Chapter 9 - Program Control Instructions
Chapter 9 - Program Control Instructions
9.1
Hardwired
master control
relay circuit.
9.2
Jump Instruction
2011, The McGraw-Hill Companies, Inc.
Effect on
instructions
of jumped
rungs.
9.3
Subroutine Functions
2011, The McGraw-Hill Companies, Inc.
SBR
(Subroutine)
Identifies the
subroutine
program.
Main
Program
Subroutine
Program
2011, The McGraw-Hill Companies, Inc.
Setting up a
subroutine file.
Passing
subroutine
parameters
Nested subroutines.
9.4
Immediate input
(IIN)
PLC-5 instruction
is used to read an
input condition
before the I/O
update is performed.
2011, The McGraw-Hill Companies, Inc.
Immediate output
(IOT)
PLC-5 instruction
is used to update the
status of an output
device before the I/O
update is performed.
Immediate input
instruction operation.
Immediate output
instruction operation.
9.5
Forcing is accomplished
regardless of the actual
state of the field device.
2011, The McGraw-Hill Companies, Inc.
Forcing an
input on.
Forcing an
output on.
9.6
Safety Circuitry
2011, The McGraw-Hill Companies, Inc.
Sufficient emergency
circuits must be
provided to stop
either partially or
totally the operation of
the controller or the
controlled machine or
process.
These circuits should
be hardwired outside
the controller.
2011, The McGraw-Hill Companies, Inc.
Safety wiring
requirements for a
PLC installation.
The master
control relay
must be able
to inhibit all
machine
motion by
removing
power to the
machine I/O
devices when
the relay is
deenergized.
2011, The McGraw-Hill Companies, Inc.
9.7
Selectable Timed
Interrupt
2011, The McGraw-Hill Companies, Inc.
9.8
Fault Routine
2011, The McGraw-Hill Companies, Inc.
9.9
Temporary End
Instruction
2011, The McGraw-Hill Companies, Inc.
9.10
Suspend Instruction
2011, The McGraw-Hill Companies, Inc.