Column Load Calculations
Column Load Calculations
R/B
1
1
LENGTH
DEAD LOADS
roof
Ceiling
Beam filling
Ring Beam
Walls first flr(230TH)
Walls grnd flr
Slab(Ribbed)
Beam
slab Beam
Grd Beam
Column
Back fill
Pad
Total
0
0
0
0
1
1
1
1
0
1
1
0
0
4.21
4.21
0
8.79
10
10
4.15
10
0
10
5
0
0
4.33
4.33
0.2
0.23
0.23
0.23
3.37
0.23
0
0.23
0.23
0
0
LIVE LOADS
Roof
Floors(Ribbed)
Total
1
1
4.21
4.21
4.33
4.33
0.2
0.4
3
3
20
25
20
20
0.65
0
0.45
0.23
0
0
25
25
25
25
18
24
GRAND TOTAL
Bearing Capacity
180
PAD DESIGN
fy
N/mm2
460.0
fcu
N/mm
mm
mm
kN
earth pressure
d
shear stress
at col face, v c
kN/m
mm
25.0
50
20
634.81
87
-80
N/mm2
#REF!
0.8SQRTfcu
N/mm
critical perimeter
mm
4.0
#REF!
40
mm
kN
N/mm2
2
N/mm
100
635
-198.38
0.360
OK
kN m
1.2
179
Mu
As
minimum A s
kN m
2
mm
67
-5,399
mm
A s provided
mm
Provide
(100As/bd)
Allowable shear stress v c
N/mm
m
kN
N/mm2
2,510
8T20@370cc
-1.162
0.360
OK
1.315
309
-1.43
OK
kN/m
KN
0.6
0.6
4.34
0.25
2
Pad Area
2.48653053
0
0
0
0
138
138
61
37
0
26
7
0
0
407
407
569.183398
5
36
41
65.62548
448
65.6
41
65.62548
634.808878
TIMES
R/B
1
1
LENGTH
DEAD LOADS
roof
Ceiling
Beam filling
Ring Beam
Walls first flr(230TH)
Walls grnd flr
Slab(Ribbed)
Beam
slab Beam
Grd Beam
Column
Back fill
Pad
Total
1
1
0
1
2
1
1
2
0
1
1
0
0
4.15
4.15
0
4.15
13
10
3.56
13
0
10
12
0
0
3.35
3.35
0.2
0.23
0.23
0.23
4.33
0.23
0
0.23
0.23
0
0
LIVE LOADS
Roof
Floors(Ribbed)
Total
1
2
4.15
4.15
3.35
3.35
0.2
0.45
3
3
20
25
20
20
0.6
0
0.3
0.23
0
0
25
25
25
25
18
24
GRAND TOTAL
Bearing Capacity
180
PAD DESIGN
fy
N/mm2
460.0
fcu
N/mm
mm
mm
kN
earth pressure
d
shear stress
at col face, v c
kN/m
mm
25.0
50
20
1,094.05
150
-80
N/mm2
#REF!
0.8SQRTfcu
N/mm
critical perimeter
mm
4.0
#REF!
40
mm
kN
N/mm2
2
N/mm
100
1,094
-341.89
0.360
OK
kN m
1.2
309
Mu
As
minimum A s
kN m
2
mm
67
-9,304
mm
A s provided
mm
Provide
(100As/bd)
Allowable shear stress v c
N/mm
m
kN
N/mm2
2,510
8T20@370cc
-1.162
0.360
OK
1.315
533
-2.47
OK
kN/m
KN
0.6
0.6
4.34
0.25
2
Pad Area
4.29459434
8
8
0
11
359
138
67
90
0
17
16
0
0
714
714
999.5179
3
56
59
94.537
773
94.5
59
94.537
1094.0549
TIMES
R/B
1
1
LENGTH
DEAD LOADS
roof
Ceiling
Beam filling
Ring Beam
Walls first flr(230TH)
Walls grnd flr
Slab(Ribbed)
Beam
slab Beam
Grd Beam
Column
Back fill
Pad
Total
1
1
1
1
4
1
1
4
0
1
1
0
0
2.58
2.58
4.33
7
12
10
2.58
10
0
10
17
0
0
4.33
4.33
0.23
0.23
0.23
0.23
4.33
0.23
0
0.23
0.23
0
0
LIVE LOADS
Roof
Floors(Ribbed)
Total
1
4
2.58
2.58
4.33
4.33
0.35
0.4
3
3
20
25
20
20
0.45
0
0.3
0.23
0
0
25
25
25
25
18
24
GRAND TOTAL
Bearing Capacity
180
PAD DESIGN
fy
N/mm2
460.0
fcu
N/mm
mm
mm
kN
earth pressure
d
shear stress
at col face, v c
kN/m
mm
25.0
50
20
1,587.49
218
-80
N/mm2
#REF!
