STR 1
STR 1
General Notes:
A B C
2'-2"
1. DO NOT SCALE FROM THE DRAWINGS
A B C GL GL
2. STRUCTURAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH RELEVANT 8mmØ@4" C/C
16'-6" 14'-1"
ARCHITECTURAL DRAWINGS AND IN ANY CONFLICT REFER ARCHITECTURAL 16'-6" 14'-1" 12mmØ@6" C/C
8mmØ@4" C/C
5'
5. ALL DIMENSION & LEVEL ARE IN FEET-INCHES UNLESS NOTED OTHERWISE.
ALL DIMENSION TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER C6 IF3
C5
10'-8"
10'-8"
STRAP BEAM ( 14"X 26" ) ALONG 1-1 ON GRID A/B/C
9"X12"
9"X12"
9"X12"
6. GRADE OF CONCRETE MIX SHALL BE M-20 FOR COLUMNS
4'-5"
9'-6"
10'-8"
10'-8"
M20 FOR FOOTING, WALLS, BEAMS, SLABS ETC. 7'-7"
7'-7"
UNLESS NOTED OTHERWISE CONFORMING TO IS:456-2000.
C2 C3
C2 C3 1'-2" 1'-2" 2 2
IF2 SB2 14"X20" SB2 14"X20" TOP BAR
TOP BAR
4 TMT 16Ø +4 TMT 16Ø
7'-7"
2 2
2'-2"
C7
4 TMT 16Ø +3 TMT 16Ø
1'-8"
8. CLEAR COVER TO BARS
a. FOR CONCRETE MEMBERS IN CONTACT WITH SOIL = 50mm
b. FOR LONGITUDINAL (VERTICAL) BARS IN COLUMN = 40mm
C7 IF1 IF2
4 TMT 20Ø
BOTTOM BAR 4 TMT 16Ø
BOTTOM BAR
9"X12"
9"X12"
9"X12"
15'-9"
15'-9"
9. BARS IN COLUMNS SHALL BE SPLICED ONLY AT MID HEIGHT OF COLUMN.
15'-9"
15'-9"
8'-5"
10. BARS SPLICING IN BEAM SHALL BE AVOIDED IN THE SPAN WHERE
INTERMEDIATE BEAM IS CONNECTED AND SHALL BE ONLY AS SHOWN ON DWG.
11. DEVELOPMENT / LAP LENGTH (Ld.) FOR BARS. GL
7' 9'-7" GL
8mmØ@4" C/C
BAR DIA-(mm) 8 10 12 16 20 25 28 32 8mmØ@4" C/C
C7 C1
8'-8" 12mmØ@6" C/C
C7
FOR M20 Ld 1'-9" 2'-3" 2'-8" 3'-6" 4'-5" 5'-7" 6'-2" 7'-0" SB2 14"X20"
9"X12" 12mmØ@6" C/C
C1
3 3 3 3
7'
FOR M25 Ld 1'-7" 2'-0" 2'-4" 3'-1" 3'-10" 4'-10" 5'-5" 6'-2" C3
9"X12"
C3
9"X12"
5'-4"
IF3
5'-4"
12. TEMP./DISTRIBUTION REINFORCEMENT FOR SLAB - TMT 8Ø @ 200 C/C CF1 CF2
6'-9"
6'-9"
13. CLEAR VERTICAL DISTANCE BETWEEN TWO ROWS (LAYERS) OF BARS=25mm.
C1 C4
STRAP BEAM ( 14"X 20" ) ALONG 2-2 ON C1 C4 4
14. PROVIDE SHEAR REINFORCEMENT AT 4" C/C AT LAP LOCATIONS. 4 4
15. H = CLEAR SPAN OF FLOOR. 9"X12" GRID A/B/C AND ALONG 3-3 ON GRID A/B 4
16. h = H/6, OR 450mm WHICHEVER IS GREATER.
