Civ 01 R0

The document is a submittal approval for the proposed G+ Mezzanine Group of Warehouses at Al Qouz Industrial Third, Dubai, submitted by Maker Dynamics General Trading LLC. It includes details about the contractor, consultant, and specific documents being submitted for approval, such as uplift calculations and method statements. The contractor is reminded of their responsibility to comply with project requirements and coordinate with other trades.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views1 page

Civ 01 R0

The document is a submittal approval for the proposed G+ Mezzanine Group of Warehouses at Al Qouz Industrial Third, Dubai, submitted by Maker Dynamics General Trading LLC. It includes details about the contractor, consultant, and specific documents being submitted for approval, such as uplift calculations and method statements. The contractor is reminded of their responsibility to comply with project requirements and coordinate with other trades.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

MAKER DYNAMICS

GENERAL TRADING L.L.C

DOCUMENT SUBMITTAL APPROVAL REV.


PROPOSED G+ MEZZANINE GROUP OF WAREHOUSES
Doc No. : DOC-CIV-01 0

PROPOSED G+ MEZZANINE GROUP OF WAREHOUSES ON PLOT NO. 3680280 AT AL Date: 15-07-2025


QOUZ INDUSTRIAL THIRD, DUBAI Submitted For * 1 Code
APPROVAL 1
CONTRACTOR: Venus Star Construction L.L.C.
YOUR INFORMATION 2

Contract No.: ACTION **


CLIENT: Maker Dynamics General Trading LLC
APPROVED A

APPROVED AS NOTED B
CONSULTANT: M/s EDMAC Engineering Consultant
REVISE & RESUBMIT C

WE ARE SENDING HEREWITH / UNDER SEPARATE COVER, THE DRAWINGS/ REJECTED D

DOCUMENTS / SAMPLES LISTED BELOW. (DELETE AS NECESSARY)


CODE
QTY DRWS., SPEC. OR DESCRIPTION TYPE
Submittal No. Action

1 Description Uplift Calculation & Method of Statement Method of Statement

2 Manufacturer

3 Local Supplier

4 Sub-contractor APEX Land Dewatering


5 Location/use of material Underground Holding Tank and Storm Water Tank

TYPE MS : MATERIAL SUBMITTAL SM : SAMPLE GT : GUARANTESS MD : MAN. DATA TT : TEST RESULTS SP : SUB-PREQ
CA : CALCULATION MOS : METHOD STATEMENT TF : TEMP. FACILITIES CT : CERTIFICATE MK : MOCKUPS
SD : SHOP DRAWINGS OT : OTHERS

Programme of Work Activity ID Ref: Planned Start:


Programme of Work Description: Planned Finish:
Copies

Engr. Shabeer
For Contractor
CONSULTANT'S COMMENTS

Copies To:
Resident Engineer :

For EDMAC Engineering Consultants Date:


Copies To:

Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the requirements of the drawings and specifications. This check is only for review of general
conformance with the design concept of the project and general compliance with the information given in the contract documents. The contractor is responsible for confirming and correlating all quantities and dimensions
selecting fabrication processes and techniques of construction; coordinating his work with that of other trades, and performing his work in a safe and satisfactory manner.

1.16 Technical Transmittal Form : Submittal Form 1.08 Technical Transmittal Form.xls