0.8SQRTfcu
N/mm
critical perimeter
mm
4.0
#REF!
40
mm
kN
N/mm2
2
N/mm
100
1,587
-496.08
0.360
OK
kN m
1.2
448
Mu
As
minimum A s
kN m
2
mm
67
-13,501
mm
A s provided
mm
Provide
(100As/bd)
Allowable shear stress v c
N/mm
m
kN
N/mm2
2,510
8T20@370cc
-1.162
0.360
OK
1.315
773
-3.58
OK
kN/m
KN
0.6
0.6
4.34
0.25
2
Pad Area
6.22643003
7
7
7
16
662
138
48
104
0
17
22
0
0
1029
1029
1440.0307
3
89
92
147.46248
1121
147.5
92
147.46248
1587.49318
TIMES
R/B
1
1
LENGTH
DEAD LOADS
roof
Ceiling
Beam filling
Ring Beam
Walls first flr(230TH)
Walls grnd flr
Slab(Ribbed)
Beam
slab Beam
Grd Beam
Column
Back fill
Pad
Total
1
1
1
1
4
1
1
4
0
1
1
0
0
2.58
2.58
5.72
4
4
4
2.58
4
0
4
17
0
0
3.14
3.14
0.23
0.23
0.23
0.23
3.14
0.23
0
0.23
0.23
0
0
LIVE LOADS
Roof
Floors(Ribbed)
Total
1
4
2.58
2.58
3.14
3.14
0.35
0.4
3
3
20
25
20
20
0.45
0
0.3
0.23
0
0
25
25
25
25
18
24
GRAND TOTAL
Bearing Capacity
180
PAD DESIGN
fy
N/mm2
460.0
fcu
N/mm
mm
mm
kN
earth pressure
d
shear stress
at col face, v c
kN/m
mm
25.0
50
20
681.04
93
-80
N/mm2
#REF!
0.8SQRTfcu
N/mm
critical perimeter
mm
4.0
#REF!
40
mm
kN
N/mm2
2
N/mm
100
681
-212.82
0.360
OK
kN m
1.2
192
Mu
As
minimum A s
kN m
2
mm
67
-5,792
mm
A s provided
mm
Provide
(100As/bd)
Allowable shear stress v c
N/mm
m
kN
N/mm2
2,510
8T20@370cc
-1.162
0.360
OK
1.315
332
-1.54
OK
kN/m
KN
0.6
0.6
4.34
0.25
2
Pad Area
2.64948471
5
5
9
9
221
55
35
41
0
7
22
0
0
410
410
574.101287
2
65
67
106.93584
477
106.9
67
106.93584
681.037127
TIMES
R/B
1
1
LENGTH
DEAD LOADS
roof
Ceiling
Beam filling
Ring Beam
Walls first flr(230TH)
Walls grnd flr
Slab(Ribbed)
Beam
slab Beam
Grd Beam
Column
Back fill
Pad
Total
1
1
1
1
4
1
1
4
0
1
1
0
0
4.21
4.21
4.21
7.3
9.3
9.3
4.21
9.3
0
9.3
17
0
0
2.94
2.94
0.23
0.23
0.23
0.23
2.94
0.23
0
0.23
0.23
0
0
LIVE LOADS
Roof
Floors(Ribbed)
Total
1
4
4.21
4.21
2.94
2.94
0.35
0.4
3
3
20
25
20
20
0.45
0
0.3
0.23
0
0
25
25
25
25
18
24
GRAND TOTAL
Bearing Capacity
180
PAD DESIGN
fy
N/mm2
460.0
fcu
N/mm
mm
mm
kN
earth pressure
d
shear stress
at col face, v c
kN/m
mm
25.0
50
20
1,379.45
189
-80
N/mm2
#REF!
0.8SQRTfcu
N/mm
critical perimeter
mm
4.0
#REF!