16'-1" 14'-1"
17. Z = DEPTH OF BEAM. 16'-1" 14'-1"
18. ANY DISCREPANCY NOTED BETWEEN DETAILS IN THE
DRAWINGS/SPECIFICATIONS,
A
A B C
THE MATTER SHALL BE BROUGHT TO THE NOTICE OF CONCERNED B C
10Øb+Ld
ENGINEER PRIOR
TO CONSTRUCTION AND GOT RECONCILED BEFORE EXECUTION. COLUMN LAYOUT PLAN
TRENCH PLAN & LOWER BEAM LAYOUT PLAN
9"X12"
9"X12"
9"X12"
1. B2 IF1 9' 6" 9' 6" 16" 20" 8" 12Ø @ 150mmC/C 12Ø @ 150mmC/C Isolated Footing
10'-8"
10'-8"
D
3" 3"
do
2. A2,C2 IF2 7' 7" 7' 7" 8" 16" 7" 12Ø @ 150mmC/C 12Ø @ 150mmC/C Isolated Footing
3. A3,B1 IF3 7' 0" 7' 0" 8" 16" 7" 12Ø @ 150mmC/C 12Ø @ 150mmC/C Isolated Footing
L
4. C1 IF4 6' 0" 6' 0" 8" 16" 7" 12Ø @ 150mmC/C 12Ø @ 150mmC/C Isolated Footing 2 2
9"X12" 9"X12"
5. A1 IF5 5' 0" 5' 0" 8" 16" 7" 12Ø @ 150mmC/C 12Ø @ 150mmC/C Isolated Footing
4" L 4"
6. B3-B4 CF1 11' 2" 9' 7" 22" 12Ø @ 150mmC/C 12Ø @ 100mmC/C COMBINED Footing
9"X12"
9"X12"
9"X12"
4"
7. C3-C4 CF2 8' 8" 7' 11" 16" 12Ø @ 150mmC/C 12Ø @ 100mmC/C COMBINED Footing
15'-9"
15'-9"
BARS ALONG Y -AXIS
COLUMN REINFORCEMENT SCHEDULE 14"x14"
CONCRETE GRADE = M20
d/2
STEEL GRADE = Fe500
LATERIAL TIES
C d/2
B
COLUMNS GRID GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR
IN(h+z) IN(H-2h) 9"X12" 9"X12"
1'-2" 1'-2" 1'-2" 1'-2"
7'-7" 3 3
9"X12"
C3 C2,C3 8Ø @ 4" C/C 8Ø @ 6" C/C
9"X12"
1'-2"
1'-2"
1'-2"
1'-2"
5'-4"
4 TMT 20Ø 4 TMT 20Ø 4 TMT 20Ø 4 TMT 20Ø
BARS ALONG X-AXIS
6'-9"
C3
2 LEGGED STIRRUPS 2 LEGGED STIRRUPS 2 LEGGED STIRRUPS 2 LEGGED STIRRUPS
TMT 8 Ø -4"/6" C/C TMT 8 Ø -4"/6" C/C TMT 8 Ø -4"/6" C/C TMT 8 Ø -4"/6" C/C
R 14"X20" 9"X12"
C4 C4 8Ø @ 4" C/C 8Ø @ 6" C/C
R 4
1'-2"
1'-2"
1'-2"
1'-2"
TMT 8 Ø -4"/6" C/C TMT 8 Ø -4"/6" C/C TMT 8 Ø -4"/6" C/C TMT 8 Ø -4"/6" C/C
1'-2"
1'-2"
1'-2"
2 LEGGED STIRRUPS
4 TMT 20Ø
2 LEGGED STIRRUPS
4 TMT 16Ø
2 LEGGED STIRRUPS
4 TMT 16Ø
2 LEGGED STIRRUPS
IF2 SCALE:- 1"=2'-0"
A
TMT 8 Ø -4"/6" C/C TMT 8 Ø -4"/6" C/C TMT 8 Ø -4"/6" C/C TMT 8 Ø -4"/6" C/C
B B C
C6 A1 8Ø @ 4" C/C 8Ø @ 6" C/C
1'-2"
1'-2"
1'-2"
2 LEGGED STIRRUPS
4 TMT 20Ø
2 LEGGED STIRRUPS
4 TMT 20Ø
2 LEGGED STIRRUPS
P C
1'-2"
TMT 8 Ø -4"/6" C/C
1'-2"
TMT 8 Ø -4"/6" C/C
1'-2"
TMT 8 Ø -4"/6" C/C
1'-2"
9'-7" FOUNDATION AND PLINTH BEAM
C7
A2,A3 8Ø @ 4" C/C 8Ø @ 6" C/C
C Q LAYOUT PLAN SIGNATURE:
1'-2"
1'-2"
1'-2"
1'-2"
2 LEGGED STIRRUPS
TMT 8 Ø -4"/6" C/C
2 LEGGED STIRRUPS
TMT 8 Ø -4"/6" C/C
2 LEGGED STIRRUPS
TMT 8 Ø -4"/6" C/C
2 LEGGED STIRRUPS
TMT 8 Ø -4"/6" C/C 8'-8"
C1 Mrs. MANISHA DEV
RESIDENTIAL
LATERIAL TIES
GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR C 3 4
COLUMNS GRID
IN(h+z) IN(H-2h) 4 3 AREA: PLOT NO:
As per lalpurja:1369 SQ FT
1'-5" 1'-5" 1'-5" 1'-5"
C1 4 C4 4 as per site: 1339.24 SQ FT 301 & 307
8Ø @ 4" C/C 8Ø @ 6" C/C
C1 B1,B3,B4
4 4
1'-5"
1'-5"
1'-5"
1'-5"
1'-5"
2 LEGGED STIRRUPS
TMT 8 Ø -4"/6" C/C
1'-5"
2 LEGGED STIRRUPS
TMT 8 Ø -4"/6" C/C
1'-5"
2 LEGGED STIRRUPS
TMT 8 Ø -4"/6" C/C
7"
9"X12" 9"X12" 12Ø @ 4"C/C
3-12Ø (TH) 12Ø @ 6"C/C ABINASH SAH Ar. ANAND GUPTA
P
1'-4"
3-12Ø (TH)
Q
3-12Ø (TH)
C2 B2
1'-5"
1'-5"
1'-5"
1'-5"