Linear programming solution examples
Linear programming example 1997 UG exam
A company makes two products (X and Y) using two machines (A and B). Each unit of X that is produced requires 50 minutes processing time on machine A and 30
minutes processing time on machine B. Each unit of Y that is produced requires 24 minutes processing time on machine A and 33 minutes processing time on machine B.
At the start of the current week there are 30 units of X and 90 units of Y in stock. Available processing time on machine A is forecast to be 40 hours and on machine B is
forecast to be 35 hours.
The demand for X in the current week is forecast to be 75 units and for Y is forecast to be 95 units. Company policy is to maximise the combined sum of the units of X
and the units of Y in stock at the end of the week.
l Formulate the problem of deciding how much of each product to make in the current week as a linear program.
l Solve this linear program graphically.
Solution
Let
l x be the number of units of X produced in the current week
l y be the number of units of Y produced in the current week
then the constraints are:
l 50x + 24y <= 40(60) machine A time
l 30x + 33y <= 35(60) machine B time
l x >= 75 30
l i.e. x >= 45 so production of X >= demand (75) initial stock (30), which ensures we meet demand
l y >= 95 90
l i.e. y >= 5 so production of Y >= demand (95) initial stock (90), which ensures we meet demand
The objective is: maximise (x+3075) + (y+9095) = (x+y50)
i.e. to maximise the number of units left in stock at the end of the week
It is plain from the diagram below that the maximum occurs at the intersection of x=45 and 50x + 24y = 2400
Solving simultaneously, rather than by reading values off the graph, we have that x=45 and y=6.25 with the value of the objective function being 1.25
Solving simultaneously, rather than by reading values off the graph, we have that x=45 and y=6.25 with the value of the objective function being 1.25
Linear programming example 1995 UG exam
The demand for two products in each of the last four weeks is shown below.
Week
1 2 3 4
Demand product 1 23 27 34 40
Demand product 2 11 13 15 14
Apply exponential smoothing with a smoothing constant of 0.7 to generate a forecast for the demand for these products in week 5.
These products are produced using two machines, X and Y. Each unit of product 1 that is produced requires 15 minutes processing on machine X and 25 minutes
processing on machine Y. Each unit of product 2 that is produced requires 7 minutes processing on machine X and 45 minutes processing on machine Y. The available
time on machine X in week 5 is forecast to be 20 hours and on machine Y in week 5 is forecast to be 15 hours. Each unit of product 1 sold in week 5 gives a contribution
to profit of £10 and each unit of product 2 sold in week 5 gives a contribution to profit of £4.
It may not be possible to produce enough to meet your forecast demand for these products in week 5 and each unit of unsatisfied demand for product 1 costs £3, each
unit of unsatisfied demand for product 2 costs £1.
l Formulate the problem of deciding how much of each product to make in week 5 as a linear program.
l Solve this linear program graphically.
Solution
Note that the first part of the question is a forecasting question so it is solved below.
For product 1 applying exponential smoothing with a smoothing constant of 0.7 we get:
M1 = Y 1 = 23
M2 = 0.7Y 2 + 0.3M 1 = 0.7(27) + 0.3(23) = 25.80
M3 = 0.7Y 3 + 0.3M 2 = 0.7(34) + 0.3(25.80) = 31.54
M4 = 0.7Y 4 + 0.3M 3 = 0.7(40) + 0.3(31.54) = 37.46
The forecast for week five is just the average for week 4 = M4 = 37.46 = 31 (as we cannot have fractional demand).
For product 2 applying exponential smoothing with a smoothing constant of 0.7 we get:
M1 = Y 1 = 11
M2 = 0.7Y 2 + 0.3M 1 = 0.7(13) + 0.3(11) = 12.40
M3 = 0.7Y 3 + 0.3M 2 = 0.7(15) + 0.3(12.40) = 14.22
M4 = 0.7Y 4 + 0.3M 3 = 0.7(14) + 0.3(14.22) = 14.07
The forecast for week five is just the average for week 4 = M4 = 14.07 = 14 (as we cannot have fractional demand).
We can now formulate the LP for week 5 using the two demand figures (37 for product 1 and 14 for product 2) derived above.
Let
x1 be the number of units of product 1 produced
x2 be the number of units of product 2 produced
where x1, x2>=0
The constraints are:
15x1 + 7x 2 <= 20(60) machine X
25x1 + 45x 2 <= 15(60) machine Y
x1 <= 37 demand for product 1
x2 <= 14 demand for product 2
The objective is to maximise profit, i.e.
maximise 10x1 + 4x 2 3(37 x1) 1(14x2)
i.e. maximise 13x1 + 5x 2 125
2
The objective is to maximise profit, i.e.
maximise 10x1 + 4x 2 3(37 x1) 1(14x2)
i.e. maximise 13x1 + 5x 2 125
The graph is shown below, from the graph we have that the solution occurs on the horizontal axis (x2=0) at x 1=36 at which point the maximum profit is 13(36) + 5(0)
125 = £343
Linear programming example 1994 UG exam
A company is involved in the production of two items (X and Y). The resources need to produce X and Y are twofold, namely machine time for automatic processing and
craftsman time for hand finishing. The table below gives the number of minutes required for each item:
Machine time Craftsman time
Item X 13 20
Y 19 29
The company has 40 hours of machine time available in the next working week but only 35 hours of craftsman time. Machine time is costed at £10 per hour worked and
craftsman time is costed at £2 per hour worked. Both machine and craftsman idle times incur no costs. The revenue received for each item produced (all production is
sold) is £20 for X and £30 for Y. The company has a specific contract to produce 10 items of X per week for a particular customer.
l Formulate the problem of deciding how much to produce per week as a linear program.
l Solve this linear program graphically.