40
mm
kN
N/mm2
2
N/mm
100
1,379
-431.07
0.360
OK
kN m
1.2
390
Mu
As
minimum A s
kN m
2
mm
67
-11,731
mm
A s provided
mm
Provide
(100As/bd)
Allowable shear stress v c
N/mm
m
kN
N/mm2
2,510
8T20@370cc
-1.162
0.360
OK
1.315
672
-3.11
OK
kN/m
KN
0.6
0.6
4.34
0.25
2
Pad Area
5.39295803
7
7
7
17
513
128
54
96
0
16
22
0
0
869
869
1216.06645
3
99
102
163.38168
971
163.4
102
163.38168
1379.44813
TIMES
R/B
1
1
LENGTH
DEAD LOADS
roof
Ceiling
Beam filling
Ring Beam
Walls first flr(230TH)
Walls grnd flr
Slab(Ribbed)
Beam
slab Beam
Grd Beam
Column
Back fill
Pad
Total
1
1
1
1
4
1
1
4
0
1
1
0
0
4.21
4.21
4.21
7.4
7.4
7.4
4.21
7.4
0
7.4
17
0
0
3.14
3.14
0.23
0.23
0.23
0.23
3.14
0.23
0
0.23
0.23
0
0
LIVE LOADS
Roof
Floors(Ribbed)
Total
1
4
4.21
4.21
3.14
3.14
0.35
0.4
3
3
20
25
20
20
0.45
0
0.3
0.23
0
0
25
25
25
25
18
24
GRAND TOTAL
Bearing Capacity
180
PAD DESIGN
fy
N/mm2
460.0
fcu
N/mm
mm
mm
kN
earth pressure
d
shear stress
at col face, v c
kN/m
mm
25.0
50
20
1,181.76
162
-80
N/mm2
#REF!
0.8SQRTfcu
N/mm
critical perimeter
mm
4.0
#REF!
40
mm
kN
N/mm2
2
N/mm
100
1,182
-369.29
0.360
OK
kN m
1.2
334
Mu
As
minimum A s
kN m
2
mm
67
-10,050
mm
A s provided
mm
Provide
(100As/bd)
Allowable shear stress v c
N/mm
m
kN
N/mm2
2,510
8T20@370cc
-1.162
0.360
OK
1.315
576
-2.66
OK
kN/m
KN
0.6
0.6
4.34
0.25
2
Pad Area
4.6029507
8
8
7
17
408
102
57
77
0
13
22
0
0
719
719
1007.25951
3
106
109
174.49608
829
174.5
109
174.49608
1181.75559
TIMES
R/B
1
1
LENGTH
DEAD LOADS
roof
Ceiling
Beam filling
Ring Beam
Walls first flr(230TH)
Walls grnd flr
Slab(Ribbed)
Beam
slab Beam
Grd Beam
Column
Back fill
Pad
Total
1
1
0
1
1
1
1
2
0
1
1
0
0
2.78
2.78
3.56
3
10
10
2.78
10
0
10
11
0
0
2.86
2.86
0.23
0.23
0.23
0.23
2.86
0.23
0
0.23
0.23
0
0
LIVE LOADS
Roof
Floors(Ribbed)
Total
1
2
2.78
2.78
2.86
2.86
0.35
0.45
3
3
20
25
20
20
0.45
0
0.3
0.23
0
0
25
25
25
25
18
24
GRAND TOTAL
Bearing Capacity
180
PAD DESIGN
fy
N/mm2
460.0
fcu
N/mm
mm
mm
kN
earth pressure
d
shear stress
at col face, v c
kN/m
mm
25.0
50
20
666.59
91
-80
N/mm2
#REF!
0.8SQRTfcu
N/mm
critical perimeter
mm
4.0
#REF!
40
mm
kN
N/mm2
2
N/mm
100
667
-208.31
0.360
OK
kN m
1.2
188
Mu
As
minimum A s
kN m
2
mm
67
-5,669
mm
A s provided
mm
Provide
(100As/bd)
Allowable shear stress v c
N/mm
m
kN
N/mm2
2,510
8T20@370cc
-1.162
0.360
OK
1.315
325
-1.50
OK
kN/m
KN
0.6
0.6
7.63
0.25
2
Pad Area
2.61836924
5
5
0
8
138
138
61
52
0
17
15
0
0
438
438
612.52179
2
32
34
54.06544
471
54.1
34
54.06544
666.58723
TIMES
R/B
1
1
LENGTH
DEAD LOADS
roof
Ceiling
Beam filling
Ring Beam
Walls first flr(230TH)
Walls grnd flr
Slab(Ribbed)
Beam
slab Beam
Grd Beam
Column
Back fill
Pad
Total
1
1
1
1
4
1
1
4
0
1
1
0
0
2.21
2.21
3.66
4
4
4
2.21
4
0
4
17
0
0
1.45
1.45
0.23
0.23
0.23
0.23
1.45
0.23
0
0.23
0.23
0
0
LIVE LOADS
Roof
Floors(Ribbed)
Total
1
4
2.21
2.21
1.45
1.45
0.35
0.4
3
3
20
25
20
20
0.45
0
0.3
0.23
0
0
25
25
25
25
18
24
GRAND TOTAL
Bearing Capacity
180
PAD DESIGN
fy
N/mm2
460.0
fcu
N/mm
mm
mm
kN
earth pressure
d
shear stress
at col face, v c
kN/m
mm
25.0
50
20
573.78
79
-80
N/mm2
#REF!
