0% found this document useful (0 votes)
121 views36 pages

PS SD Integration

This document discusses determining the delivery type, item category, and shipping point for a project-based delivery. It specifies the delivery type as OVLK, item category as 0184, shipping point as OVL2, and recommends using strategy "21" for the material sales view and MRP view. It also notes that the item category for the delivery can be checked in transaction VL02N.

Uploaded by

narender9679
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
Download as xlsx, pdf, or txt
0% found this document useful (0 votes)
121 views36 pages

PS SD Integration

This document discusses determining the delivery type, item category, and shipping point for a project-based delivery. It specifies the delivery type as OVLK, item category as 0184, shipping point as OVL2, and recommends using strategy "21" for the material sales view and MRP view. It also notes that the item category for the delivery can be checked in transaction VL02N.

Uploaded by

narender9679
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1/ 36

1

Del Type maintained for Project based del.


OVLK
LP
Del from project

Del Item Category Determination


0184

Define Item category for del.


OVLP

Shiping Point Determination


OVL2

Material sales view & MRP view should have stratergy 21

ratergy 21

We can check Item cate

We can check Item category for del in VL02N

You might also like