Low-cost Wind Turbine
Ecobreezers
Tobia, Marwa, Anchal, Ariana, Lauwkesh, Lizbeth,
Ritvik, Tarek, Aziz, Abu, Syahiran, Ehab
02.07.2024
Low-cost Wind Turbine
Hurricane
Concept:
• Extensive use of Venturi effect and directional walls
• High rotational speed of the blades
• No gear box needed
• Estimated parameters:
• Cut in wind speed: 0.94m/s
• Nominal speed: 5m/s
• Cut out wind speed (theoretical expention with braking system): 12m/s
• Max. output power: 76kW
• Nominal output power: 5.5kW
2 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Chair
Concept:
• Horizontal Axis Wind Turbine supplying electricity to small community (5 houses)
• Hub height: 18m
• Rotor Diameter: 14m
• Estimated parameters:
• Cut in wind speed: 4m/s
• Nominal speed: 7m/s
• Cut out wind speed: 25m/s
• Rated power: 30kW
• Nominal output power: 17,7kW at 7m/s
3 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Eco Breezers
Comparison of concepts
Concept:
• Small Ducted Horizontal-Axis Wind Turbine {Venturi effect : raise the wind speed }
• Material: wood (sustainable & cheap)
• Rotor Diameter : 3m
• Estimated parameters:
• Cut in wind speed: 5m/s
• Rated wind speed: 6m/s
• Cut out wind speed : 3m/s
• Rated output power : 2.26kW (at 6m/s )
• Annual output power: 6339.06 kW/y
4 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Reasons for Choosing Ecobreezers:
• Higher Efficiency: 47% coefficient of performance
• Cost-Effectiveness: Standard components and readily available materials
• Innovative Design: Incorporates Venturi and ducted designs
• Proven Reliability: Sky Stream 3.7 turbine
• Environmental and Community Impact
• Ease of Implementation
5 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Project plan
0 /24 /2 4 9 /24 9 /24 /2 4 9 /24 9 /24 /2 4 8 /24
3/3 4/9 4/1 4/2 5/9 5/1 5/2 6/8 6/1
Procurement plan
Calculation of loads, power, gearbox, venturi
Risk management plan
Sustainanbility analysis
Resource planning
Marketing
CAD drawing
CFD calculations
Quality management plan
BOM
Prototype realisation
Technical report
Technical report review
6 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Design
Components
• Blade: 4 airfoils connected with changing angle of attack
• Rotor Housing: attachment of blades in screw like
mechanism
• Main Housing: 4 small gears rotating around one main gear
or rail circular rail with lubricated balls (similar to a bearing)
for yaw system
• Pressure Tunnel: airfoil shape
• Tower
• Supporting Beam
• Technical drawings
7 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
8 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Technical Analysis
Operating Ranges Aerodynamic Analysis of NACA4415 Airfoil
• Wind speed cut-in = 5 cut-out = 6 • lift = 1.4 kN
• drag = 3.67e^10-3 kN
9 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Technical Analysis
CFD Analysis of the Wind Turbine Blade
Torque (1 blade ) = 26.9697 Nm
10 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
8. Technical Analysis
Rated Output Power Estimated Annual Power Generation
• Power concluded from CFD analysis= 2.26 KW • EAP = 6339.06 kWh/y
11 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Finance
Components:
• Blades: renewable material,
customizable, optimized performance,
but high price
• Tower: aluminum beam, easy
procurement.
• Generator: good low speed generation,
no need for gearbox
• Break system: mechanical, inexpensive
• Yaw system: passive, gears,
uncomplicated
12 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Finance
Components:
• Venturi tube: increase efficiency,
custom-made, high added cost
• Controller: standard
• Storage: 5kW battery, easily accessible,
adds flexibility
• Inverter: standard unit, low cost
• Bearings and bolts: standard grade,
inexpensive
• Nacelle housing: custom-made,
customizable, high cost
13 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Finance
Transportation: ~10% of total costs Marketing:
• Minimize by purchasing multiple • Budget of 450€ for campaign
items from the same vendor
• Optimized delivery schedule Total: 7,790 € per turbine
Maintenance: 1¢ per kWh
Permits:
• Building permit: requires detailed
drawings and schematics of
turbine
• Municipal approval: varies by
customer
14 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Marketing
Marketing Strategies
• Social media, email, traditional marketing Bergey Wind Resource, SD Wind Energy
Windpower LLC
Model Name Excel 15 Skystream 3.7 SD6
Target Audience Price € 12000 € 8500 € 10000
Rated Annual 29 800 3 420 8 950
Energy [kWh/a]
• Clients behavior analysis, market research
Rated Sound 48.5 41.2 43.1
Level
Competitors List [dB]
Rated Power 15.6 2.1 5.2
• Competitors analysis [kW]
Cut-in speed 2.5 3 2.5
Customer Relations [m/s]
Roter diameter 9.6 3.7 5.5
• Definition, targets, strategies & tools, [m]
Marketing Cost: 500 ~ 600 €/month
15 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Material – Laminated Wood
Advantages for choosing laminated wood in turbine blades
When choosing the appropriate material for a wind turbine, the aim:
•Renewable Resource
•Carbon Sequestration
•Biodegradability
•Malleability and Durability
•Noise reduction(Ascoutic damping)
16 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Sustainability Analysis
Environmental, Economic and Social Impact
• Clean Energy Production
[Link] electricity for home power supply without emitting
greenhouse gases.
