstered my ability to consistently achieve my objectives. One of my core
strengths as a Scrum Master is my ability to create a collaborative and transparent environment where
teams can thrive. I firmly believe that open communication, continuous improvement, and a strong focus
on delivering value to customers are the cornerstones of agile success. I’m experienced in facilitating all
Scrum events, coaching team members, and removing impediments to ensure that the Scrum
framework is followed effectively. I’m also skilled in adapting Scrum principles to suit the unique needs
and challenges of each team I work with. In addition to my technical expertise, I possess strong
interpersonal and leadership skills, which have enabled me to build trust and motivate teams to achieve
their best. Overall, I am committed to lifelong learning and helping teams reach their full potential and
consistently delivering through the application of Scrum values and principles.”
3.As a Scrum Master, I currently oversee two teams, utilizing the Scrum Framework for our development
team and Kanban methodology for our support team. I ensure the implementation of all relevant events
and employ various facilitation techniques to enhance their efficiency. My role involves creating a
supportive environment that encourages full participation from developers, assisting them in achieving
their objectives. support the Product Owner in documenting the vision roadmap using Confluence and
guide the development team in outlining their working agreements within the same tool. Additionally, I
focus on helping developers identify and understand their skills through a skill matrix. In my capacity, I
actively identify risks, updating them in the risk register, and continuously evaluate the agile maturity of
our teams using our organization's assessment tool.
Within Jira, I manage the creation of epics and user stories, ensuring the product backlog is
comprehensive. I proactively track internal and external dependencies to reduce wait times for my
teams. I also facilitate understanding of various reports (sprint report, velocity chart, burn-down and
burn-up charts, and time tracking report) at the end of each sprint, initiating and tracking improvement
actions in Confluence.
Collaborating with a range of business stakeholders, including release managers and business analysts, I
play a key role in the Scrum Master community of practice. I assist in maintaining product hygiene
practices and support developers in delivering high-quality products by ensuring rigorous testing at every
stage. Moreover, I oversee the documentation of code reviews, test summary reports, and other
essential artifacts in Jira.
Overall, my focus is on fostering a safe and productive environment for the team to excel in both Scrum
and Agile methodologies. I am eager to discuss this further and demonstrate my expertise in more detail
during a call. I can also share my screen to showcase specific examples of my work. Thank you very much
for considering my application.
Team Velocity
Team velocity measures the amount of work a Scrum team completes during a sprint, typically in story
points or hours. It helps estimate capacity for future sprints.
Other Metrics
2⃣Lead Time: Time taken for a feature to move from backlog to delivery.
These metrics provide insights into team performance, helping identify areas for improvement and
optimize the Scrum process. By tracking velocity and other metrics, teams can refine their workflow and
improve delivery.Team velocity is a core concept in Agile methodologies like Scrum and eXtreme
Programming (XP). It functions as a capacity planning tool, helping teams understand how much work
they can realistically complete within a specific timeframe, typically a sprint (an Agile development
iteration).
User Stories: Work is broken down into manageable chunks called user stories, representing features or
functionalities desired by the end user.
Effort Estimation: Each user story is assigned an effort value based on the team's estimation of the time
or complexity it will take to complete. This estimation is done in units defined by the team itself.
Common units include:
Sprint Planning: Teams leverage velocity during sprint planning to commit to a set of user stories they
believe can be completed within the upcoming sprint timeframe. The team's past velocity serves as a
reference point for this estimation.
Future Work Prediction: By analyzing past sprint performance and the associated velocity, teams can
make informed predictions about the amount of work they can potentially complete in future sprints.
Improved Planning and Commitment: Understanding team capacity through velocity allows for more
realistic workload planning during sprints, preventing overcommitment and potential burnout.
Enhanced Transparency: Velocity fosters transparency within the development process. Stakeholders
gain insight into the team's capabilities and anticipated delivery timelines.
Basis for Continuous Improvement: Tracking velocity over time helps identify trends and areas for
improvement. Teams can use this information to refine their estimation techniques, workflow efficiency,
or identify skill gaps.
Align your team with the goals of the sprint and the product by clearly communicating the vision, value
proposition, and user needs. Collaborate to define and prioritize backlog items, breaking them down into
manageable tasks. This helps your team focus on the most important work and avoid scope creep,
rework, and confusion.
The Scrum Guide recommends a team size of three to nine members with a mix of skills and roles to
cover all aspects of product development. A team that's too large, too small, or lacks key competencies
can slow progress and create bottlenecks. Ensure your team has the right balance and diversity of skills
for self-organization and effective collaboration.
