0% found this document useful (0 votes)
37 views7 pages

PSP TEMPLATES - Example

This document contains templates for recording the progress of a software development project. Template 1 summarizes the project plan including estimated vs actual times and percentages completed by phase. Template 2 records the time spent by phase. Template 3 documents defects introduced, fixed, and the time dedicated to each fix.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views7 pages

PSP TEMPLATES - Example

This document contains templates for recording the progress of a software development project. Template 1 summarizes the project plan including estimated vs actual times and percentages completed by phase. Template 2 records the time spent by phase. Template 3 documents defects introduced, fixed, and the time dedicated to each fix.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PSP templates

TEMPLATE 1:
Summary of the PSP0 Project Plan
Estudiante: Miriam Cruz Castillo Date: 06/02/2017
Program: Quadratic Equation Program #: 00001
Instructor: Is Miguel Martínez Valle Language: Turbo C

Time in phase (min) Plan Real To date As of today


Planning 5 5 4.27
Design 30 30 25.64
Coding 32 32
Compilation 15 15
Tests 5 5
Postmortem 30 30
Total 180 117 117 100

Defectos Introducidos Real To date As of today


Planning 0 0 0
Design 2 2 28.57
Coding 5 2 28.57
Compilation 0 0 0
Tests 0 0 0
Total development 7 7 100

Eliminated Defects Real To date As of the date


Planning 0 0 0
Design 0 0 0
Coding 0 0 0
Compilation 6 6
Tests 1 1 14.28
Total development 7 7 100
After development 0 0

Page 1 of 7
PSP templates
TEMPLATE 2:
Time Log Book
Student: Miriam Cruz Castillo Date: 06/02/2017
Program: Quadratic equation Program #: 00001
Instructor: Is Miguel Martínez Valle Language: Turbo C

Project Phase Date of Time Date of Delta Time Comentarios


Start and time Interruption end and time (Effective time)
Computational Planning System 16/01/2017 10 min 16/01/2017 29 min It was proposed what the registration module is going to do.

Point of Sale Control 09:16 hours 09:55 hours to carry out.


… Design 17/01/2017 5 min 17/01/2017 30 min The registration module was designed,
10:00 horas 10:35 horas establishing what it was going to contain and its
structure.
Coding 18/01/2017 1160 min 20/01/2017 2000 min The registration module is scheduled.
08:00 hours 11:20 horas
Compilation 01/23/2017 0 min January 23, 2017 02 min The registration module is compiled.
11:20 horas 11:22 horas
Encoding 24/01/2017 50 min 24/01/2017 115 min The registration module is scheduled.
15:15 horas 18:00 horas
Compilation 01/26/2017 0 min 26/01/2017 05 min Se termina de compilar el módulo de altas.
09:00 horas 09:05 horas
Tests 30/01/2017 2700 minutes 02/02/2017 2160 min The tests were conducted by introducing
08:00 hours 17:00 horas true data and false data.

Page 2 of 7
PSP Templates

TEMPLATE 3:
Defect Logbook

Types of defects
10Documentation60Verification
20Syntax 70Data
30 Construction Function
40Assignment 90System
50Interface 100Environment

Student: Miriam Cruz Castillo Date: 06/02/2017


Program: Quadratic equation Program #: 00001
Instructor: IS Miguel Martínez Valle Language: Turbo C

Time of Defect
Project Date Number Type Introduced Deleted Correction what
(min) resolve
System 23/01/2017 0001 40 Design Compilation 55 X
Computational of
Point Control
sale ...
Descripción: There were duplicate fields in the database tables.

Time of Defect
Project Date Number Type Introduced Deleted Correction what
(min) solve
System 23/01/2017 0002 20 Coding Compilation 10 X
Computational of
Point Control
sale...
Descripción: Syntax error.

Page 3 of 7
PSP Templates

Time of Defect
Project Date Number Type Introduced Deleted Correction what
(min) solve
System 23/01/2017 0003 40 Encoding Compilation 05 0001
Computational of
Point Control of
sale ...
Description: Error in the field names of the database.

Time of Defect
Project Date Number Type Introduced Deleted Correction what
(min) solve
System January 2, 2017 0004 80 Coding Tests 31 X
Computational of
Point Control
sale ...
Description: The loop did not end with a negative exponent, it forgot to change the sign in the subtraction.

Time of Defect
Project Date Number Type Introduced Deleted Correction what
(min) solve
System 01/02/2017 0005 40 Design Compilation 350 0001
Computational of
Point Control
sale
Description: Defect on the right side of the binary operator, the integer must be treated as a float.

Page 4 of 7
PSP templates

Defect Types Standard

TYPE NAME OF THE TYPE DESCRIPTION


10 Documentation Comentarios, mensajes, etc.
20 Syntax Spelling, punctuation, types, instruction formats, etc.
30 Construction Change management, library, version control, etc.
40 Assignment Declarations, duplicate names, scope, limits, etc.
50 Interface Calls to procedures and references, I/O, user formats, etc.
60 Check Error messages, inadequate controls, etc.
70 Data Structure, content, etc.
80 Function Logics, pointers, loops, recursion, computation, etc.
90 System Settings, calendar, memory, etc.
100 Environment Design, compilation, testing, or other support issues.

Page 5 of 7
PSP Templates

Error analysis

Introduced Deleted Omitted


Type
Design Encode Others Review Compile Tests Under review
10
20 1 1 0
30
40 2 1 3 0
50
60
70
80 1 1 0
90
100
Totals of
2 3 4 1
Program

Page 6 of 7
PSP templates

Defect Data

Program number Defects (D) LOC

00001 05 950

Total to date 05 950

Page 7 of 7

You might also like