2. Reducing reliance on fossil fuels and mitigates climate change.
• Cost of energy
Wind power is becoming more cost competitive with traditional
fossil fuels due to reduction in the Levelized Cost of Energy.
• Community Benefits
Wind turbines can provided economical benefits through land lease
payments and tax revenues.
17 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Risk Identification and Management
• Strategic / Business Risk
• Transport / Construction / Completion Risk
• Operation / Maintenance
• Liability / Legal Risk
• Market / Sales Risk
• Counterparty Risk
• Political /Policy / Regulatory Risk s
18 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Risk Avoidance & Mitigation
Risk Avoidance
• Definition: Making decisions to entirely eliminate specific risks associated with the project.
• Objective: Completely eliminate the risk.
• Method: Change plans or procedures to ensure the risk does not occur.
1. Site Selection
2. Design and Material
3. Installation and Maintenance
4. Environment and Regulations
5. Financial funds
6. Community and Aesthetic Aspect
19 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Risk Avoidance & Mitigation
Risk Mitigation
• Definition: Making decisions to reduce the impact or likelihood of risks associated with the project.
• Objective: Reduce the impact or likelihood of the risk but does not eliminate the risk completely.
• Method: Implement measures to manage the risk if it occurs.
How can Risk Mitigation be implemented?
1. Choice of Location
2. Design and Engineering Flaws (Electrical Systems and Quality Budget Considerations)
3. Environmental Consideration and Social Acceptance (Wildlife Protection, Noise Reduction, Aesthetic Considerations, Community Engagement)
4. Compliance with Regulations
5. Liability and Insurance
6. Professional Assistance
7. Regular Maintenance
8. Safety Measures
9. Forecasting Scenarios
20 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Safety & Training Protocol
• General safety guideline
• Training modules
• Emergency procedures
21 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Quality Assurance
Definition
• Process of planning and executing tasks correctly to achieved the desired quality at the end of the construction project.
• Routine inspections and monitoring of critical components like turbine blades, bearings, generators, gearbox and nacelle housing to prevent defects
and ensure optimal efficiency.
Inspection of equipment and materials before installation of the wind turbine
Steps:
1. Pre-Inspection Planning
2. Documentation Review
3. Visual and Physical Inspection
4. Dimensional Verification
5. Material and Functional Testing
6. Documentation, Reporting and Corrective Actions
7. Pre-Installation Verification
22 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Quality Control
Definition
• Ensure that each component and assembly meet the specified standards and performance criteria
• Detects and corrects problems when they occur, unlike Quality Assurance which prevents issues
Importance of Quality Control for Electrical Connections and Turbine Performance
• Ensures electrical connections are secure, properly insulated and free from defects
• Reduces risk of electrical fires and equipment damage
• Verifies that electrical systems operate efficiently, ensuring optimal power output from
turbine
• Regular control and maintenance enhance longevity of turbine
• Reduces need for emergency repairs and unplanned maintenance, thus saving costs
• Prevents wear and tear from escalating into significant damange
23 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Quality Control
Quality Control for Electrical Connections Quality Control for Turbine Performance
1. Visual Inspection
1. Initial Run-Up
2. Continuity Testing
2. Performance Monitoring
3. Grounding Check
3. Vibration Analysis
4. Insulation Resistance Testing
4. Data Logging and Analysis
5. Voltage and Polarity Testing
5. Noise Level Measurement
6. Load Testing
6. Environmental Impact Check
7. Functional Testing
7. Structural Assessment
8. Final Documentation and Reporting
24 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Prototype
Importance of a prototype:
1. Clarifying requirements
2. Early detection of issues
3. Enhancing user involvement
4. Validating design and functionality
25 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Prototype
Steps:
1. Design
i. Catia software
ii. tower, blade, tunnel, etc.
2. 3D print
i. Convert into suitable file format
ii. Scale down with 1:10 ratio
iii. Material: Plastic
Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Prototype
Steps:
3. Assemble, test and troubleshoot
Challenges:
1. Assembly: parts are small
Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben
Low-cost Wind Turbine
Thank you for your kind attention.
If you have any questions, please don’t hesitate.
Your project team
28 Technische Hochschule Ingolstadt | Fußzeile auf Masterfolie eingeben