Modular Construction
Modular Construction
can be achieved by the air curing/ curing compounds. These forms are
made strong and sturdy, fabricated with accuracy and easy to handle.
The components are made out of aluminium and hence are very light
weight. They afford large number of repetitions (around 250). The repropping is simple hence short cycle time can be achieved.
A. WALL COMPONENTS:1) Wall Panel: - It forms the face of the wall. It is an Aluminium sheet
properly cut to fit the exact size of the wall
3) Kicker:- It forms the wall face at the top of the panels and acts as a
ledge to support.
C. DECK COMPONENT:1) Deck Panel:- It forms the horizontal surface for casting of slabs. It is
built for proper safety of workers.
2) Deck Prop:- It forms a V-shaped prop head. It supports the deck and
bears the load coming on the deck panel.
The system creates an efficient load bearing structure for use in a wide
variety of applications. It is particularly effective in projects suited to
repetitive cellular construction such as residential blocks, hotels,
student accommodation, barracks and prisons
METHOD
During the tunnel form construction process, a structural tunnel is
created by pouring concrete into steel formwork to make the floors and
walls in one monolithic process. Each 24 hours, the formwork is moved
so that another tunnel can be formed. When a storey has been
completed, the process is repeated on the next floor. A strong,
monolithic structure is thus constructed that can reach 40 or more
storeys in height.
ASSIGNMENT
MODULAR CONSTRUCTION
3.WASTE MINIMISATION
Modular construction makes it possible to optimize construction
materials purchases and usage while minimizing onsite waste and
offering a higher quality product to the buyer.
4. LESS SITE DISTURBANCE