0% found this document useful (0 votes)
31 views1 page

Cea 5

Uploaded by

krunal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views1 page

Cea 5

Uploaded by

krunal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

(4) The requester and user shall cooperate with the Regional Power Committee, and

Appropriate Load Despatch Centres in respect of the matters listed below, but not
limited to :—

(a) protection coordination and settings of its protective relays accordingly;

(b) agree to maintain meters and communication system in its jurisdiction in


good condition;

(c) participate in contingency operations such as load shedding, increasing or


reducing generation, islanding, black start, providing start-up power and
restoration as per the procedure decided by the Appropriate Load Despatch
Centre;

(d) furnish data as required by Appropriate Transmission Utility or Transmission


Licensee, Appropriate Load Despatch Centre, Appropriate Regional Power
Committee, and any committee constituted bythe Authority at appropriate
Government for system studies or for facilitating analysis of tripping
ordisturbance in power system;

(e) carryout modifications in his equipment With respect to short circuit level,
protection coordination and other technical reasons considered necessary
due to operational requirements;

(f) abide by the coordinated outage plan of the State and region in respect of
generating units and transmission lines as approved by the Regional Power
Committee: and

(g) cooperate with the Regional Power Committee for tuning of Power System
Stabilizer provided in the excitation system of the generating unit.

(5) The requester and user shall make arrangements for integration of the controls and
tele-metering features of his system into the Automatic Generation Control,
Automatic Load Shedding, Special Protection System, Energy Management
Systems and Supervisory Control and Data Acquisition System of the respective
state or region.

(6) For inter-connection studies the requester shall make a request for connection in
the planning stage to the Appropriate Transmission Utility. In case a requester is
seeking inter-connection to a distribution system such a request will be made to the
distribution licensee. The Appropriate Transmission Utility or distribution licensee
shall carry out the inter connection study to determine the point of inter-connection,
required inter-connection facilities and modifications required on the existing grids,
if any, to accommodate the interconnection. The study may also address the
transmission system capability, transient stability, voltage stability, losses, voltage
regulation, harmonics, voltage flicker, electromagnetic transients, machine
dynamics, ferro resonance, metering requirements, protective relaying, sub-station
grounding and fault duties, as the case may be.
A 8
[ Provided that in order to carry out the said study, the requester shall present the
mathematical model of the equipment in accordance with the requirements as
stipulated by the Appropriate Transmission Utility or distribution licensee, as the
A
case may be.]

8
Inserted a proviso at the end of the sub-regulation (6) of regulation 6, vide First amendment (A), 2013