0% found this document useful (0 votes)
51 views1 page

ETP

Uploaded by

boby14175
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views1 page

ETP

Uploaded by

boby14175
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Notes:

1. This drawing and its contents are the property of HCP


Design, Planning and Management Pvt. Ltd. It is not to be
reproduced, copied, loaned, exhibited or used, in whole or in
7.5 part, except for the purpose it is intended for, without prior

0m written consent from HCP.


2. In case there is any discrepancy between the Architectural
t.W
drawings and other representational drawings, the
Architectural drawings must be followed and any

6.00mt. W I D E R O A D 6.00mt. W I D E R O A D ID
discrepancy between the two must be brought to the notice
of the Architect before commencement of work.
3. All dimensions must be read and not measured. Please
E refer to detailed drawings wherever relevant.
Y1 Y2 Y3 Y4 Y5
R
X1
1A 1B 1C 1D
Y1 Y2 Y3 Y4 Y5
O
1 A
X2
1H
4A
1G 1F 1E X1 2A 2B
X1 X2
3B
D
3A
2 Y2

X1 X2 X3
X2
3 Y7
6A 6B

Y1
Y3 3D 3C
X3
2D 2C
6C 6D
4 Y6

Y2
4E 4B
4D Y5
6F 6E

5B 6
LEGEND FOR TANK NAME
Y1 Y4
5A
CO-ORDINATE FOR BUILDING Y4
POINT NO. POSITION-X POSITION-Y
1A 700457.020 2461003.061
1. BAR SCREEN CHAMBER

4.5mt. W I D E R O A D

4.5mt. W I D E R O A D
1B 700463.470 2461003.061
X1 X2
4C X3
2. FAT REMOVAL UNIT
1C 700464.337 2461003.061
5
Y3

1D 700466.587 2461003.061 3. FAT COLLECTION TANK


1E 700466.587 2461000.811
4. RAW EFFLUENT COLLECTION TANK
Y3

1F 700464.337 2461000.811 Y2

1G 700463.470 2461000.811 5. EQUALIZATION TANK - 01 & 02


1H 700457.020 2461000.811
2A 700475.714 2461000.021 Y2 6. MCC ,CHEMICAL STORE & LABORATORY
7. ANAEROBIC DIGESTER
Y1
2B 700492.814 2461000.021 6H 6G
2C 700492.814 2460994.471
2D 700475.714 2460994.471 8. DEGASSER
3A 700495.839 2460998.871
3B 700499.089 2460998.871
9. SLUDGE THICKENER EQUIPMENT
3C 700499.089 2460995.621 Y1
5D 5C
10. MECHNIZED SLUDGE DE-WATERING ROOM
3D 700495.839 2460995.621 7a1 7b1
4A 700458.761 2460999.016
X1 X2 X3 X4 X5 X6 X7
11. ANOXIC TANK
KEY PLAN
4B
4C
700466.436 2460991.341
700458.761 2460983.666
12. FLARE STACK
4D 700451.086 2460991.341 13. AIR BLOWERS
7b
Y1 Y2 Y3 Y4 Y1 Y2 Y3 Y4
4E 700458.761 2460991.355 7a 8a1 9A 9B 9 9I 9J 8b1
14. SLUDGE COLLECTION TANK
5A 700470.815 2460987.376 X6 X6

5B 700497.665 2460987.376 Y1
8a4 8a5 8a2
Y1
8b4 8b5 8b2 15. AERATION TANK
5C 700497.665 2460967.952 8a3 X5 X5 8b3
16. MBR TANK WITH ACCESSORIES
Y1 Y1
7a4 7a5 7a2 9G 9C 9O 9K 7b4 7b5 7b2
5D 700470.815 2460967.952 X1 9H 9D 9P 9L X1
X4 X4
6A 700508.496 2460996.654
6B 700513.996 2460996.654 8a 8b 17. SECONDARY CLARIFIER TANK
6C 700513.996 2460993.004
X3 X3
18. DISINFECTION TANK FILTER FEED TANK &
6D 700516.336 2460993.004
6E 700516.336 2460990.254 X2 X2 TREATED WATER TANK
6F 700513.996 2460990.254
19. SLUDGE DRYING BEDS- 1 TO 6
MB

7a3 7b3
6G 700513.996 2460974.254 X1 X1

9F 9E 9N
6H 700508.496 2460974.254 X1 9M X1

7a1 700460.160 2460966.005


7a2
7a3
700468.860 2460957.305
700460.160 2460948.605
3.5mt. W I D E R O A D PROPOSED TERRACE LVL. +197.00
7a4 700451.460 2460957.305 Y3 Y2 Y1 12A 12B
10A 10B 12E
7a5 700460.160 2460957.305 X2
11a1
Y1
12 11b1 PLOT BOUNDARY LINE N
7b1 700508.361 2460966.005 12C
12D
7b2 700517.061 2460957.305 10 X1
X1 X2 W E
7b3 700508.361 2460948.605 11a 11b 13A
Y3
13B
S
7b4 700499.661 2460957.305 Y1 Y1 NORTH
CO-ORDINATE FOR BUILDING 11a4 11a5 11a2 11b4 11b5 11b2
7b5 700508.361 2460957.305 X1

