This document contains rainfall data from October 2011 to November 2013 for the purpose of calculating an extension of time for a construction project. It includes the number of rainy days with at least 10mm of rain for actual and historical records for each month, as well as the actual and average monthly rainfall totals. An equation is provided to calculate the extension of time for each month based on the difference in rainy days and normalized difference in rainfall totals compared to historical averages. However, when the calculation is done for each month, it results in zero days of extension of time for the entire period.

Uploaded by

William Mutepfa
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
Download as xlsx, pdf, or txt
100% found this document useful (2 votes)
1K views1 page

Extension of Time Calculation

This document contains rainfall data from October 2011 to November 2013 for the purpose of calculating an extension of time for a construction project. It includes the number of rainy days with at least 10mm of rain for actual and historical records for each month, as well as the actual and average monthly rainfall totals. An equation is provided to calculate the extension of time for each month based on the difference in rainy days and normalized difference in rainfall totals compared to historical averages. However, when the calculation is done for each month, it results in zero days of extension of time for the entire period.

Uploaded by

William Mutepfa
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1/ 1

Month

Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12
Apr-12
May-12
Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Nov-12
Dec-12
Jan-13
Feb-13
Mar-13
Apr-13
May-13
Jun-13
Jul-13
Aug-13
Sep-13
Oct-13
Nov-13

Nw
(No.)

Nn
(No.)
1
2
3
4
3
2
0
0
0
0
0
0
1
2
3
4
3
2
0
0
0
0
0
0
1
2

Nw-Nn
(No.)

Rw
(mm)

Rn
(mm)

26.0
64.0
90.7
98.6
83.1
58.9
22.5
7.1
2.4
0.8
0.9
5.7
26.0
64.0
90.7
98.6
83.1
58.9
22.5
7.1
2.4
0.8
0.9
5.7
26.0
64.0
Total Extension of Time

Rw-Rn
(mm)

20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

(Rw-Rn)/X
(mm)

V
(days)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

EOT
(days)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

X=20, Y=10, V=(Nw-Nn)+[(Rw-Rn)/X]


(Refer to the VOLUME III-STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE WORKS(Page1200-7) completed by BOTSWANA ROADS DEPARTMENT)
The symbols have the following meanings:
V Extension of time in calendar days in respect of the calendar month under consideration (If the algebraic sum of V is negative and its absolute value exceeds Nn, then extension of
time shall be taken as equal to minus Nn.)
Nw
Nn
Rw
Rn

Number of days during the calendar month on which a rainfall of Y mm or more as recorded on site
Number of days during the calendar month on which a rainfall of Y mm or more as derived from existing (historical) rainfall records