Demolition Rates and Fees Overview

Uploaded by

CC Cost Advisory
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
968 views16 pages

Demolition Rates and Fees Overview

Uploaded by

CC Cost Advisory
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Portal RATOL & Rates PreMo

CAWANGAN KONTRAK DAN UKUR BAHAN 04.12.2023

Work Item Unit Overall Average (RM)


DEMOLITION WORKS AND SITE CLEARANCE Nr Location Range (RM) Average (RM) RM 2000.00
Timber buildings
F 2000.00 - 2000.00 2000.00
Single storey
Plan area :
exceeding 200m2
DEMOLITION WORKS AND SITE CLEARANCE ha. Location Range (RM) Average (RM) RM 4792.50
DEMOLITION WORKS AND SITE CLEARANCE
B 2500.00 - 3000.00 2750.00
SITE CLEARANCE
Upgrading of existing road C 2500.00 - 5000.00 3500.00
General site clearance E 2360.00 - 6000.00 3720.00
F 8400.00 - 10000.00 9200.00
DEMOLITION WORKS AND SITE CLEARANCE ha. Location Range (RM) Average (RM) RM 5000.00
DEMOLITION WORKS AND SITE CLEARANCE
F 5000.00 - 5000.00 5000.00
SITE CLEARANCE
Construction of new road
Forest Reserve
DEMOLITION WORKS AND SITE CLEARANCE Nr Location Range (RM) Average (RM) RM 4650.00
Brickwork buildings
E 5500.00 - 5500.00 5500.00
Single storey
Plan area : F 2000.00 - 5400.00 3800.00
exceeding 200m2
DEMOLITION WORKS AND SITE CLEARANCE ha. Location Range (RM) Average (RM) RM 4720.00
DEMOLITION WORKS AND SITE CLEARANCE
E 2940.00 - 2940.00 2940.00
SITE CLEARANCE
Construction of new road F 3000.00 - 10000.00 6500.00
Swampy Land
DEMOLITION WORKS AND SITE CLEARANCE ha. Location Range (RM) Average (RM) RM 4774.44
DEMOLITION WORKS AND SITE CLEARANCE
C 2500.00 - 5000.00 3750.00
SITE CLEARANCE
Construction of new road E 2520.00 - 10200.00 5573.33
Bushes F 3000.00 - 9000.00 5000.00
DEMOLITION WORKS AND SITE CLEARANCE m Location Range (RM) Average (RM) RM 100.00
DEMOLITION AND REMOVAL FROM SITE OF ALL
BUILDINGS AND EXISTING STRUCTURES

1 / 16
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 04.12.2023

Work Item Unit Overall Average (RM)


Other Structures F 100.00 - 100.00 100.00
Pipe Culverts
900 x 900mm
DEMOLITION WORKS AND SITE CLEARANCE ha Location Range (RM) Average (RM) RM 7972.00
DEMOLITION WORKS AND SITE CLEARANCE
E 4016.00 - 13000.00 7972.00
SITE CLEARANCE
Site Clearance
General clearance to plantation
DEMOLITION WORKS AND SITE CLEARANCE Nr Location Range (RM) Average (RM) RM 3750.00
Brickwork buildings
E 5500.00 - 5500.00 5500.00
Single storey
Plan area : F 2000.00 - 2000.00 2000.00
100 - 200m2
DEMOLITION WORKS AND SITE CLEARANCE Nr Location Range (RM) Average (RM) RM 5000.00
Timber buildings
E 5000.00 - 5000.00 5000.00
Double storey
Plan area :
100 - 200m2
DEMOLITION WORKS AND SITE CLEARANCE ha Location Range (RM) Average (RM) RM 7958.33
DEMOLITION WORKS AND SITE CLEARANCE
C 3500.00 - 3500.00 3500.00
SITE CLEARANCE
Site Clearance F 2300.00 - 30000.00 12416.67
General clearance for primary forest/bushes/paddy
plantation. Rate include the removal of trees and
stump, undergrowth, shrubs, roots and the likes. (All
trees of 0.5 m girth and above shall become the
property of the government.)
DEMOLITION WORKS AND SITE CLEARANCE Nr Location Range (RM) Average (RM) RM 6500.00
Timber buildings
E 9000.00 - 9000.00 9000.00
Double storey
Plan area : F 4000.00 - 4000.00 4000.00
exceeding 200m2
DEMOLITION WORKS AND SITE CLEARANCE Nr Location Range (RM) Average (RM) RM 7500.00
Brickwork buildings
Double storey

