0% found this document useful (0 votes)
56 views11 pages

BOCH Car Battery Lifespan Analysis

Manager Martin Joseph has $15,000 allocated to increase productivity and is considering two projects. The first project is a maintenance program that will increase production by 1,550,000 units at a cost of $12,000. The second project is a new piece of equipment that can increase production by 2,310,000, 1,650,000, or 980,000 units depending on the level of integration, at a cost of $14,000. The manager must decide which project will maximize production within the budget.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views11 pages

BOCH Car Battery Lifespan Analysis

Manager Martin Joseph has $15,000 allocated to increase productivity and is considering two projects. The first project is a maintenance program that will increase production by 1,550,000 units at a cost of $12,000. The second project is a new piece of equipment that can increase production by 2,310,000, 1,650,000, or 980,000 units depending on the level of integration, at a cost of $14,000. The manager must decide which project will maximize production within the budget.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

The useful life of BOCH car batteries is approximately two years, the duration time

está normalmente distribuido con una media de 730 días y una desviación estándar de 100 días.
In order to establish guarantee policies, it is desired to know:
What is the probability that a battery lasts between 710 and 760 days?
Interpret the result found.
What is the probability that a battery lasts less than 700 days?
What is the probability that a battery lasts between 600 and 1,000 days?
If the company were able to reduce the standard deviation to 50 days without affecting the useful life of the
probabilidad de que una batería dure menos de 700 días? ¿Cuántos días de garanta recomendaría otorgar?
The useful life of BOCH car batteries is approximately two years, the duration time
is normally distributed with a mean of 730 days and a standard deviation of 100 days.
In order to establish guarantee policies, it is desired to know:
What is the probability that a battery lasts between 710 and 760 days?
Interpret the result found.
SOLUTION
What is the probability that a battery lasts less than 700 days?
What is the probability that a battery lasts between 600 and 1,000 days?
Estadístco de prueba:
If the company were able to reduce the standard deviation to 50 days without affecting the useful life of the
probability
Data: that a battery lasts less than 700 days? How many days of warranty would you recommend granting?
The useful life of BOCH car batteries is approximately two years, the duration time.
= 730 with
It is normally distributed poundsa mean Mean
of 730of theand
days distribution
a standard deviation of 100 days.
= order to establish guarantee
In 710 days policies,
Observation value to know:
it is desired =( ̅
=What is the probability that
100 daysa battery lasts between 710 and 760 days?
Standard deviation of the distribution
Interpret the result found.
z =What
-0.2is the probability that a battery lasts less than 700 days?
Probabilidad0.4207
What is the probability that a battery lasts between 600 and 1,000 days?
If the company were able to reduce the standard deviation to 50 days without affecting the useful life of the
probabilidad de que una batería dure menos de 700 días? ¿Cuántos días de garanta recomendaría otorgar?
Therefore: The probability that a battery lasts between 710 and 760 days is 0.4207
P(710 days < battery duration < 760 days) = 0.4207
Just as the mean divides the curve into two identical halves: 0.5 for each side:
So: the probability that a battery lasts less than 700 days:
= 730 pounds Mean of the distribution
= 700 days Observation value
= 100 days Standard deviation of the distribution
z= -0.3
Probability 0.3821 38.21%
<700 days 0.1179 11.79% lasts less than 700 days.
Between 600 and 1000 days
= 730 pounds Media de la distribución
= 600 days Observation value
= 100 days Standard deviation of the distribution
z= -1.3
Probability 0.0968 9.68%
the estimate of these batteries

the batteries which is the


?
the estimation of these batteries is

the batteries, what is the


? Formulas Menos de 700 días:
the estimation of these batteries is
= 730 pounds Mean of the distribution
̅ )/ = 700 days Value of observation
= 50 days Standard deviation of the distribution
z= -0.6
Probability 0.2743 27.43%
the batteries, which is the <700 days 0.2257 22.57% lasts less than 700 days
?
with a standard deviation

Considering the data, it is recommended to grant a warranty of 100 days.


solution

as
fifty-day deadline.
Una tienda local de bicicletas que es especializada en modelos livianos de carreras, estaba experimentando
unusual number of complaints about lightning breakage in a specific model. Because of this, the owner
recent and conducted a test with them. As it was a destructive test, I did not want to use a sample dem
According to the manufacturer's specifications, the average tensile strength of the lightning must be in m
a known standard deviation of 20 pounds.
If the owner discovered that the tensile strength is 190 pounds per ray, should he return the shipment?
established a producer risk of 0.05 since the supplier would not accept more than 5% in rejections
What is the minimum average traction in the sample for the owner to retain the lightning shipment?

