0% found this document useful (0 votes)
262 views4 pages

Tutorial 1 Wellflo

This document provides instructions for simulating oil and water production from a quarter five-spot reservoir model using Eclipse reservoir simulation software. It describes setting up a 3D gridded model with 5x5x3 blocks and heterogeneous permeability fields. It also provides initial fluid properties, well locations and production schedules, and specifies the output data requested. The goal is to simulate two-phase oil and water production over 10 time steps of 200 days each from a reservoir initially at 4500 psia pressure and produce results to evaluate the pressure response and well/field performance over time.

Uploaded by

Vigna Ruban Ram
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
Download as docx, pdf, or txt
0% found this document useful (0 votes)
262 views4 pages

Tutorial 1 Wellflo

This document provides instructions for simulating oil and water production from a quarter five-spot reservoir model using Eclipse reservoir simulation software. It describes setting up a 3D gridded model with 5x5x3 blocks and heterogeneous permeability fields. It also provides initial fluid properties, well locations and production schedules, and specifies the output data requested. The goal is to simulate two-phase oil and water production over 10 time steps of 200 days each from a reservoir initially at 4500 psia pressure and produce results to evaluate the pressure response and well/field performance over time.

Uploaded by

Vigna Ruban Ram
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1/ 4

EclipseexerciseadaptedfromHeriotWattUniversityReservoirSimulationmodule

PAB3053RESERVOIRMODELINGAND
SIMULATION(3D2Phase)
ECLIPSETUTORIAL1
PAB3053RESERVOIRMODELINGANDSIMULATION
PROJECT1(10%)
(3D2Phase)
A

Prepareaninputdatafileforsimulatingtheperformanceofatwophase(water/oil)reservoir.
The model will have a regular shape, with two wells at opposite corners to simulate
productioninaquarterfivespotpattern.
GRIDDINGANDROCKDATA(GRID)
The3Dsectionofreservoirbeingmodelledhasdimensions2500'x2500'x150',anditis
dividedintothreelayersofequalthickness.Thenumberofcellsinthexandydirectionsare
5and5respectively.Otherrelevantdataaregivenbelow,usingfieldunitsthroughout:
Depthofreservoirtop:
Porosity:

8000ft
0.20

Permeabilityinxdirection:
Permeabilityinydirection:
Permeabilityinzdirection:

Layer1
200mD
150mD
25mD

Layer2
1000mD
800mD
100mD

Layer3
200mD
150mD
25mD

EclipseexerciseadaptedfromHeriotWattUniversityReservoirSimulationmodule

500

50

500

50

500

50

500
1

500
2

5
500

500

500

500

500

Figure1:Schematicofmodel.

FLUIDPVTANDFLUIDROCKINTERACTIONPROPERTIES(PROPS)
WaterandOilRelativePermeabilityandCapillaryPressureFunctions
krw

kro

Pcow
(psi)

table1for1000mD
0.15*
0.45
0.68
0.8

0.0
0.2
0.4
0.55

0.9
0.3
0.1
0.0

4.0
0.8
0.2
0.1

table2for200mD
0.25*
0.5
0.7
0.8

0.0
0.2
0.4
0.55

0.9
9.0
0.3
1.8
0.1
0.45
0.0
0.22
*Initialsaturationthroughoutlayer.

WaterSaturation

WaterPVTDataatReservoirPressureandTemperature
Pressure
(psia)

Bw
(rb/stb)

w
(cp)

cw

(psi1)

EclipseexerciseadaptedfromHeriotWattUniversityReservoirSimulationmodule

4500

1.02

3.0E06

0.8

OilPVTData,BubblePointPressure(Pb)=300psia
Pressure
(psia)
300
800
6000

Bo
(rb/stb)
1.20
1.15
1.10

Viscosity
(cp)
1.0
1.1
2.0

Rockcompressibilityat4500psia: 4E06psi1
Oildensityatsurfaceconditions:
49lbs/cf
Waterdensityatsurfaceconditions: 63lbs/cf

INITIALCONDITIONS(SOLUTION)
Initialpressureat8075':

4500psia

Theoilwatercontactisbelowthereservoir(8,500ft),withzerocapillarypressureatthe
contact.

WELLSANDPRODUCTIONSCHEDULE(SCHEDULE)
Drilltwowells:
producerPROD,belongingtogroupG1,inBlockNo.(1,1)
injectorINJ,belongingtogroupG2,inBlockNo.(5,5)
Theinsidediameterofthewellsis8".
Perforateboththeproducerandtheinjectorinallthreelayers.
Thedatumdepthforpressuremeasurementsduringproductionis8,000fti.e.thepressure
gaugeislocatedjustabovethetopofthecompletion.
Produceatthegrossrateof10,000stbliquid/daywithaminimumbottomholepressurelimit
of2,000psia
Inject11,000stbwater/daywithamaximumbottomholepressurelimitof6,000psia.
Startthesimulationon1Jun2015,anduse10timestepsof200dayseach.

EclipseexerciseadaptedfromHeriotWattUniversityReservoirSimulationmodule

OUTPUT(SUMMARY,GRID&SCHEDULE)
Asktheprogramtooutputthefollowingdata:
Initialpermeability,porosityanddepthdata(keywordINITinGRIDsection)
InitialgridblockpressuresandwatersaturationsintoaRESTARTfile(keywordRPTRST
inSOLUTIONsectionsetBASIC=2togivebasicdynamicoutputatt=0)
FieldAveragePressure
(FPR)
BottomHolePressureforbothwells (WBHP)
FieldOilProductionRate
(FOPR)
FieldWaterProductionRate
(FWPR)
TotalFieldOilProduction
(FOPT)
TotalFieldWaterProduction
(FWPT)
WellWaterCutforPROD
(WWCT)
CPUusage
(TCPU)
toaseparateExcelreadablefile(usingkeywordEXCEL)intheSUMMARYsection.
GridblockpressuresandwatersaturationsintoRESTARTfilesateachreportstepofthe
simulation(keywordRPTRSTinSCHEDULEsectionagainsetBASIC=2togivebasic
dynamicoutputateachTSTEP)
PROCEDURE
1 Edit file TUT1A.DATA in folder \eclipse\tut1 by opening it in Notepad, fill in the
necessary data, and save the file. (Make sure the file ending is .DATA and not .txt)
2

ActivatetheECLIPSELauncherfromtheDesktoportheStartmenu.

RunECLIPSEandusetheTUT1Adataset.
4 Whenthesimulationhasfinished,useECLIPSEOffice>ResultsandmenuFile>Open
>SUMMARY>AllVectors,oruseMSExceltoopentheoutputfile TUT1A.RSM,
whichwillbeinthe\eclipse\tut1folder.
5 PlottheBHPofbothwells(WBHP)vs.timeandthefieldaveragepressure(FPR)vs.
timeonFigure1.
6 Plotthewatercut(WWCT)ofthewellPRODandthefieldoilproductionrate(FOPR)
vs.timeonFigure2.
7 PlotonFigure3theBHPvaluesforthefirst10daysintherange3,500psiato5,500psia.
8RunFloviztodisplaythegridcelloilsaturations

You might also like