2 / 16
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 04.12.2023

Work Item Unit Overall Average (RM)


Plan area : F 7500.00 - 7500.00 7500.00
exceeding
DEMOLITION WORKS AND SITE CLEARANCE ha. Location Range (RM) Average (RM) RM 4453.33
DEMOLITION WORKS AND SITE CLEARANCE
C 2500.00 - 2500.00 2500.00
SITE CLEARANCE
Construction of new road E 4860.00 - 4860.00 4860.00
Plantation F 2000.00 - 10000.00 6000.00
DEMOLITION WORKS AND SITE CLEARANCE Nr Location Range (RM) Average (RM) RM 7500.00
Concrete buildings
E 7500.00 - 7500.00 7500.00
Double storey
Plan area :
exceeding 200m2
DEMOLITION WORKS AND SITE CLEARANCE Nr Location Range (RM) Average (RM) RM 3000.00
Concrete buildings
E 3000.00 - 3000.00 3000.00
Double storey
Plan area :
100 - 200m2
DEMOLITION WORKS AND SITE CLEARANCE nr Location Range (RM) Average (RM) RM 477.50
DEMOLITION WORKS AND SITE CLEARANCE
A 430.00 - 525.00 477.50
TREES
Trees
Trees of girth : 1m to not exc 2m
DEMOLITION WORKS AND SITE CLEARANCE nr Location Range (RM) Average (RM) RM 185.00
Site Clearance
C 185.00 - 185.00 185.00
TREE
Felling of trees shall br deemed to include uprooting
and removal of stump. (All trees of 0.5 m girth and
above shall become the property of the goverment).
(Holes after the removal of stumps shall be filled with
granular material)
Trees of girth: 0.5 m to not exc 1m
DEMOLITION WORKS AND SITE CLEARANCE ha Location Range (RM) Average (RM) RM 10381.00
DEMOLITION WORKS AND SITE CLEARANCE
GENERAL CLEARANCE
Water Bodies

3 / 16
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 04.12.2023

Work Item Unit Overall Average (RM)


At water bodies A 3675.00 - 13835.00 10381.00
DEMOLITION WORKS AND SITE CLEARANCE no Location Range (RM) Average (RM) RM 135.00
DEMOLITION AND REMOVAL FROM SITE OF ALL
F 135.00 - 135.00 135.00
BUILDINGS AND EXISTING STRUCTURES
Other Structures
Sign Board
Sign Board
DEMOLITION WORKS AND SITE CLEARANCE nr Location Range (RM) Average (RM) RM 300.00
Site Clearance
C 300.00 - 300.00 300.00
TREE
Felling of trees shall br deemed to include uprooting
and removal of stump. (All trees of 0.5 m girth and
above shall become the property of the goverment).
(Holes after the removal of stumps shall be filled with
granular material)
Trees of girth: exc 1 m not exc 2m
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 10000.00
DEMOLITION WORKS AND SITE CLEARANCE
B 10000.00 - 10000.00 10000.00
DISMANTLE AND SEND TO STORE FOR REUSE AS
DIRECTED BY S.O/P.D*
Metal
Above ground - 30m long x 2.10m fences. The fences
shall become the property of the Government and shall
be delivered to the store at JKR Manjung
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 1350.00
DEMOLITION WORKS AND SITE CLEARANCE
A 1200.00 - 1500.00 1350.00
DISMANTLE AND SEND TO STORE FOR REUSE AS
DIRECTED BY S.O/P.D*
Metal
Above Ground - 200m long x 2m railing shall become
the property of the Government and shall be delivered
to the store as per S.O instruction
DEMOLITION WORKS AND SITE CLEARANCE m Location Range (RM) Average (RM) RM 7.00
DEMOLITION WORKS AND SITE CLEARANCE
DISMANTLE AND SEND TO STORE FOR REUSE AS