0.8SQRTfcu
N/mm
critical perimeter
mm
4.0
#REF!
40
mm
kN
N/mm2
2
N/mm
100
574
-179.30
0.360
OK
kN m
1.2
162
Mu
As
minimum A s
kN m
2
mm
67
-4,880
mm
A s provided
mm
Provide
(100As/bd)
Allowable shear stress v c
N/mm
m
kN
N/mm2
2,510
8T20@370cc
-1.162
0.360
OK
1.315
279
-1.29
OK
kN/m
KN
0.6
0.6
4.34
0.25
2
Pad Area
2.25591753
2
2
6
9
221
55
14
41
0
7
22
0
0
380
380
531.479242
1
26
26
42.2994
406
42.3
26
42.2994
573.778642
TIMES
R/B
1
1
LENGTH
DEAD LOADS
roof
Ceiling
Beam filling
Ring Beam
Walls first flr(230TH)
Walls grnd flr
Slab(Ribbed)
Beam
slab Beam
Grd Beam
Column
Back fill
Pad
Total
1
1
1
1
4
1
1
4
0
1
1
0
0
3.56
3.56
4.2
12
12
12
3.56
12
0
12
17
0
0
4.39
4.39
0.23
0.23
0.23
0.23
4.39
0.23
0
0.23
0.23
0
0
LIVE LOADS
Roof
Floors(Ribbed)
Total
1
4
3.56
3.56
4.39
4.39
0.35
0.4
3
3
20
25
20
20
0.45
0
0.3
0.23
0
0
25
25
25
25
18
24
GRAND TOTAL
Bearing Capacity
180
PAD DESIGN
fy
N/mm2
460.0
fcu
N/mm
mm
mm
kN
earth pressure
d
shear stress
at col face, v c
kN/m
mm
25.0
50
20
1,769.15
243
-80
N/mm2
#REF!
0.8SQRTfcu
N/mm
critical perimeter
mm
4.0
#REF!
40
mm
kN
N/mm2
2
N/mm
100
1,769
-552.85
0.360
OK
kN m
1.2
500
Mu
As
minimum A s
kN m
2
mm
67
-15,046
mm
A s provided
mm
Provide
(100As/bd)
Allowable shear stress v c
N/mm
m
kN
N/mm2
2,510
8T20@370cc
-1.162
0.360
OK
1.315
862
-3.99
OK
kN/m
KN
0.6
0.6
4.34
0.25
2
Pad Area
6.91811187
9
9
7
28
662
166
68
124
0
21
22
0
0
1116
1116
1562.85617
4
125
129
206.29488
1245
206.3
129
206.29488
1769.15105
TIMES
R/B
1
1
LENGTH
DEAD LOADS
roof
Ceiling
Beam filling
Ring Beam
Walls first flr(230TH)
Walls grnd flr
Slab(Ribbed)
Beam
slab Beam
Grd Beam
Column
Back fill
Pad
Total
1
1
1
1
4
1
1
4
0
1
1
0
0
3.1
3.1
6
6
6
6
3.1
6
0
6
17
0
0
1.9
1.9
0.23
0.23
0.23
0.23
1.9
0.23
0
0.23
0.23
0
0
LIVE LOADS
Roof
Floors(Ribbed)
Total
1
4
3.1
3.1
1.9
1.9
0.35
0.4
3
3
20
25
20
20
0.45
0
0.3
0.23
0
0
25
25
25
25
18
24
GRAND TOTAL
Bearing Capacity
180
PAD DESIGN
fy
N/mm2
460.0
fcu
N/mm
mm
mm
kN
earth pressure
d
shear stress
at col face, v c
kN/m
mm
25.0
50
20
868.78
119
-80
N/mm2
#REF!
0.8SQRTfcu
N/mm
critical perimeter
mm
4.0
#REF!
40
mm
kN
N/mm2
2
N/mm
100
869
-271.49
0.360
OK
kN m
1.2
245
Mu
As
minimum A s
kN m
2
mm
67
-7,388
mm
A s provided
mm
Provide
(100As/bd)
Allowable shear stress v c
N/mm
m
kN
N/mm2
2,510
8T20@370cc
-1.162
0.360
OK
1.315
423
-1.96
OK
kN/m
KN
0.6
0.6
4.34
0.25
2
Pad Area
3.40897556
4
4
10
14
331
83
26
62
0
10
22
0
0
565
565
791.03234
1
47
49
77.748
614
77.7
49
77.748
868.78034