Equipment Maintenance Plan: Maintenance Task Description Special Tools/Materials Remarks

This document outlines an equipment maintenance plan for a Dreco SSGD-750-GE Disc Brake System drawworks located on a drill floor. It lists maintenance tasks to be performed at various frequencies, estimated time requirements, required craftsmen, special tools needed, and remarks. Major annual maintenance includes inspecting components, replacing filters, flushing systems, and performing non-destructive testing of structures and components.

Uploaded by

Osagie Alfred
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
89 views

Equipment Maintenance Plan: Maintenance Task Description Special Tools/Materials Remarks

This document outlines an equipment maintenance plan for a Dreco SSGD-750-GE Disc Brake System drawworks located on a drill floor. It lists maintenance tasks to be performed at various frequencies, estimated time requirements, required craftsmen, special tools needed, and remarks. Major annual maintenance includes inspecting components, replacing filters, flushing systems, and performing non-destructive testing of structures and components.

Uploaded by

Osagie Alfred
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

EQUIPMENT MAINTENANCE PLAN

EQUIPMENT NUMBER DESCRIPTION LOCATION DOCUMENTATION VALIDATED

305-2-1 305-2-1

Drawworks, Dreco SSGD-750-GE Disc Brake System FREQUENCY (Days) CRAFTSMEN REQD

Drill Floor Drill Floor


EQUIPMENT CONDITION

General Service Manual Maintenance Manual EST. TIME (Hrs) PROCEDURE / TASK # ANNUAL (Hrs) 0 0 0
0

CRAFT

ITEM #

TYPE

MAINTENANCE TASK DESCRIPTION

SPECIAL TOOLS/MATERIALS REMARKS

01 02 03 04

DAILY SERVICING ROUTINES WEEKLY SERVICING ROUTINES CHECK DISC BRAKE FRICTION PADS, CHECK LUBE OIL PUMPS, CHECK HYDRAULIC OIL PUMPS AND ACCUMULATOR BOTTLES, LUBRICATE TORQUE ARM AND INSPECT WIRE ROPE INSPECT INTEGRITY OF ELECTRICAL COMPONENTS INSPECT LUBE OIL DISTRIBUTION LINES, CHECK GEAR OIL SPRAY NOZZLES, CHECK OPERATION OF HYDRAULIC PUMPS, INSPECT DRAWWORKS DRIVE GEARS, INSPECT THE TORQUE ARMS, OBTAIN LUBE OIL AND HYDRAULIC OIL SAMPLE, REMOVE AND REPLACE LUBE OIL FILTER ELEMENT, REMOVE AND REPLACE HYDRAULIC OIL FILTER ELEMENT , CHECK HIGH SPEED GEAR WOBBLE, , CHECK PINION GEAR INSPECT GEARS, BACKLASH, CHECK PINION GEAR TOOTH CONTACT, INSPECT, DISASSEMBLE AND CLEAN LUBE OIL COOLING PLATE HEAT EXCHANGER, INSPECT PIPING, HOSES, CONNECTIONS AND FOUNDATION FASTENERS, DRAIN AND FLUSH HYDRAULIC POWER UNIT, CHECK BRAKE CALIPER DELAY SYSTEM, CHECK BRAKE DISK CONDITION AND NDE INSPECTION OF FOUNDATION BOLTS VERIFY OPERATION OF ISOLATION BARRIERS, CHECK PRESSURE TRANSMITTERS, TEMPERATURE SWITCHES, LEVEL SWITCHES, DIFFERENTIAL PRESSURE SWITCH, VALVE ON/OFF SOLENOID, HAND OPERATED SWITCH, ENCODER AND DEADLINE ANCHOR PRESSURE TRANSMITTER PERFORM CONDITION EVALUATION OF DRAWWORKS PRIOR TO SPS - TO DETERMINE OVERHAUL REQUIREMENTS PERFORM COMPLETE OVERHAUL AND NDE OF DRAWWORKS ASSEMBLY, REMOVE AND REPLACE HPU AND HYDRAULIC SYSTEM HOSES, REPLACE DRAWWORKS BRAKE CALIPER SPRING PACKS, NDE CALIPER PISTONS, NDE CALIPER MOUNT AND GUIDE BARS, CHECK BRAKE CALIPERS ALIGNMENT, INSPECT DRAWWORKS LUBRICATION SYSTEM, CHECK LUBE OIL PRESSURE RELIEF AND FLOW CONTROL VALVES, AND NDE FOUNDATION BOLTS AND SKID WELDS

1 7 30 90

ENG/RM ENG/RM ENG/RM CE

1 1 1 1

RUNNING SHUTDOWN SHUTDOWN SHUTDOWN

PM PM PM PM

05

180

ENG/RM

SHUTDOWN

PM

06

360

ENG/RM

SHUTDOWN

PM

07

360

CE

SHUTDOWN

PM

08

1800 ENG/RM

SHUTDOWN

PM

09

1800 ENG/RM

SHUTDOWN

PM

ANNUAL SCHEDULED MAINTENANCE HRS ANNUAL SHUTDOWN HRS ANNUAL SENIOR TOOLPUSHER/DRILLING HRS ANNUAL CHIEF ENGINEER/MECHANIC HRS ANNUAL CHIEF ELECTRICIAN HRS ANNUAL 3RD PARTY HRS

0.0 0.0 0.0 0.0 0.0 0.0