4 / 16
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 04.12.2023

Work Item Unit Overall Average (RM)


DIRECTED BY S.O/P.D* C 7.00 - 7.00 7.00
Dismantle and send to store
Surface lined drains (irrespective of size)
DEMOLITION WORKS AND SITE CLEARANCE nr Location Range (RM) Average (RM) RM 185.00
Site Clearance
C 185.00 - 185.00 185.00
TREE
Relocating of trees to new location as per S.O/P.D
instruction
Trees of girth: 0.5 m to not exc 1 m.
DEMOLITION WORKS AND SITE CLEARANCE nr Location Range (RM) Average (RM) RM 85.00
DEMOLITION AND REMOVAL FROM SITE OF ALL
F 70.00 - 100.00 85.00
BUILDINGS AND EXISTING STRUCTURES
Other Structures
Inlet/Outlet
Inlet / outlet structures
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 17705.57
DEMOLITION AND REMOVAL FROM SITE OF ALL
A 15000.00 - 20000.00 17705.57
BUILDINGS AND EXISTING STRUCTURES
Other Structures
Concrete
Above ground - existing bridge
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 32297.93
DEMOLITION AND REMOVAL FROM SITE OF ALL
D 20000.00 - 91533.40 45283.35
BUILDINGS AND EXISTING STRUCTURES
Other Structures F 10000.00 - 40000.00 19312.50
Concrete
Below ground - 1m below bridges substructure
including abutments, headwall, wingwall, approach
slab and foundation
DEMOLITION WORKS AND SITE CLEARANCE nr Location Range (RM) Average (RM) RM 70.00
Other Structures
F 70.00 - 70.00 70.00
Sump
RC Sump
exceeding 1200mm x 1200mm
DEMOLITION WORKS AND SITE CLEARANCE nr Location Range (RM) Average (RM) RM 150.00

5 / 16
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 04.12.2023

Work Item Unit Overall Average (RM)


Other Structures F 150.00 - 150.00 150.00
Sump
RC Sump
Sump 1500 x 1500mm
DEMOLITION WORKS AND SITE CLEARANCE m2 Location Range (RM) Average (RM) RM 708.33
Bridge
C 350.00 - 500.00 416.67
Reinforced Concrete
Reinforced Concrete F 1000.00 - 1000.00 1000.00
Bridges .....m length x .....m width
DEMOLITION WORKS AND SITE CLEARANCE m Location Range (RM) Average (RM) RM 20.00
DEMOLITION AND REMOVAL FROM SITE OF ALL
F 10.00 - 30.00 20.00
BUILDINGS AND EXISTING STRUCTURES
Other Structures
Guardrails
Guardrails
DEMOLITION WORKS AND SITE CLEARANCE m Location Range (RM) Average (RM) RM 100.00
DEMOLITION AND REMOVAL FROM SITE OF ALL
F 100.00 - 100.00 100.00
BUILDINGS AND EXISTING STRUCTURES
Other Structures
Pipe Culverts
900mm diameter
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 4756.33
DEMOLITION AND REMOVAL FROM SITE OF ALL
E 2747.00 - 6000.00 4756.33
BUILDINGS AND EXISTING STRUCTURES
Other Structures
Concrete
Below ground - Precast concrete culverts including
headwall, wingwall, and foundation min 15 m long x
1.5 m diameter
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 5510.00
DEMOLITION AND REMOVAL FROM SITE OF ALL
E 5020.00 - 6000.00 5510.00
BUILDINGS AND EXISTING STRUCTURES
Other Structures
Fencing & Gate
Metal : Above ground - min 1 m height fences and
gates

6 / 16
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 04.12.2023

Work Item Unit Overall Average (RM)


