1.The WBS can be used for which of the followings?
A) Communicating with the customers
B) Showing calendar dates for each task
C) Showing the functional manager for each team member
D) Showing the business need for the project
3. The process of creating a WBS results in
A) A project schedule
B) Team buy-in
C) A project completion date
D) A list of risks
4. Which of the following DOES NOT describe how far each element in WBS should be broken
Down
A) Can be completed in under 80 hours.
B) Can not be logically subdivided further
C) Is done by one person
D) Can be realistically estimated
6. The first step in WBS creation is
A) Determine cost and duration of each project deliverable
B) Identify major deliverables of the project
C) Identify components of each deliverable of the project
D) Determine the key tasks to be performed
7. Work package is a
A) Element at the lowest level of WBS
B) Task with unique identifier
C) Required level of reporting
D) Task that can be assigned to only one person
8. Going from Level 3 to Level 4 in the work breakdown structure can result in:
A) Less estimating accuracy
B) Better control of the project
C) Lower status reporting costs
D) A greater likelihood that something will fall through the cracks
9. The key reason to use a WBS is to
A) Organize the work
B) Prevent work from slipping through the cracks
C) Provide a basis for estimating the project
D) All of the above
10. In which phase feasibility studies performed
A) Initiation
B) Planning
C) Executing
D) Closing
ANSWERS
1. A
3. B
4. C
6. A
7. A
8. B
9. D
10. B