Security Level: Internal
Single Site Verification
Alex
[Link]
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Agenda
• Introduction
• SSV Audit
• SSV DT Test
• SSV Report
• SSV Trouble shooting
Introduction
➢Single Site On-Air Mode
Cluster Accept
Project Nomin Detail Project
SSV ance
Start al Plan End
Optimi Report
Plan
zation
➢Cluster On-Air Mode
70% 90%
Accept
Project Nomin Detail Cluster Cluster Project
ance
Start al Plan End
Report
Plan Optimi Optimi
zation zation
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 3
Work flow
SSV is to solve
• Basic Functions
• Coverage
• Rx Quality
• Interference
• Abnormal Events
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
St aP ag
SSV Tools
• M2000
• LMT&MML
• Probe & Assistant
• TEMS & MapInfo
• NASTAR
• U-Net
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 5
Agenda
• Introduction
• SSV Audit
• SSV DT Test
• SSV Report
• SSV Trouble shooting
SSV Audit
• From BSS Part
▪ Single Site Test Record from BSS engineer
▪ Site Activated
▪ All Cell/TRX/Channels Un-locked
▪ Idle Timeslot Test is closed
▪ No Alarm may influence SSV Test
• From Data Configuration
▪ Engineer Parameter Audit
▪ Neighbor Setting Audit
▪ Optimization Parameter
Audit
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 7
Agenda
• Introduction
• SSV Audit
• SSV DT Test
• SSV Report
• SSV Trouble shooting
SSV DT Overview
• Establish DT Methodology
▪ Tool Setup: Tool, Digital Map, FTP Server, APN, SIM
▪ Test Method: Idle, Long Call, Short Call, PS
▪ Special requirement: Locking BCCH or not.
▪ DT Route Planning
▪ SSV Report Template
• Carry out SSV DT
▪ Before DT Test
▪ During DT Test
▪ After DT Test
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 9
SSV DT Methodology(0)
• Special Requirement
▪ Indoor Test or Outdoor Test
▪ Locking BCCH or not
▪ Forbid HO or not
▪ …
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 10
SSV DT Methodology(1)
• Test Method
▪ Idle
□ RxLev Full on BCCH, Cell
Reselection, Cell Identity
▪ Long Call
□ RxLev, RxQual, TA on dedicated
mode
□ Retainability(Call drop,
Handover)
▪ Short Call
□ RxLev, RxQual, TA on dedicated
mode
□ Accessibility(CSSR, Call Drop,
Handover)
▪ PS
□ GPRS/EDGE function
□ Throughput of APP Layer
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 11
SSV DT Methodology(2)
• SSV DT Route
▪ Principles for Test route for SSV be defined together with
customer
▪ The test routes should cover all sectors of each sites, main
road and important areas
A
A
C
B A
C
A B
C
B
C
B
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 12
SSV DT Methodology(3)
• A proposed DT Route Definition Principle
Suburban/Highway Site Urban
Site:
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 13
SSV DT Methodology(4)
• PS Test
▪ The setting of Mobile: APN
▪ SIM card information
▪ Selecting Test Item according to Customer Requirement
□ Attach/Detach
□ PDP
□ WAP/ HTTP
□ FTP
□ MMS
▪ FTP Server
▪ Download/ Upload file size
□ CQT: DL S 500 KB / UL: 100KB
□ DT: DL 100KB / UL: 20KB
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 14
Carry out SSV DT
• Before DT Test
▪ Driver test system connection
▪ Positions of the Test MS and Antenna
▪ Import: digital map, engineering table and test route
▪ GPS plot.
▪ Communicate with driver: driving route and speed.
▪ The log-files should not be too long, preferably less than 20 minute.
▪ The log-files should be named properly.
• During DT test
▪ Monitor the DT real results: Call setup, HO, Call drop, RxLev, RxQual, C/I
▪ Analyze as much as possible. Ask driver to stop when abnormal
▪ Pay attention to: bad quality, possible interfering sites, and topography and
site locations
▪ Correct small problems discovered immediately
• After DT Test
▪ DT log files and DT problem records.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 15
Agenda
• Introduction
• SSV Audit
• SSV DT Test
• SSV Report
• SSV Trouble shooting
SSV Report
• SSV report template
Single Site Test
Report Template
▪ What is the usage for CI plot?
▪ What is the usage for BCCH plot?
▪ What is the usage for RxLev plot?
▪ What is the uasge for RxQual
plot?
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 17
Agenda
• Introduction
• SSV Audit
• SSV DT Test
• SSV Report
• SSV Trouble shooting
SSV Trouble Shooting
• Basic Verification
• RxLev Verification
• RxQual Verification
• Event: CSSR, Handover, Call Drop
• GRPSIEDGE
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 19
Basic Verification
• To check basic parameters: LAC,CI,BCCH, BSIC, MA, MAIO
• To check downlink coverage
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 20
RxLev Verification
• Check whether the receive level of the BCCH and TCH
are greater than the predefined threshold and are stable.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 21
RxQual Verification
RxQuality 0 1 2 3 4 5 6 7
Non-FH Good Good Good Good Fair Fair Poor Poor
FH Good Good Good Good Good Fair Poor Poor
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 22
Event-Access Failure
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 23
Event-Call Drop
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 24
Event- Handover
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 25
Thank you
[Link]