DEMOLITION WORKS AND SITE CLEARANCE m Location Range (RM) Average (RM) RM 77.00
DEMOLITION AND REMOVAL FROM SITE OF ALL
F 54.00 - 100.00 77.00
BUILDINGS AND EXISTING STRUCTURES
Other Structures
Pipe Culverts
600mm diameter
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 5000.00
DEMOLITION AND REMOVAL FROM SITE OF ALL
F 5000.00 - 5000.00 5000.00
BUILDINGS AND EXISTING STRUCTURES
Other Structures
Concrete
Above ground - Wash trough, structure, existing drain,
fencing & column, project signboard
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 4600.00
DEMOLITION AND REMOVAL FROM SITE OF ALL
A 3000.00 - 5000.00 4600.00
BUILDINGS AND EXISTING STRUCTURES
Other Structures
Concrete
Above Ground - existing road kerb 150m long x 0.5m
wide x 0.5m height as shown in drawing or as per S.O
instruction
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 16358.61
DEMOLITION AND REMOVAL FROM SITE OF ALL
A 6150.00 - 30000.00 16358.61
BUILDINGS AND EXISTING STRUCTURES
Other Structures
Concrete
Below ground - Substructure of existing bridge
including abutments, headwall, approach slab and
foundation with 2m deep.
DEMOLITION WORKS AND SITE CLEARANCE m Location Range (RM) Average (RM) RM 108.00
DEMOLITION AND REMOVAL FROM SITE OF ALL
F 108.00 - 108.00 108.00
BUILDINGS AND EXISTING STRUCTURES
Other Structures
Pipe Culverts
1200mm diameter

7 / 16
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 04.12.2023

Work Item Unit Overall Average (RM)


DEMOLITION WORKS AND SITE CLEARANCE m Location Range (RM) Average (RM) RM 53.60
DEMOLITION AND REMOVAL FROM SITE OF ALL
A 64.40 - 64.40 64.40
BUILDINGS AND EXISTING STRUCTURES
Other Structures C 50.00 - 50.00 50.00
Fencing & Gate E 12.00 - 100.00 56.00
Fences and Gates
F 7.00 - 100.00 44.00
DEMOLITION WORKS AND SITE CLEARANCE m Location Range (RM) Average (RM) RM 24.00
DEMOLITION AND REMOVAL FROM SITE OF ALL
C 20.00 - 40.00 30.00
BUILDINGS AND EXISTING STRUCTURES
Other Structures F 7.00 - 30.00 18.00
Drain
Surface lined drains (irrespective of size)
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 53920.00
DEMOLITION AND REMOVAL FROM SITE OF ALL
D 20000.00 - 91000.00 53920.00
BUILDINGS AND EXISTING STRUCTURES
Other Structures
Concrete
Above ground - 6.5m long x 8.5m wide bridges
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 29173.33
DEMOLITION AND REMOVAL FROM SITE OF ALL
F 11040.00 - 49000.00 29173.33
BUILDINGS AND EXISTING STRUCTURES
Other Structures
Concrete
Above ground - 6.19m long x 8.5m wide bridges
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 6600.00
DEMOLITION AND REMOVAL FROM SITE OF ALL
A 5000.00 - 10000.00 6600.00
BUILDINGS AND EXISTING STRUCTURES
Other Structures
Concrete
Below Ground - existing drainage 150m long x 1.5m
wide x 2m deep including all drain, wall and foundation
as shown in drawing or as per S.O instruction
DEMOLITION WORKS AND SITE CLEARANCE no Location Range (RM) Average (RM) RM 30000.00
Other Structures
Bridge

8 / 16
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 04.12.2023

Work Item Unit Overall Average (RM)


Others structure F 30000.00 - 30000.00 30000.00
Existing bridge abutment and disposal of debris to
contractor own resource
DEMOLITION WORKS AND SITE CLEARANCE m Location Range (RM) Average (RM) RM 7.00
DEMOLITION AND REMOVAL FROM SITE OF ALL
F 7.00 - 7.00 7.00
BUILDINGS AND EXISTING STRUCTURES
Other Structures
Pipe Culverts
Pipe Culverts less than 1000mm diameter Box culvert
..... x ..... mm
DEMOLITION WORKS AND SITE CLEARANCE ha Location Range (RM) Average (RM) RM 6033.00
DEMOLITION AND REMOVAL FROM SITE OF ALL
E 4016.00 - 8050.00 6033.00
BUILDINGS AND EXISTING STRUCTURES
Other Structures
Water Bodies
At water bodies; in or at swampy land including objects
either floating, submerged, or at the bed.
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 5000.00
DEMOLITION AND REMOVAL FROM SITE OF ALL
F 5000.00 - 5000.00 5000.00
BUILDINGS AND EXISTING STRUCTURES
Other Structures
Metal
Above ground - 100 m long existing fences
DEMOLITION WORKS AND SITE CLEARANCE nr Location Range (RM) Average (RM) RM 5850.00
DEMOLITION AND REMOVAL FROM SITE OF ALL
A 5850.00 - 5850.00 5850.00
BUILDINGS AND EXISTING STRUCTURES
Other Structures
Bus Stop
Bus stop (irrespective size)
DEMOLITION WORKS AND SITE CLEARANCE m2 Location Range (RM) Average (RM) RM 14.00
DEMOLITION AND REMOVAL FROM SITE OF ALL
F 14.00 - 14.00 14.00
BUILDINGS AND EXISTING STRUCTURES
Other Structures
Pavement
Removal of flexible surface include scarifying the
existing exposed surfaces.