Solution
Let
l x be the number of items of X
l y be the number of items of Y
then the LP is:
maximise
l 20x + 30y 10(machine time worked) 2(craftsman time worked)
subject to:
l 13x + 19y <= 40(60) machine time
l 20x + 29y <= 35(60) craftsman time
l x >= 10 contract
l x,y >= 0
so that the objective function becomes
maximise
l 20x + 30y 10(13x + 19y)/60 2(20x + 29y)/60
i.e. maximise
l 17.1667x + 25.8667y
maximise
l 20x + 30y 10(13x + 19y)/60 2(20x + 29y)/60
i.e. maximise
l 17.1667x + 25.8667y
subject to:
l 13x + 19y <= 2400
l 20x + 29y <= 2100
l x >= 10
l x,y >= 0
It is plain from the diagram below that the maximum occurs at the intersection of x=10 and 20x + 29y <= 2100
Solving simultaneously, rather than by reading values off the graph, we have that x=10 and y=65.52 with the value of the objective function being £1866.5
Linear programming example 1992 UG exam
A company manufactures two products (A and B) and the profit per unit sold is £3 and £5 respectively. Each product has to be assembled on a particular machine, each
unit of product A taking 12 minutes of assembly time and each unit of product B 25 minutes of assembly time. The company estimates that the machine used for assembly
has an effective working week of only 30 hours (due to maintenance/breakdown).
Technological constraints mean that for every five units of product A produced at least two units of product B must be produced.
l Formulate the problem of how much of each product to produce as a linear program.
l Solve this linear program graphically.
l The company has been offered the chance to hire an extra machine, thereby doubling the effective assembly time available. What is the maximum amount you
would be prepared to pay (per week) for the hire of this machine and why?
Solution
Let
xA = number of units of A produced
xB = number of units of B produced
then the constraints are:
12xA + 25x B <= 30(60) (assembly time)
xB >= 2(x A /5)
i.e. xB 0.4x A >= 0
i.e. 5x B >= 2x A (technological)
where xA , xB >= 0
i.e. xB 0.4x A >= 0
i.e. 5x B >= 2x A (technological)
where xA , xB >= 0
and the objective is
maximise 3xA + 5x B
It is plain from the diagram below that the maximum occurs at the intersection of 12x A + 25x B = 1800 and x B 0.4x A = 0
Solving simultaneously, rather than by reading values off the graph, we have that:
xA = (1800/22) = 81.8
xB= 0.4x A = 32.7
with the value of the objective function being £408.9
with the value of the objective function being £817.8
Hence we have made an additional profit of £(817.8408.9) = £408.9 and this is the maximum amount we would be prepared to pay for the hire of the machine for
doubling the assembly time.
This is because if we pay more than this amount then we will reduce our maximum profit below the £408.9 we would have made without the new machine.
Linear programming example 1988 UG exam
Solve
minimise
4a + 5b + 6c
subject to
a + b >= 11
a b <= 5
c a b = 0
subject to
a + b >= 11
a b <= 5
c a b = 0
7a >= 35 12b
a >= 0 b >= 0 c >= 0
Solution
To solve this LP we use the equation cab=0 to put c=a+b (>= 0 as a >= 0 and b >= 0) and so the LP is reduced to
minimise
4a + 5b + 6(a + b) = 10a + 11b
subject to
a + b >= 11
a b <= 5
7a + 12b >= 35
a >= 0 b >= 0
From the diagram below the minimum occurs at the intersection of a b = 5 and a + b = 11
i.e. a = 8 and b = 3 with c (= a + b) = 11 and the value of the objective function 10a + 11b = 80 + 33 = 113.
Linear programming example 1987 UG exam
Solve the following linear program:
maximise 5x1 + 6x 2
subject to
x1 + x 2 <= 10
x1 x2 >= 3
5x1 + 4x 2 <= 35
x1 >= 0
x2 >= 0
Solution
5x1 + 4x 2 <= 35
x1 >= 0
x2 >= 0
Solution
It is plain from the diagram below that the maximum occurs at the intersection of
5x1 + 4x 2 = 35 and
x1 x2 = 3
Solving simultaneously, rather than by reading values off the graph, we have that
5(3 + x 2) + 4x 2 = 35
i.e. 15 + 9x 2 = 35
i.e. x2 = (20/9) = 2.222 and
x1 = 3 + x 2 = (47/9) = 5.222
The maximum value is 5(47/9) + 6(20/9) = (355/9) = 39.444
Linear programming example 1986 UG exam
A carpenter makes tables and chairs. Each table can be sold for a profit of £30 and each chair for a profit of £10. The carpenter can afford to spend up to 40 hours per
week working and takes six hours to make a table and three hours to make a chair. Customer demand requires that he makes at least three times as many chairs as tables.
Tables take up four times as much storage space as chairs and there is room for at most four tables each week.
Formulate this problem as a linear programming problem and solve it graphically.
Solution
Variables
Let
xT = number of tables made per week
xC = number of chairs made per week
Constraints
total work time
l
6xT + 3x C <= 40
l customer demand
l total work time
6xT + 3x C <= 40
l customer demand
xC >= 3x T
l storage space
(xC/4) + x T <= 4
l all variables >= 0
Objective
maximise 30xT + 10x C
The graphical representation of the problem is given below and from that we have that the solution lies at the intersection of
(xC/4) + x T = 4 and 6x T + 3x C = 40
Solving these two equations simultaneously we get xC = 10.667, x T = 1.333 and the corresponding profit = £146.667