Ministry of Road Transport & Highways

The document outlines the financial details for the construction of a four-lane road from Bhadohi to Varanasi, covering a length of 40.085 km. It includes a breakdown of costs for various components such as road works, structures, and utility shifting, totaling an estimated project cost of approximately ₹965.90 crores. Additionally, it provides per kilometer costs for civil works, construction, and overall project expenses.

Uploaded by

astollexpert
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views3 pages

Ministry of Road Transport & Highways

The document outlines the financial details for the construction of a four-lane road from Bhadohi to Varanasi, covering a length of 40.085 km. It includes a breakdown of costs for various components such as road works, structures, and utility shifting, totaling an estimated project cost of approximately ₹965.90 crores. Additionally, it provides per kilometer costs for civil works, construction, and overall project expenses.

Uploaded by

astollexpert
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Ministry of Road Transport & Highways

Four Lane of Bhadohi to Varanasi Ring Road PKG-2 from 49+200


to 89+285 (40.085 km)
Four Lane Length= 40.085 Kms.
SUMMARY PKG-2
DPR DPR Amount
Amount(CTSB/C (Conventional
Sr. No. Description
TB Layer) Method)
(in Crores) (in Crores)
(1) Road Works
Chapte
SITE CLEARANCE 2.62 2.62
r-2
Chapte
EARTH WORK 22.42 20.82
r-3
Chapte
SUB-BASES COURSE 56.91 41.48
r-4
Chapte
BASE COURSE 50.37 42.65
r-4
Chapte PAVMENT (FLEXIBLE) 1
62.91
r-5 25.29
195.2
Cost of Road Works 232.86
3

(2) Cost of Structures


a. Culverts 8.85 8.85
b. MNB 16.53 16.53
c. ROB 16.60 16.60
- -
Chapte REINFORCED EARTH
10.71 10.71
r-7 WALL
TRAFFIC SIGNS,
Chapte
MARKINGS & OTHER 16.63 16.63
r-8
ROAD APPURTENANCES
RCC DRAIN PROTECTION
(3) 45.37 45.40
WORKS
Miscellaneous Item(New
(4) 18.76 18.77
Jersy Crash Barrier &
Bus Shelter etc.)
(5) Toll Plaza 10.92 10.92
(6) One Time Maintanence 12.76 12.76
352.3
A' Cost of Civil Works 390.03
6
Cost of Utility Shifting 15.63 15.63
Civil Cost including 367.9
A 405.66
Utility 9
12% GST Civil Works on 44.1
B 48.68
A 6
412.1
C Total A + B 454.34
5
Contingencies - 1.0% of
D 3.68 4.06
A
Maintanance for 5 year
(0.5%+0.5%+0.5%+1%)
E 9.87 10.92
@2.5% on A and @ 12%
GST on A
Escalation on 'A' @ 5%
F 19.73 21.84
and 12% GST on A(5%)
Construction
G Supervision Charges on 10.57 11.70
A @ 3%
Agency charge on 'A' @
H 10.57 11.70
3%
Grand Total 466.5
I 514.56
(C+D+E+F+G+H) 7
Approx Cost of Land
K 444.77 444.77
Acquisition
Approx Cost of Forest
L 5.00
5.00
Clearance
Approx Cost of
M Environment 0.65
0.65
Mitigation
Supervision @5% for
Shifting of Electrical
N 0.92
0.92
and Water utilites on
B+GST @ 18%
917.9
O Total Project Cost 965.90
1
Per Km cost of civil 8.7
works(A'/Length) 9 9.73
Per Km Construction 11.6
Cost(I/Length) 4 12.84
Per Km Project 22.9
Cost(O/Length) 0 24.10