9 / 16
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 04.12.2023

Work Item Unit Overall Average (RM)


DEMOLITION WORKS AND SITE CLEARANCE nr Location Range (RM) Average (RM) RM 1000.00
DEMOLITION WORKS AND SITE CLEARANCE
F 1000.00 - 1000.00 1000.00
DISMANTLE AND SEND TO STORE FOR REUSE AS
DIRECTED BY S.O/P.D*
Dismantle and send to store
Bus stop
DEMOLITION WORKS AND SITE CLEARANCE m Location Range (RM) Average (RM) RM 80.00
DEMOLITION WORKS AND SITE CLEARANCE
E 80.00 - 80.00 80.00
DISMANTLE AND SEND TO STORE FOR REUSE AS
DIRECTED BY S.O/P.D*
Dismantle and send to store
Fences and Gates
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 7616.67
DEMOLITION WORKS AND SITE CLEARANCE
F 1500.00 - 20000.00 7616.67
DISMANTLE AND SEND TO STORE FOR REUSE AS
DIRECTED BY S.O/P.D*
Metal
above ground - (2m x 10m long guardrails) ditto
DEMOLITION WORKS AND SITE CLEARANCE m Location Range (RM) Average (RM) RM 30.00
DEMOLITION WORKS AND SITE CLEARANCE
C 30.00 - 30.00 30.00
DISMANTLE AND SEND TO STORE FOR REUSE AS
DIRECTED BY S.O/P.D*
Dismantle and send to store
Guardrails
DEMOLITION WORKS AND SITE CLEARANCE ha Location Range (RM) Average (RM) RM 7538.85
DEMOLITION WORKS AND SITE CLEARANCE
A 5000.00 - 13835.00 9327.69
GENERAL CLEARANCE
Above Ground B 5000.00 - 6500.00 5750.00
General clearance
DEMOLITION WORKS AND SITE CLEARANCE nr Location Range (RM) Average (RM) RM 1500.00
DEMOLITION WORKS AND SITE CLEARANCE
C 1500.00 - 1500.00 1500.00
DISMANTLE AND SEND TO STORE FOR REUSE AS
DIRECTED BY S.O/P.D*
Dismantle and send to store
Sign Board

10 / 16
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 04.12.2023

Work Item Unit Overall Average (RM)


DEMOLITION WORKS AND SITE CLEARANCE ha Location Range (RM) Average (RM) RM 4301.11
DEMOLITION WORKS AND SITE CLEARANCE
D 2500.00 - 3960.00 3153.33
GENERAL CLEARANCE
Below Ground E 4500.00 - 5000.00 4750.00
At water bodies; in or at swampy land including objects F 5000.00 - 5000.00 5000.00
either floating, submerged, or at the bed.
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 26500.00
DEMOLITION WORKS AND SITE CLEARANCE
F 26500.00 - 26500.00 26500.00
DISMANTLE AND SEND TO STORE FOR REUSE AS
DIRECTED BY S.O/P.D*
Metal
Above ground - 500 m long guardrails (guardrails shall
become the property of the employer and shall
delivered to the store at JKR ...)
DEMOLITION WORKS AND SITE CLEARANCE ha Location Range (RM) Average (RM) RM 3300.00
DEMOLITION WORKS AND SITE CLEARANCE
F 3300.00 - 3300.00 3300.00
GENERAL CLEARANCE
Above Ground
General clearance for plantation estate.
DEMOLITION WORKS AND SITE CLEARANCE ha Location Range (RM) Average (RM) RM 3908.22
DEMOLITION WORKS AND SITE CLEARANCE
A 2625.00 - 5265.00 3796.67
GENERAL CLEARANCE
Above Ground D 2475.00 - 8649.91 4231.23
General clearance for primary forest/bushes/paddy E 4000.00 - 5000.00 4605.00
plantation. Rate to include the removal of trees and
stumps, undergrowth, shrubs, roots, and the likes. [All F 3000.00 - 3000.00 3000.00
trees of 0.5m girth and above shall become the
property of the Government].
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 8296.43
DEMOLITION WORKS AND SITE CLEARANCE
A 3075.00 - 10000.00 8296.43
DISMANTLE AND SEND TO STORE FOR REUSE AS
DIRECTED BY S.O/P.D*
Metal
Above ground - The signboard shall become the
property of the Government and shall be delivered to
the store

