0% found this document useful (0 votes)
307 views3 pages

Guarantee Technical Parameters

This document outlines technical parameters and performance guarantees for a power transmission project. It includes: 1. Performance parameters will be tested and approved according to MSEDCL/MSETCL standards, including materials like conductors, insulators, towers, and equipment. 2. All materials must come from approved MSEDCL/MSETCL vendors and have valid test certificates. 3. Tests will be conducted according to MSEDCL/MSETCL test standards and procedures. Liquidated damages will apply if any performance parameters or guarantees are not met.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
Download as docx, pdf, or txt
0% found this document useful (0 votes)
307 views3 pages

Guarantee Technical Parameters

This document outlines technical parameters and performance guarantees for a power transmission project. It includes: 1. Performance parameters will be tested and approved according to MSEDCL/MSETCL standards, including materials like conductors, insulators, towers, and equipment. 2. All materials must come from approved MSEDCL/MSETCL vendors and have valid test certificates. 3. Tests will be conducted according to MSEDCL/MSETCL test standards and procedures. Liquidated damages will apply if any performance parameters or guarantees are not met.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1/ 3

Guarantee Technical Parameters

Sr.N
Performance Parameter Test Method
o.
GTP Approval will be as per MSEDCL/MSETCL
Standards.
Following Items are included
i)ACSS 0.4 Zebra HTLS Conductor
ii)Columns and Structure
Approved GTP
iii) Suspension Type Polymeric Insulator
1 Document from
iv)60+3M D/C Tower
MSETCL
v)Earthing Pit Material
vi) Clamps and Connector
vii) Earth Wire
viii) Bus Post Insulator
ix) 0.2 ACSR Zebra Conductor
Approved List of
Material Supply should be from
2 Vendors from
MSETCL/MSEDCL Approved Vendor Only
MSETCL/MSEDCL
Test Certificates from
All Material Shall Comply with Valid Test MSETCL/MSEDCL
3
Certificates and Manuals. Approved Testing
Centers
Test must be conducted as per As per Norms guided
4
MSETCL/MSECL Test Standards by MSETCL/MSEDCL
Inspection report to be submitted prior to
5 -
Dispatch.
Successful Charging & Commissioning of
6 -
Equipment
Performance Guarantee parameters for LD Clause
Sr.N L/D
Performance Parameter Clause
o. Weightage
GTP Approval will be as per
MSEDCL/MSETCL Standards.
Following Items are included
i)ACSS 0.4 Zebra HTLS
Conductor LD will be applicable, if
ii)Columns and Structure supplier fails to produce
1 25 %
iii) Suspension Type Polymeric Approval GTP as per PG
Insulator Parameters
iv)60+3M D/C Tower
v)Earthing Pit Material
vi) Clamps and Connector
vii) Earth Wire
LD will be applicable, if
Material Supply should be
supplier fails to produce
2 from MSETCL/MSEDCL 25 %
Approval as per PG
Approved Vendor Only
Parameters
LD will be applicable, if
All Material Shall Comply with
supplier fails to produce
3 Valid Test Certificates and 20 %
Approval GTP as per PG
Manuals.
Parameters
LD will be applicable, if
Test must be conducted as per supplier fails to produce
4 15 %
MSETCL/MSECL Test Standards Test Certificates as per
PG Parameters
LD will be applicable, if
Inspection report to be supplier fails to produce
5 5%
submitted prior to Dispatch. Inspection report as per
PG Parameters
LD will be applicable, if
Successful Charging &
6 10 % issues arises during
Commissioning of Equipment
Charging Process.
Total
100 %
Remarks

1. The LD % will be decided at the time of Commercial Negotiation.


2. Percentage of LD mentioned in the above table means % of the
maximum LD for Non fulfillment of Guarantee Figures Fixed in the
Contract.
3. Penalty against rejection of any performance parameter will be decided
at the time of Commercial Negotiation.

You might also like