FTTM - Installation check list
Site ID: ZRI463
Site Name: ZRI463
MOP#:
District: Riyadh
No. Description Yes No N/A Remark
A FTTM Installation Check list
1 Appropriate PPE is used & EHS procedure are followed
2 ESD (Wrist strap) is used while hadling equipment & cards
3 MDU installed & power connected properly
4 MDU & power cable labelled
MDU fiber labeling done using strips & black tie wraps &
5
9mm tape
Host fiber from OSP ODF conencted to OLT port as per
6
design (4G sites)
7 CEX (5G sites) fiber connections are done as per design
8 Host fibers arranged with spiral wraps & orange duct
Host fiber labeling done using strips & black tie wraps &
9
9mm tape
10 Grounding cable is connected to appropriate point
11 Appropriate fiber types used at MDU & Host sites
12 MDU redline provided to Engineering
13 Installation completed fulfilling all criteria
B OTHERS
1
2
3
4
Subcontractor Representative Nokia Representative
Name: Ahmed Salem Name:
Signature: Signature:
Date: 10/9/2023 Date:
Mobile: 0554649920 Mobile:
Document History:
Update Document with NOKIA and Logo . Date 28-Jan-2019
Nokia
FTTM 2012 - Pre PAT check list Ver.1