0% found this document useful (0 votes)
5 views2 pages

CC Cou

This NDT report details the inspection of an A319-100 aircraft's drain mast, conducted by technician Victor Villegas on June 28, 2023. The inspection utilized fluorescent-penetrant testing and found no relevant indications or cracks. The report emphasizes the importance of verifying part and serial numbers before proceeding with tasks.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views2 pages

CC Cou

This NDT report details the inspection of an A319-100 aircraft's drain mast, conducted by technician Victor Villegas on June 28, 2023. The inspection utilized fluorescent-penetrant testing and found no relevant indications or cracks. The report emphasizes the importance of verifying part and serial numbers before proceeding with tasks.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

NDT REPORT

(REPORTE DE PND)
OMA 079/ CMAE 596/ OMA 176/TAR 18-649 1.- No. PND-01-1962 Issued By : VICTOR VILLEGAS

2.- SHOP WORK ORDER N° AVIO-2994


6.- AIRCRAFT MODEL: A319-100
(# Orden de trabajo taller) (Modelo de la Aeronave)

3.- PART NUMBER : 7.-AIRCRAFT ID:


N/A CC-COU
(Núm. de parte) (Siglas de la Aeronave)
4.- PART NAME: DRAIN MAST
8.- NDT METHOD: (Método
X ET: ___ MT: ___UT: ___
PT: ___
(Nombre de la parte) de PND)

5.- SERIAL NUMBER: 9.- RECEIVED DATE:


MSN:02089 28/06/2023
(Núm. De serie) (Fecha de entrada) (dd/mm/yyyy)

Note: Please check the correct P/N and S/N, before perform the assigned task on that component, any discrepancy notify to quality control inspector or Chief
Shop. (chequear P/N y S/N antes de realizar los trabajos asignados al componente, cualquier discrepancia notificar al Inspector de Calidad o al Jefe de Taller)
10.- SOURCE DOCUMENT / REFERENCE DATA: (Documento de Referencia)
NTM 51-80-00-001-A FLUORESCENT-PENETRANT INSPECTION-PORTABLE-WATER WASHABLE.
REV. 140
ASTM E1417-21 STANDARD

11.- INSPECTION PROCEDURE: (Procedimiento de Inspección)


FLUORESCENT-PENETRANT INSPECTION WAS EVALUATED DENT IN AT APU DRAIN MAST IAW NTM 51-80-00-
001-A, REV. 140 (BC T00Q8L1K)

12.- EQUIPMENTS AND MATERIALS USED DURING INSPECTION (Equipos y materiales utilizados durante la inspección):
13.- Penetrant Testing (PT) 14.- Magnetic Particles (MT) 15.- Eddy Current (ET) 16.- Ultrasonic (UT)
(Líquidos Penetrantes) (Partículas Magnéticas) (Corrientes Inducidas) (Ultrasonido)
X
a)Method: A____ C____ D_____ a) Equip: a) Equip: a) Equip:
b)Products used: P/N P/N P/N
CLEANER SKC-S S/N S/N S/N
PENETRANT ZL-60D b)Mag Type: b)Probe: b)Probe:
EMULSIFIER ---- Circular:___________________ Freq: Freq:
DEVELOPER ZP-9F Longitudinal: ______________ Ref.Std.: Ref.Std.:
17.- RESULTS AND FINDINGS (Resultados)

No aditional relevant indications or cracks were observed during inspection

18.- TOTAL MH:


02:30
____________________________________
(Total de horas hombre)
19.- TECHNICIAN LEVEL II NAME: 20.- SIGN LEVEL II 21.- DATE
(Nombre del Técnico Nivel II) (Firma Técnico Nivel II) (Fecha) (dd/mm/yyyy)

VICTOR VILLEGAS 28/06/2023

FORM : PND-01
REV : 00
FECHA REV : 14/04/2021

You might also like