POINT NO. POSITION-X POSITION-Y 10D 10C


13 g & Mana
UP

8a1 700473.911 2460960.116 nin


14A 700456.262 2460932.755

sign Plan
Y2

ge
8a2 700475.111 2460958.916 14A 14BY3

m en t P v t
14B 700461.462 2460932.755 11a3 11b3
8a3 700473.911 2460957.716
14C 700461.462 2460925.305 15A

De
8a4 700472.711 2460958.916
14
.L t
14D 700456.262 2460925.305
P
Y1
HC d.
8a5 700473.911 2460958.922 X1 X1
13D 13C
15A 700484.261 2460930.805
8b1 700494.569 2460960.116 Y4

8b2 700495.769 2460958.916


15B 700496.236 2460918.830 Y2
Y1 Y2 Y3 FOR EXECUTION
15C 700484.261 2460906.855 16A 16B
8b3 700494.569 2460957.716
15D 700472.286 2460918.830 Y1
X1
04-06-2025
8b4 700493.369 2460958.916 14D
8b5 700494.569 2460958.916
15E 700484.261 2460918.830
X1a
X1
X1b X1c
14C
X2 Y3
16
16A 700501.864 2460926.015 17HY3
9A 700477.320 2460960.454 17G X2
16D 16C
16B 700511.464 2460926.015
9B 700481.220 2460960.454
16C 700511.464 2460922.715 17I Y2 18A 18B
9C 700481.220 2460956.672 17F
Y2 Y3
16D 700501.864 2460922.715
9D 700481.676 2460956.672 17A Y1 15B
17A 700457.861 2460918.626 15D 15E
9E 700481.676 2460947.522
9F 700476.864 2460947.522
17B 700464.261 2460912.226 20
9G 700476.864 2460956.672
17C 700457.861 2460905.826 18
17D 700451.461 2460912.226
9H 700477.320 2460956.672
17E 700457.860 2460912.225
9I 700487.309 2460960.454
17F 700454.486 2460920.149 17D
15 Y2

9J 700491.209 2460960.454 17E 17B


Y1

17G 700454.486 2460922.399


9K 700491.209 2460956.672
17H 700458.986 2460922.399
9L 700491.665 2460956.672
17I 700458.986 2460920.149 17
9M 700491.665 2460947.522
9N 700486.853 2460947.522
18A 700501.529 2460920.138 21 E01 04-06-2025 REVISED AS PER MARKED
18B 700511.729 2460920.138
9O 700486.853 2460956.672 15C E00 17-04-2025 FOR EXECUTION.
18C 700511.729 2460905.638 17C
Y1
18C
9P 700487.309 2460956.672 18D REF. DATE DESCRIPTION
18D 700501.529 2460905.638 X1
10A 700454.319 2460941.221 X1 X1 X2
19A 700443.328 2460897.162 DRAWN BY : VAIBHAV PRAJAPATI
10B 700460.719 2460941.221
19B 700486.708 2460897.162 CHECKED BY : HAITIK MANDAVIYA
10C 700461.019 2460935.521
10D 700454.319 2460935.521
19C
19D
700486.708 2460889.932
700443.328 2460889.932
3.5mt. W I D E R O A D REVIEWED BY :
APPROVED BY:
HARDIK VYAS
11a1 700473.340 2460939.997 CHIRAG BHAVSAR
UP UP UP

11a2 700476.890 2460936.447


11a3 700473.340 2460932.897
19A 19B
Y2 ETP ­ SITE PLAN
11a4 700469.790 2460936.447
ALL BUILDING ­ COORDINATE PLAN
11a5 700473.340 2460936.447
11b1 700495.181 2460939.997 DWG. NO. : 22011­02­00­HCP­DG­2000­E01
11b2 700498.731 2460936.447 19 SCALE: A1­1:250
11b3
11b4
700495.181 2460932.897
700491.631 2460936.447 19C Y1 DATE : 17­04­2025 2000
19D
11b5 700495.181 2460936.447 PROJECT NAME :
12A 700482.368 2460942.270 X1 X2 X3 X4 X5 X6 X7

12B 700486.368 2460942.270


AMULFED DAIRY ­ II
MASTER SITE PLAN
12C 700486.368 2460939.670
12D 700482.368 2460939.670 CLIENT :
12E 700485.068 2460940.970 AMULFED
13A 700508.012 2460937.714
13B 700514.112 2460937.714 AT : RAJKOT PROJECT NO. 22011
13C 700514.112 2460929.614
13D 700508.012 2460929.614
HCP
[Link]

You might also like