11 / 16
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 04.12.2023

Work Item Unit Overall Average (RM)


DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 3879.00
DEMOLITION WORKS AND SITE CLEARANCE
E 2008.00 - 5750.00 3879.00
DISMANTLE AND SEND TO STORE FOR REUSE AS
DIRECTED BY S.O/P.D*
Dismantle and send to store
Dismantle and reinstall - MS Railing, Guardrails, Road
Signages and Signboard shall become the property of
the government and shall be delivered to JKR's store.
DEMOLITION WORKS AND SITE CLEARANCE nr Location Range (RM) Average (RM) RM 322.67
DEMOLITION WORKS AND SITE CLEARANCE
A 100.00 - 936.00 322.67
TREES
Trees
Trees of girth : 0.50m to not exc 1m
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 6493.21
DEMOLITION WORKS AND SITE CLEARANCE
A 3075.00 - 10000.00 6493.21
DISMANTLE AND SEND TO STORE FOR REUSE AS
DIRECTED BY S.O/P.D*
Metal
Above ground - The guardrails shall become the
property of the Government and shall be delivered to
the store
DEMOLITION WORKS AND SITE CLEARANCE nr Location Range (RM) Average (RM) RM 312.50
TREES
A 200.00 - 400.00 312.50
Trees
Relocate of trees to new location as per S.O/P>D
instruction
Trees of girth : 0.50m to not exc 1m
DEMOLITION WORKS AND SITE CLEARANCE nos Location Range (RM) Average (RM) RM 2076.42
DEMOLITION WORKS AND SITE CLEARANCE
D 1830.67 - 2475.00 2076.42
DISMANTLE AND SEND TO STORE FOR REUSE AS
DIRECTED BY S.O/P.D*
Beam
Above ground ? Precast Pretensioned I - Beam shall
be dismantle, become the property of the Government
and shall be delivered to the store at Jabatan Kerja
Raya Daerah Kota Tinggi or instructed by S.O.

12 / 16
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 04.12.2023

Work Item Unit Overall Average (RM)


DEMOLITION WORKS AND SITE CLEARANCE nr Location Range (RM) Average (RM) RM 300.00
Site Clearance
C 300.00 - 300.00 300.00
TREE
Relocating of trees to new location as per S.O/P.D
instruction
Trees of girth: exc 1 m to not exc 2 m
DEMOLITION WORKS AND SITE CLEARANCE ha. Location Range (RM) Average (RM) RM 4931.03
DEMOLITION WORKS AND SITE CLEARANCE
B 9000.00 - 9000.00 9000.00
SITE CLEARANCE
Site Clearance C 2459.75 - 2459.75 2459.75
General site clearance F 2000.00 - 6000.00 3333.33
DEMOLITION WORKS AND SITE CLEARANCE Nr Location Range (RM) Average (RM) RM 2500.00
Concrete buildings
E 3600.00 - 3600.00 3600.00
Single storey
Plan area : F 1400.00 - 1400.00 1400.00
less than 100m2
DEMOLITION WORKS AND SITE CLEARANCE m2 Location Range (RM) Average (RM) RM 2.00
DEMOLITION WORKS AND SITE CLEARANCE
A 2.00 - 2.00 2.00
SITE CLEARANCE
Site Clearance
General clearance
DEMOLITION WORKS AND SITE CLEARANCE ha. Location Range (RM) Average (RM) RM 3500.00
DEMOLITION WORKS AND SITE CLEARANCE
E 3500.00 - 3500.00 3500.00
SITE CLEARANCE
Site Clearance
Clearing and grubbing within the Site of all trees,
bushes, etc.
DEMOLITION WORKS AND SITE CLEARANCE Nr Location Range (RM) Average (RM) RM 6811.11
Brickwork buildings
A 11700.00 - 11700.00 11700.00
Single storey
Plan area : E 5500.00 - 5500.00 5500.00
less than 100m2 F 2000.00 - 5000.00 3233.33
DEMOLITION WORKS AND SITE CLEARANCE Nr Location Range (RM) Average (RM) RM 2800.00
Timber buildings