A sprint is a fixed time-box, typically one to four weeks, where your team commits to deliver a
potentially releasable product increment. To increase velocity, establish a stable and consistent sprint
cadence. This means keeping the same sprint length, start and end dates, and ceremonies throughout
the project. This rhythm and predictability reduces overhead and disruption from changing the sprint
schedule.
Address technical issues, bugs, dependencies, unclear requirements, changing priorities, or stakeholder
interference promptly. Work with your team and the Scrum Master to identify and remove these
obstacles as soon as possible. Protect your team from external pressure that might compromise focus
and quality.
Conduct retrospectives at the end of each sprint. Here, the team reflects on what went well, what went
wrong, and what can be improved in the next sprint. Facilitate and participate in these retrospectives,
encouraging your team to share feedback openly and constructively. Implement action items, monitor
results, and celebrate achievements to recognize team efforts.
Before diving into improvement strategies, ensure everyone has a consistent understanding of velocity.
In Agile, velocity represents the amount of work a team completes in a sprint, typically measured in story
points or effort units like t-shirt sizes (XS, S, M, L, XL).
Provide examples of how story points or effort units translate to real-world workload (e.g., 1 point = 1
day of effort).
Analyze past sprint performances to understand your team's current velocity. Here's how:
Review completed user stories and their point values.Identify any bottlenecks or delays that impacted
velocity.Consider factors like team capacity, planned leave, or unexpected issues.This review helps
pinpoint areas that need improvement. For instance, consistently low velocity might indicate
inefficiencies, skill gaps, or unclear requirements.
8. Focus on Continuous Improvement :Retrospectives are crucial for continuous improvement. Hold
these meetings at the end of each sprint to reflect on:What went well: Celebrate successes and identify
practices to maintain.
What didn't go well: Discuss challenges, roadblocks, and areas for improvement.
Action items: Define concrete actions to address identified issues and experiment with new approaches.
Regularly review and iterate on your Scrum process based on learnings from retrospectives. This fosters
a culture of continuous learning and adaptation for increased velocity.
Limit the number of tasks a team member is actively working on at any given time (WIP). This helps with
improved focus and reduced context switching. Team members can dedicate more focused time to each
task, leading to faster completion. Reduced risk of unfinished work accumulating. WIP limits prevent
tasks from getting lost or forgotten.
Here are ways to manage WIP:Set WIP limits for each stage of the workflow (e.g., To Do, In Progress,
Done).Visualize WIP limits on your team board.Encourage team members to finish one task before
starting another.
Promote open communication and collaboration for improved efficiency and velocity. Create a safe
space for team members to share knowledge, ask questions, and raise concerns. Facilitate regular
discussions and knowledge-sharing sessions. Encourage pair programming or peer reviews for code and
problem-solving. Utilize communication tools like Slack or team chats for real-time collaboration.
Effective communication ensures everyone is aligned with goals, dependencies are clear, and roadblocks
are addressed quickly.
Provide opportunities for team members to develop new skills and enhance existing ones: Conduct
training sessions on Agile methodologies, Scrum practices, or relevant technical skills.
Offer mentoring or coaching programs for team members. Support participation in industry conferences
or workshops. Investing in skills development empowers your team to handle complex tasks, adapt to
changes, and ultimately contribute to higher velocity.
Identify opportunities to automate repetitive tasks or streamline workflows using tools and technologies.
Here are some examples. Automated testing tools can free up time for manual testing of more complex
features. Build automation tools can speed up the process of building and deploying code.
Common Misconceptions with Team Velocity
Considering velocity as a measure of team efficiency: While velocity reflects how much work a team
completes, it doesn't necessarily mean the team is efficient. High velocity can also indicate the team is
cramming in low-quality work or burning out to meet unrealistic goals.
Using velocity to track individual productivity: Team velocity is a team-level metric, not a measure of
individual performance. Assigning individual points based on velocity can be demotivating and doesn't
account for the collaborative nature of Agile development.
Tying velocity to performance appraisals: Using velocity solely to assess performance can have negative
consequences. Team members might prioritize velocity over quality or focus on manipulating estimates
to meet targets.
Increasing velocity at all costs: The image highlights that a focus on constantly increasing velocity can be
counter-productive. It can lead to burnout, shortcuts, and ultimately hinder the team's ability to deliver
quality work.