ETP
ETP
6.00mt. W I D E R O A D 6.00mt. W I D E R O A D ID
discrepancy between the two must be brought to the notice
of the Architect before commencement of work.
3. All dimensions must be read and not measured. Please
E refer to detailed drawings wherever relevant.
Y1 Y2 Y3 Y4 Y5
R
X1
1A 1B 1C 1D
Y1 Y2 Y3 Y4 Y5
O
1 A
X2
1H
4A
1G 1F 1E X1 2A 2B
X1 X2
3B
D
3A
2 Y2
X1 X2 X3
X2
3 Y7
6A 6B
Y1
Y3 3D 3C
X3
2D 2C
6C 6D
4 Y6
Y2
4E 4B
4D Y5
6F 6E
5B 6
LEGEND FOR TANK NAME
Y1 Y4
5A
CO-ORDINATE FOR BUILDING Y4
POINT NO. POSITION-X POSITION-Y
1A 700457.020 2461003.061
1. BAR SCREEN CHAMBER
4.5mt. W I D E R O A D
4.5mt. W I D E R O A D
1B 700463.470 2461003.061
X1 X2
4C X3
2. FAT REMOVAL UNIT
1C 700464.337 2461003.061
5
Y3
1F 700464.337 2461000.811 Y2
5B 700497.665 2460987.376 Y1
8a4 8a5 8a2
Y1
8b4 8b5 8b2 15. AERATION TANK
5C 700497.665 2460967.952 8a3 X5 X5 8b3
16. MBR TANK WITH ACCESSORIES
Y1 Y1
7a4 7a5 7a2 9G 9C 9O 9K 7b4 7b5 7b2
5D 700470.815 2460967.952 X1 9H 9D 9P 9L X1
X4 X4
6A 700508.496 2460996.654
6B 700513.996 2460996.654 8a 8b 17. SECONDARY CLARIFIER TANK
6C 700513.996 2460993.004
X3 X3
18. DISINFECTION TANK FILTER FEED TANK &
6D 700516.336 2460993.004
6E 700516.336 2460990.254 X2 X2 TREATED WATER TANK
6F 700513.996 2460990.254
19. SLUDGE DRYING BEDS- 1 TO 6
MB
7a3 7b3
6G 700513.996 2460974.254 X1 X1
9F 9E 9N
6H 700508.496 2460974.254 X1 9M X1
sign Plan
Y2
ge
8a2 700475.111 2460958.916 14A 14BY3
m en t P v t
14B 700461.462 2460932.755 11a3 11b3
8a3 700473.911 2460957.716
14C 700461.462 2460925.305 15A
De
8a4 700472.711 2460958.916
14
.L t
14D 700456.262 2460925.305
P
Y1
HC d.
8a5 700473.911 2460958.922 X1 X1
13D 13C
15A 700484.261 2460930.805
8b1 700494.569 2460960.116 Y4