13 / 16
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 04.12.2023

Work Item Unit Overall Average (RM)


Single storey F 2000.00 - 3600.00 2800.00
Plan area :
100 - 200m2
DEMOLITION WORKS AND SITE CLEARANCE Nr Location Range (RM) Average (RM) RM 3000.00
Timber buildings
C 3000.00 - 5000.00 4500.00
Single storey
Plan area : F 700.00 - 2000.00 1500.00
less than 100m2
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 7012.00
Buildings
E 6024.00 - 8000.00 7012.00
Timber buildings
Single storey
Group of buildings; 5 units of single storey chalet with
gross built-up area of 100 m² each
DEMOLITION WORKS AND SITE CLEARANCE nr Location Range (RM) Average (RM) RM 1320.00
DEMOLITION AND REMOVAL FROM SITE OF ALL
E 1320.00 - 1320.00 1320.00
BUILDINGS AND EXISTING STRUCTURES
Buildings
Timber buildings
Plan area : less than 100m2
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 5000.00
Buildings
F 5000.00 - 5000.00 5000.00
Brickwork and mansory
Individual building
less than 100m2 (1 unit)
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 15468.94
Concrete buildings
A 6030.00 - 43500.00 15468.94
Single storey
Plan area :
exceeding 200 m2 (1 Nos)
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 25375.00
Concrete buildings
B 25000.00 - 25750.00 25375.00
Single storey
Plan area :
100 - 200 m2 (1 No)

14 / 16
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 04.12.2023

Work Item Unit Overall Average (RM)


DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 3206.25
Buildings
A 2000.00 - 6150.00 3206.25
Timber buildings
Single storey
Individual Building - less than 100m2 (2 Nos)
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 23583.33
Concrete buildings
B 20000.00 - 25750.00 23583.33
Single storey
Plan area :
excluding 200 m2 (1 No.)
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 10000.00
DEMOLITION WORKS AND SITE CLEARANCE
B 10000.00 - 10000.00 10000.00
DISMANTLE AND SEND TO STORE FOR REUSE AS
DIRECTED BY S.O/P.D*
Metal
Above ground - 10m long x 2.10m gates. The gates
shall become the property of the Government and shall
be delivered to the store at JKR Manjung
DEMOLITION WORKS AND SITE CLEARANCE sum Location Range (RM) Average (RM) RM 10000.00
DEMOLITION WORKS AND SITE CLEARANCE
B 10000.00 - 10000.00 10000.00
DISMANTLE AND SEND TO STORE FOR REUSE AS
DIRECTED BY S.O/P.D*
Metal
Above ground - 30m long x 2.10m signboard. The
signboard shall become the property of the
Government and shall be delivered to the store at JKR
Manjung

15 / 16
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 04.12.2023

Nota Catatan
Sekiranya anda mempunyai sebarang pertanyaan, sila hubungi:
Ketua Penolong Pengarah Kanan
Bahagian Perolehan dan Khidmat Kos
Cawangan Kontrak dan Ukur Bahan
Ibu Pejabat JKR Malaysia
Tingkat 19, Menara Tun Ismail Mohamed Ali
No 25, Jalan Raja Laut
50582 Kuala Lumpur

u.p: En Husnan Husin


Tel: 03-26161111
Email: husnan@[Link]