SOLUTION
a)
Null Hypothesis: The average tensile strength of the lightning is equal to 200 lb. Hoµ = 200
Alternative hypothesis: The average tensile strength of lightning is NOT equal to 200 lb. H1µ ≠ 200

b)
Probability of committing Type I Error:

We know that: α = P[Reject H0 | H0 is true]


Therefore: Significance α = 0.05

c)
Decision rule:
Nivel de confianza= 95%
alfa = 5%
alpha/2 = 2.5%
- from critco -1.960
+ z critco 1.960

Reject H0if: z ≥ 1.96 or z ≤ -1.96


Accept H0if: -1.96 < z < 1.96

d)
Test statistic:
Data:
µ0= 200lb Average considered by the null hypothesis.
= 190lb Media de la muestra tomada.
= 20lb Standard deviation of the sample.
n= 64rays Number of sampled elements.
_ = 2.500 Standardized deviation
z= -4.000 Test statistic value

Determine if the statistic falls within the region defined by the null hypothesis, which is true:
Conclusion: As the value of Z falls outside the acceptance region of H0then the hypothesis is rejected
Therefore: The store owner must return the shipment of bicycle merchandise, because the
Therefore, the manager has reason with a significance level of 5%.
what seemed to be a
he took out 64 rays from the shipment
too big. From
less than 200 pounds, with

or accept the shipment? It


of good goods.
?

0 lb Bilateral
0 lb

ACCEPTANCE ZONE of H0
REJECTION ZONE of H0 1-α REJECTION ZONE of H0

α/2 alpha/2

-z(α/2) = -1.960 H0: µ0= 200 1.960 = z(α/2)

Formulas

=
/√

A = (B̅C_0)/
( ∕√ )=( ̅ _
0)/ _

null hypothesis is rejected and the alternative hypothesis is accepted.

the tensile strength of the lightning is lower than expected.


Martn Joseph, un gerente de planta,tene $ 15,000 asignados en su presupuesto para aument
considering one of two projects submitted for approval. The first project is a
which, according to the engineering manager, will increase production by 1,550,000 units per year.
This accelerated program will ensure that the parts are repaired or replaced before they are.
costly 'idle time' (time when the machine is not operating). The manager of
new accessory piece of equipment that will increase production depending on how well it is
The plan manager decided that three levels of integration can be given: good, just
production of 2,310,000 units, 1,640,000 units, and 978,000 units, respectively.
accessory in similar plants reveals that the probabilities of good, fair integrations
Respectively. What alternative would you recommend to the plant manager?
Martin Joseph, a plant manager, has $15,000 allocated in his budget for an increase.
is considering one of two projects submitted for its approval. The first project is
accelerated that, according to the engineering manager, will increase production by 1,550,000 units
This expedited program will ensure that the parts are repaired or replaced before they are due.
costly "downtime" (time when the machine is not working). The manager of
Data:
new accessory piece of equipment that will increase production depending on how well it
The plansample
[Link]. manager decided that three levels of integration can be given: good, just
probability
production at 2,310,000 units, 1,640,000 units, and 978,000 units, respectively.
1640000 0.5 820000 Just level
accessory in similar plants reveals that the probabilities of good, fair integrations
978000
respectively. 0.3 293400
What alternative would you recommend toPoor the plant manager?level
2310000 0.2 462000 Good level
Artin Joseph, a plant manager, has $15,000 allocated in his budget for an increase.
considering one of two projects submitted for approval. The first project is a
which, according toUse
Recommendation: the the
engineering manager, will
good integration increase
level, production
because it will by 1,550,000
generate units unity
greater per year.
of p
This expedited program will ensure that the parts are repaired or replaced before they are given.
costly "downtime" (time when the machine is not functioning). The manager of
nueva pieza accesoria de equipo que aumentará la producción dependiendo de qué tan bien se
The plan manager decided that three levels of integration can be provided: good, just
production of 2,310,000 units, 1,640,000 units and 978,000 units, respectively.
accessory in similar plants reveals that the chances of good, fair integrations
respectively. What alternative would you recommend to the plant manager?
improve productivity. Currently, he is
accelerated maintenance schedule

Therefore, it will be avoided


and production, on the other hand, proposes an
the unit can be integrated with the equipment
the poor; those who would increase the
A more detailed analysis of the use of this
good and bad are 0.2, 0.5 and 0.3

enter productivity. Currently, he


It is a maintenance schedule.
per year.
burnout. Therefore, burnout will be avoided.
and production, on the other hand, proposes a
The unit can be integrated with the equipment.
the poor; those who would increase the
A more detailed analysis of the use of this
3280000
good ones are 0.2, 0.5 and 0.3
3260000
11550000
the productivity. Currently, he is
accelerated maintenance schedule
production
spending. Therefore, it will be avoided the
And production, on the other hand, proposes a
The unit can be integrated with the equipment.
the rich and the poor; those who would increase the
A more detailed analysis of the use of this
and bad ones are 0.2, 0.5, and 0.3
DATA:
E-BOOK FORMAT BOOKS
sample 100 The variability is given by:
Sample proportion 40
Level of confidence 98% 100% alpha 2%
Respuesta a:
p = 0.4 Preference for new books in e-book format.
q = 0.6

Response b:
z 2.33
error 12.1%

Minimum 39,879 students


Maximum 40,121 students

It means:

l The recommendation
E-BOOK FORMAT BOOKS
67% sample 100 The variability
Sample proportion 40
Level of confidence 95% 100% alpha 5%
Response to:
p = 0.4 Preference for new books and
q = 0.6

Response b:
z 1.96
error 12.1%

Minimum 39.879 alumnos


Maximum 40,121 students

It means:

The shift is to change to the use of books in e-book format.


is given by: 67%

in e-book format.

You might also like